New Buck Corporation 85 installation instructions Alcove Installation Clearances

Page 21
ALCOVE INSTALLATION CLEARANCES

CEILING SUPPORT

BOX

CHIMNEY CONNECTOR

SINGLE WALL

PIPE

Figure 8

Close Clearance Installation using: (1) 6" Simpson Dura-Vent single wall chimney connector Dura Black and 6" Simpson Dura-Vent 2100 Deg Ht. “Type DP” chimney. (2) 6" Metal Fab Type single wall connector- 6" Metal Fab 2100 HT chimney. (3) Ameritec. For minimum clearances see pages 20 & 21.

ALCOVE INSTALLATION CLEARANCES

Must use 6" Single Wall Connector and 6" Type HT Pipe listed for close clearance reduction listed in this manual. For minimum clearances see pages 21 & 22. Must also use close clear- ance shield kit.

19

Image 21
Contents Page Page TABLE OF CONTENTS Page MAINTENANCE INSTRUCTIONS MODEL INSTALLATION, OPERATION, ANDREAD THIS FIRST IMPORTANT INSTRUCTIONSINTRODUCTION SECTIONMODEL SECTION MASONRY INSERT INSTALLATIONK* FACTORS OF ALTERNATE MATERIALS MINIMUM CLEARANCESMaterial Required ThicknessINSTALLATION PREPARATION FIREPLACE POSSIBLE TOOLS NEEDED FOR INSTALLATIONMounting the Trim Panels Installation Procedure Positioning the HeaterFinal Check Final Check 5.Check for smoke leaks around the doors SECTION PRE-FABINSERT INSTALLATION SECTION RESIDENTIAL FREE-STANDINGINSTALLATION PREPARING THE STOVE FOR INSTALLATIONMINIMUM CLEARANCE TO COMBUSTIBLE MATERIAL K* FACTORS OF ALTERNATE MATERIALS ALTERNATE FLOOR PROTECTORS MATERIALMaterial Required ThicknessDETERMINING THE CHIMNEY LOCATION ChimneyB.Wall Exit Into Metal Tee-Box C. Wall Exit Into Masonry Using Single Wall Pipe D. Ceiling Exit-CloseClearance ALCOVE INSTALLATION CLEARANCES FINAL CHECK MINIMUM CLEARANCES TO COMBUSTIBLES FREE-STANDING CLEARANCES FOR MODELCLEARANCES FOR MODEL Optional MODEL 85 INSTALLATION OF CLOSE CLEARANCE SHIELDSFOR MINIMUM CLEARANCES SEE PAGE FLOOR PROTECTION FREE-STANDINGMOBILE HOME INSTALLATIONCHIMNEY SECTIONPREPARING THE HEATER FOR INSTALLATION TOOLS FOR INSTALLATIONWARNING DO NOT INSTALL IN A SLEEPING ROOM PREPARING THE ROOM HEATER LOCATION5.Next, remove the four 4 screws holding the heater to the stand. Position heater out of the way of the installation area Ceiling Exit Using Close Clearance Listed Chimney FINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRE ROOM AIR BLOWER OPERATION PROBLEM TROUBLESHOOTINGSOLUTION POSSIBLE CAUSEMODEL WOOD STOVE EPA COMPLIANCE STATUSREPLACEMENT PARTS FOR THE MODEL PROCEDURE WARRANTY TIME PERIODSPRODUCTS COVERED PRODUCTS NOT COVEREDOTHER RIGHTS CONDITIONS AND EXCLUSIONS