New Buck Corporation 85 installation instructions Epa Compliance Status, Model Wood Stove

Page 36
EPA COMPLIANCE STATUS

EPA COMPLIANCE STATUS

The Model 85 heater meets the U.S. Environmental Protection Agency’s Emission limits for wood heaters sold after July 1, 1992. Under specific conditions this heater has been shown to deliver heat at rates ranging from approximately 10,000 to 45,000 BTU/hr for the Model 85.

MODEL 85

WOOD STOVE

 

 

 

 

 

 

(41)

(4)

 

 

 

(5)

(39)

 

 

(1)

1

(11)

(20)

(32)

 

 

 

 

 

 

 

 

 

 

 

 

(13)

 

 

 

 

 

 

 

 

(7)

 

(14)

 

 

 

 

 

 

 

 

(37)

& (38)

 

 

 

 

 

 

 

 

 

 

(40)

 

 

 

 

 

 

 

 

 

 

(18)

 

(17)

 

 

 

 

(31)

 

 

 

(33)

 

 

 

 

 

 

(27)

(3)

 

(8)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(12)

 

 

(19)

 

 

 

 

 

 

 

(2)

 

 

(35)

6

(28

(23)

 

 

 

(9)

 

 

(34)

 

 

 

 

 

(36)

 

 

 

 

 

 

 

 

 

 

(29)

(25)

(24)

(26)

 

 

 

 

(10)

 

 

(30)

 

 

 

 

 

 

 

 

(22)

 

 

 

 

 

 

 

 

 

 

 

 

 

1.

Secondary air tubes

16.

NO PART

30.

Disc thermostat

2.

Blower control (rheostat)

17.

Door glass & logo

31.

Door handle & brass spring handle

3.

Primary air control

18.

Glass clips

32.

Air wash screen

4.

Warm air outlets

19.

Hearth Brass

33.

Glass gasket

5.

Baffles (interior of stove)

20.

Door Gasket

34.

Cover door hinge

6.

Air inlet

21.

Side glass

35.

Magnet holder

7.

Door

22.

Leveling screws

36.

Cover door Magnet

8.

Hearth extension

23.

Firebrick

37.

Door latch

9.

Power cord

24.

Motor

38.

Door latch screw

10.

Legs

25.

Motor mount bracket

39.

Blanket

11.

Stainless steel plate

26.

Cover Door

40.

Hinge pins

12.

Automatic/off/man. switch

27.

Cover door screws

41.

6" Flue exit

13.

Brass cap

28.

Shot gun air box

 

 

14.

Hinge Block

29.

Ash pan

 

 

15.

NO PART

 

 

 

 

34

Image 36
Contents Page Page TABLE OF CONTENTS Page INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS MODELREAD THIS FIRST IMPORTANT INSTRUCTIONSSECTION INTRODUCTIONSECTION MASONRY INSERT INSTALLATION MODELMINIMUM CLEARANCES K* FACTORS OF ALTERNATE MATERIALSMaterial Required ThicknessPOSSIBLE TOOLS NEEDED FOR INSTALLATION INSTALLATION PREPARATION FIREPLACEInstallation Procedure Positioning the Heater Mounting the Trim PanelsFinal Check Final Check 5.Check for smoke leaks around the doors SECTION PRE-FABINSERT INSTALLATION SECTION RESIDENTIAL FREE-STANDINGINSTALLATION PREPARING THE STOVE FOR INSTALLATIONMINIMUM CLEARANCE TO COMBUSTIBLE MATERIAL ALTERNATE FLOOR PROTECTORS MATERIAL K* FACTORS OF ALTERNATE MATERIALSMaterial Required ThicknessChimney DETERMINING THE CHIMNEY LOCATIONB.Wall Exit Into Metal Tee-Box C. Wall Exit Into Masonry Using Single Wall Pipe D. Ceiling Exit-CloseClearance ALCOVE INSTALLATION CLEARANCES FINAL CHECK CLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLES FREE-STANDINGCLEARANCES FOR MODEL MODEL 85 INSTALLATION OF CLOSE CLEARANCE SHIELDS OptionalFREE-STANDINGMOBILE HOME INSTALLATION FOR MINIMUM CLEARANCES SEE PAGE FLOOR PROTECTIONCHIMNEY SECTIONTOOLS FOR INSTALLATION PREPARING THE HEATER FOR INSTALLATIONWARNING DO NOT INSTALL IN A SLEEPING ROOM PREPARING THE ROOM HEATER LOCATION5.Next, remove the four 4 screws holding the heater to the stand. Position heater out of the way of the installation area Ceiling Exit Using Close Clearance Listed Chimney FINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRE ROOM AIR BLOWER OPERATION TROUBLESHOOTING PROBLEMSOLUTION POSSIBLE CAUSEEPA COMPLIANCE STATUS MODEL WOOD STOVEREPLACEMENT PARTS FOR THE MODEL WARRANTY TIME PERIODS PROCEDUREPRODUCTS COVERED PRODUCTS NOT COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS