New Buck Corporation 85 installation instructions

Page 2
Image 2
Contents Page Page TABLE OF CONTENTS Page READ THIS FIRST INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL IMPORTANT INSTRUCTIONSSECTION INTRODUCTIONSECTION MASONRY INSERT INSTALLATION MODELMaterial MINIMUM CLEARANCESK* FACTORS OF ALTERNATE MATERIALS Required ThicknessPOSSIBLE TOOLS NEEDED FOR INSTALLATION INSTALLATION PREPARATION FIREPLACEInstallation Procedure Positioning the Heater Mounting the Trim PanelsFinal Check Final Check 5.Check for smoke leaks around the doors SECTION PRE-FABINSERT INSTALLATION MINIMUM CLEARANCE TO COMBUSTIBLE MATERIAL SECTION RESIDENTIAL FREE-STANDINGINSTALLATIONPREPARING THE STOVE FOR INSTALLATION Material ALTERNATE FLOOR PROTECTORS MATERIALK* FACTORS OF ALTERNATE MATERIALS Required ThicknessChimney DETERMINING THE CHIMNEY LOCATIONB.Wall Exit Into Metal Tee-Box C. Wall Exit Into Masonry Using Single Wall Pipe D. Ceiling Exit-CloseClearance ALCOVE INSTALLATION CLEARANCES FINAL CHECK CLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLES FREE-STANDINGCLEARANCES FOR MODEL MODEL 85 INSTALLATION OF CLOSE CLEARANCE SHIELDS OptionalCHIMNEY FREE-STANDINGMOBILE HOME INSTALLATIONFOR MINIMUM CLEARANCES SEE PAGE FLOOR PROTECTION SECTIONWARNING DO NOT INSTALL IN A SLEEPING ROOM TOOLS FOR INSTALLATIONPREPARING THE HEATER FOR INSTALLATION PREPARING THE ROOM HEATER LOCATION5.Next, remove the four 4 screws holding the heater to the stand. Position heater out of the way of the installation area Ceiling Exit Using Close Clearance Listed Chimney FINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRE ROOM AIR BLOWER OPERATION SOLUTION TROUBLESHOOTINGPROBLEM POSSIBLE CAUSEEPA COMPLIANCE STATUS MODEL WOOD STOVEREPLACEMENT PARTS FOR THE MODEL PRODUCTS COVERED WARRANTY TIME PERIODSPROCEDURE PRODUCTS NOT COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS