New Buck Corporation 85 installation instructions Final Check

Page 12
Manual background

14.Slide the unit back into the fireplace. Check to be sure that the trim panels (and brass) are properly positioned and lie flat against the front of the fireplace. If panels are out of posi- tion, slide the unit out and reset by loosening the mounting screws and repositioning in the slot. With bar, lift stove in front. Place insulation across front and the surface of hearth or bottom of fireplace, to make complete seal.

15.To check seal of panels, use candle flame and go around the entire area sealed by silicone and insulation. If flame leans toward inside of fireplace, add additional insulation. This en- sures an airtight seal.

Final Check

1.Recheck the specified clearances.

2.Remove all foreign material from the firebox area.

3.Open the primary air draft.

NOTE: Plug the power cord into a 115V AC outlet. Set switch to “Manual” and rheostat to “High” position to ensure motor operates properly. Route the cord to prevent damage to the cord insulation from heat and sharp objects. Keep the cord out of the way of traffic to prevent damage caused by tripping, etc.

10

Image 12
Contents Page Page TABLE OF CONTENTS Page INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS MODELREAD THIS FIRST IMPORTANT INSTRUCTIONSSECTION INTRODUCTIONSECTION MASONRY INSERT INSTALLATION MODELMINIMUM CLEARANCES K* FACTORS OF ALTERNATE MATERIALSMaterial Required ThicknessPOSSIBLE TOOLS NEEDED FOR INSTALLATION INSTALLATION PREPARATION FIREPLACEInstallation Procedure Positioning the Heater Mounting the Trim PanelsFinal Check Final Check 5.Check for smoke leaks around the doors SECTION PRE-FABINSERT INSTALLATION SECTION RESIDENTIAL FREE-STANDINGINSTALLATION PREPARING THE STOVE FOR INSTALLATIONMINIMUM CLEARANCE TO COMBUSTIBLE MATERIAL ALTERNATE FLOOR PROTECTORS MATERIAL K* FACTORS OF ALTERNATE MATERIALSMaterial Required ThicknessChimney DETERMINING THE CHIMNEY LOCATIONB.Wall Exit Into Metal Tee-Box C. Wall Exit Into Masonry Using Single Wall Pipe D. Ceiling Exit-CloseClearance ALCOVE INSTALLATION CLEARANCES FINAL CHECK CLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLES FREE-STANDINGCLEARANCES FOR MODEL MODEL 85 INSTALLATION OF CLOSE CLEARANCE SHIELDS OptionalFREE-STANDINGMOBILE HOME INSTALLATION FOR MINIMUM CLEARANCES SEE PAGE FLOOR PROTECTIONCHIMNEY SECTIONTOOLS FOR INSTALLATION PREPARING THE HEATER FOR INSTALLATIONWARNING DO NOT INSTALL IN A SLEEPING ROOM PREPARING THE ROOM HEATER LOCATION5.Next, remove the four 4 screws holding the heater to the stand. Position heater out of the way of the installation area Ceiling Exit Using Close Clearance Listed Chimney FINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRE ROOM AIR BLOWER OPERATION TROUBLESHOOTING PROBLEMSOLUTION POSSIBLE CAUSEEPA COMPLIANCE STATUS MODEL WOOD STOVEREPLACEMENT PARTS FOR THE MODEL WARRANTY TIME PERIODS PROCEDUREPRODUCTS COVERED PRODUCTS NOT COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS