New Buck Corporation 85 installation instructions Section, Introduction

Page 6
SECTION I

SECTION I

INTRODUCTION

Your

Buck Stove is a non-catalytic

unit

designed to meet

the

most

stringent

emissions standards without the use

of a

catalytic combustor.

This effect is

achieved

through

the use of a secondary

air which is mixed with primary air in

the unit's

firebox.

For peak performance we suggest the use of hard seasoned wood.

 

DO NOT BURN GARBAGE OR FLAMMABLE FLUIDS.

The primary air, which is controlled by the user, burns the wood. Secondary air is admitted into the firebox through the secondary air tubes at the top of the firebox. This secondary air burns the impurities in the smoke released from the initial wood burning. The temperature necessary for this combustion is maintained through the firebrick refractory. If any more technical information is necessary, contact your local dealer.

This heater is equipped with a standard room air blower.

For operation and use of these electrical assemblies, see instructions provided in this manual on page 30.

4

Image 6
Contents Page Page TABLE OF CONTENTS Page READ THIS FIRST INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL IMPORTANT INSTRUCTIONSSECTION INTRODUCTIONSECTION MASONRY INSERT INSTALLATION MODELMaterial MINIMUM CLEARANCESK* FACTORS OF ALTERNATE MATERIALS Required ThicknessPOSSIBLE TOOLS NEEDED FOR INSTALLATION INSTALLATION PREPARATION FIREPLACEInstallation Procedure Positioning the Heater Mounting the Trim PanelsFinal Check Final Check 5.Check for smoke leaks around the doors SECTION PRE-FABINSERT INSTALLATION SECTION RESIDENTIAL FREE-STANDINGINSTALLATION PREPARING THE STOVE FOR INSTALLATIONMINIMUM CLEARANCE TO COMBUSTIBLE MATERIAL Material ALTERNATE FLOOR PROTECTORS MATERIALK* FACTORS OF ALTERNATE MATERIALS Required ThicknessChimney DETERMINING THE CHIMNEY LOCATIONB.Wall Exit Into Metal Tee-Box C. Wall Exit Into Masonry Using Single Wall Pipe D. Ceiling Exit-CloseClearance ALCOVE INSTALLATION CLEARANCES FINAL CHECK CLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLES FREE-STANDINGCLEARANCES FOR MODEL MODEL 85 INSTALLATION OF CLOSE CLEARANCE SHIELDS OptionalCHIMNEY FREE-STANDINGMOBILE HOME INSTALLATIONFOR MINIMUM CLEARANCES SEE PAGE FLOOR PROTECTION SECTIONWARNING DO NOT INSTALL IN A SLEEPING ROOM TOOLS FOR INSTALLATIONPREPARING THE HEATER FOR INSTALLATION PREPARING THE ROOM HEATER LOCATION5.Next, remove the four 4 screws holding the heater to the stand. Position heater out of the way of the installation area Ceiling Exit Using Close Clearance Listed Chimney FINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRE ROOM AIR BLOWER OPERATION SOLUTION TROUBLESHOOTINGPROBLEM POSSIBLE CAUSEEPA COMPLIANCE STATUS MODEL WOOD STOVEREPLACEMENT PARTS FOR THE MODEL PRODUCTS COVERED WARRANTY TIME PERIODSPROCEDURE PRODUCTS NOT COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS