New Buck Corporation 85 installation instructions Table Of Contents

Page 3

TABLE OF CONTENTS

 

Important Instructions

3

SECTION I: Introduction

4

SECTION II: Masonry Insert Installation

5

Installation Preparation-Fireplace

7

Mounting the Trim Panels

8

SECTION III: Pre-Fab Insert Installation

12

SECTION IV: Residential Freestanding Installation

13

Freestanding Installation Clearances

21

Installation of Close Clearances Shields

23

SECTION V: Freestanding Mobile Home Installation

24

SECTION VI: Wood Heater Safety

29

SECTION VII: Operation

30

SECTION VIII: Room air blower operation

32

SECTION IX: Troubleshooting

33

Parts List

36

Warranty

37

1

Image 3
Contents Page Page TABLE OF CONTENTS Page IMPORTANT INSTRUCTIONS INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL READ THIS FIRSTINTRODUCTION SECTIONMODEL SECTION MASONRY INSERT INSTALLATIONRequired Thickness MINIMUM CLEARANCESK* FACTORS OF ALTERNATE MATERIALS MaterialINSTALLATION PREPARATION FIREPLACE POSSIBLE TOOLS NEEDED FOR INSTALLATIONMounting the Trim Panels Installation Procedure Positioning the HeaterFinal Check Final Check 5.Check for smoke leaks around the doors SECTION PRE-FABINSERT INSTALLATION SECTION RESIDENTIAL FREE-STANDINGINSTALLATION PREPARING THE STOVE FOR INSTALLATIONMINIMUM CLEARANCE TO COMBUSTIBLE MATERIAL Required Thickness ALTERNATE FLOOR PROTECTORS MATERIALK* FACTORS OF ALTERNATE MATERIALS MaterialDETERMINING THE CHIMNEY LOCATION ChimneyB.Wall Exit Into Metal Tee-Box C. Wall Exit Into Masonry Using Single Wall Pipe D. Ceiling Exit-CloseClearance ALCOVE INSTALLATION CLEARANCES FINAL CHECK MINIMUM CLEARANCES TO COMBUSTIBLES FREE-STANDING CLEARANCES FOR MODELCLEARANCES FOR MODEL Optional MODEL 85 INSTALLATION OF CLOSE CLEARANCE SHIELDSSECTION FREE-STANDINGMOBILE HOME INSTALLATIONFOR MINIMUM CLEARANCES SEE PAGE FLOOR PROTECTION CHIMNEYPREPARING THE ROOM HEATER LOCATION TOOLS FOR INSTALLATIONPREPARING THE HEATER FOR INSTALLATION WARNING DO NOT INSTALL IN A SLEEPING ROOM5.Next, remove the four 4 screws holding the heater to the stand. Position heater out of the way of the installation area Ceiling Exit Using Close Clearance Listed Chimney FINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRE ROOM AIR BLOWER OPERATION POSSIBLE CAUSE TROUBLESHOOTINGPROBLEM SOLUTIONMODEL WOOD STOVE EPA COMPLIANCE STATUSREPLACEMENT PARTS FOR THE MODEL PRODUCTS NOT COVERED WARRANTY TIME PERIODSPROCEDURE PRODUCTS COVEREDOTHER RIGHTS CONDITIONS AND EXCLUSIONS