New Buck Corporation 85 installation instructions

Page 4

2

Image 4
Contents Page Page TABLE OF CONTENTS Page INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS MODELREAD THIS FIRST IMPORTANT INSTRUCTIONSSECTION INTRODUCTIONSECTION MASONRY INSERT INSTALLATION MODELMINIMUM CLEARANCES K* FACTORS OF ALTERNATE MATERIALSMaterial Required ThicknessPOSSIBLE TOOLS NEEDED FOR INSTALLATION INSTALLATION PREPARATION FIREPLACEInstallation Procedure Positioning the Heater Mounting the Trim PanelsFinal Check Final Check 5.Check for smoke leaks around the doors SECTION PRE-FABINSERT INSTALLATION PREPARING THE STOVE FOR INSTALLATION SECTION RESIDENTIAL FREE-STANDINGINSTALLATIONMINIMUM CLEARANCE TO COMBUSTIBLE MATERIAL ALTERNATE FLOOR PROTECTORS MATERIAL K* FACTORS OF ALTERNATE MATERIALSMaterial Required ThicknessChimney DETERMINING THE CHIMNEY LOCATIONB.Wall Exit Into Metal Tee-Box C. Wall Exit Into Masonry Using Single Wall Pipe D. Ceiling Exit-CloseClearance ALCOVE INSTALLATION CLEARANCES FINAL CHECK CLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLES FREE-STANDINGCLEARANCES FOR MODEL MODEL 85 INSTALLATION OF CLOSE CLEARANCE SHIELDS OptionalFREE-STANDINGMOBILE HOME INSTALLATION FOR MINIMUM CLEARANCES SEE PAGE FLOOR PROTECTIONCHIMNEY SECTIONTOOLS FOR INSTALLATION PREPARING THE HEATER FOR INSTALLATIONWARNING DO NOT INSTALL IN A SLEEPING ROOM PREPARING THE ROOM HEATER LOCATION5.Next, remove the four 4 screws holding the heater to the stand. Position heater out of the way of the installation area Ceiling Exit Using Close Clearance Listed Chimney FINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRE ROOM AIR BLOWER OPERATION TROUBLESHOOTING PROBLEMSOLUTION POSSIBLE CAUSEEPA COMPLIANCE STATUS MODEL WOOD STOVEREPLACEMENT PARTS FOR THE MODEL WARRANTY TIME PERIODS PROCEDUREPRODUCTS COVERED PRODUCTS NOT COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS