New Buck Corporation 85 installation instructions Final Check

Page 30
Manual background

(a)Chimney pipe is 3' higher than roof at the point where it penetrates the roof.

(b)Chimney pipe height is at least 2' higher than any part of the roof within 10' of the chimney. (See Figure 12.)

4.Next, install a New Buck Corporation chimney connector to the flue of the heater or use 3 “Ell” brackets and secure to the top of the heater and pipe.

5.Using single wall chimney connector, connect the heater to the chimney by following manufacturer’s installation instructions exactly. (See Figure 13.)

Manual background CEILING SUPPORT BOX

CHIMNEY CONNECTOR

SINGLE WALL PIPE

 

Figure 13

FINAL CHECK

1.Recheck the specified clearances.

2.Remove all foreign material from the firebox area.

3.Open the primary air draft.

NOTE: Plug the power cord into a 115V AC outlet. Set switch to “Manual” and rheostat to “High” position to ensure motor operates properly. Route the cord to prevent damage to the cord insulation from heat and sharp objects. Keep the cord out of the way of traffic to prevent

28

Image 30
Contents Page Page TABLE OF CONTENTS Page READ THIS FIRST INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL IMPORTANT INSTRUCTIONSSECTION INTRODUCTIONSECTION MASONRY INSERT INSTALLATION MODELMaterial MINIMUM CLEARANCESK* FACTORS OF ALTERNATE MATERIALS Required ThicknessPOSSIBLE TOOLS NEEDED FOR INSTALLATION INSTALLATION PREPARATION FIREPLACEInstallation Procedure Positioning the Heater Mounting the Trim PanelsFinal Check Final Check 5.Check for smoke leaks around the doors SECTION PRE-FABINSERT INSTALLATION SECTION RESIDENTIAL FREE-STANDINGINSTALLATION PREPARING THE STOVE FOR INSTALLATIONMINIMUM CLEARANCE TO COMBUSTIBLE MATERIAL Material ALTERNATE FLOOR PROTECTORS MATERIALK* FACTORS OF ALTERNATE MATERIALS Required ThicknessChimney DETERMINING THE CHIMNEY LOCATIONB.Wall Exit Into Metal Tee-Box C. Wall Exit Into Masonry Using Single Wall Pipe D. Ceiling Exit-CloseClearance ALCOVE INSTALLATION CLEARANCES FINAL CHECK CLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLES FREE-STANDINGCLEARANCES FOR MODEL MODEL 85 INSTALLATION OF CLOSE CLEARANCE SHIELDS OptionalCHIMNEY FREE-STANDINGMOBILE HOME INSTALLATIONFOR MINIMUM CLEARANCES SEE PAGE FLOOR PROTECTION SECTIONWARNING DO NOT INSTALL IN A SLEEPING ROOM TOOLS FOR INSTALLATIONPREPARING THE HEATER FOR INSTALLATION PREPARING THE ROOM HEATER LOCATION5.Next, remove the four 4 screws holding the heater to the stand. Position heater out of the way of the installation area Ceiling Exit Using Close Clearance Listed Chimney FINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRE ROOM AIR BLOWER OPERATION SOLUTION TROUBLESHOOTINGPROBLEM POSSIBLE CAUSEEPA COMPLIANCE STATUS MODEL WOOD STOVEREPLACEMENT PARTS FOR THE MODEL PRODUCTS COVERED WARRANTY TIME PERIODSPROCEDURE PRODUCTS NOT COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS