New Buck Corporation 85 Ceiling Exit Using Close Clearance Listed Chimney

Page 29
Ceiling Exit (Using Close Clearance Listed Chimney)

RAIN CAP

24" min.

 

(610 mm)

36" TYP.

 

FLASHING

Manual background RADIATION SHIELD

20 FT. MAX.

OUTSIDE AIR DUCT THROUGH FLOOR WHEN

MOBLE HOME IS NOT UNDERPENNED

RAIN CAP

24" min.

 

(610 mm)

36" TYP.

Manual background FLASHING

RADIATION SHIELD

OUTSIDE AIR DUCT THROUGH UNDERPENNED

Ceiling Exit (Using Close Clearance Listed Chimney)

1.Suspend a plumb bob from the ceiling above the unit so that the weight is hanging in the center of the flue exit. ( A small weight on a string will serve as a plumb bob.) Mark the ceiling where the string is suspended to locate the center of the chimney hole.

2.After locating the center of the hole install the connector, flashing and rain cap using listed manual.

ceiling support box, chimney or chimney chimney only. Only use pipe listed in this

3. Add additional pipe until both of the following are met:

27

Image 29
Contents Page Page TABLE OF CONTENTS Page MAINTENANCE INSTRUCTIONS MODEL INSTALLATION, OPERATION, ANDREAD THIS FIRST IMPORTANT INSTRUCTIONSINTRODUCTION SECTIONMODEL SECTION MASONRY INSERT INSTALLATIONK* FACTORS OF ALTERNATE MATERIALS MINIMUM CLEARANCESMaterial Required ThicknessINSTALLATION PREPARATION FIREPLACE POSSIBLE TOOLS NEEDED FOR INSTALLATIONMounting the Trim Panels Installation Procedure Positioning the HeaterFinal Check Final Check 5.Check for smoke leaks around the doors SECTION PRE-FABINSERT INSTALLATION MINIMUM CLEARANCE TO COMBUSTIBLE MATERIAL SECTION RESIDENTIAL FREE-STANDINGINSTALLATIONPREPARING THE STOVE FOR INSTALLATION K* FACTORS OF ALTERNATE MATERIALS ALTERNATE FLOOR PROTECTORS MATERIALMaterial Required ThicknessDETERMINING THE CHIMNEY LOCATION ChimneyB.Wall Exit Into Metal Tee-Box C. Wall Exit Into Masonry Using Single Wall Pipe D. Ceiling Exit-CloseClearance ALCOVE INSTALLATION CLEARANCES FINAL CHECK MINIMUM CLEARANCES TO COMBUSTIBLES FREE-STANDING CLEARANCES FOR MODELCLEARANCES FOR MODEL Optional MODEL 85 INSTALLATION OF CLOSE CLEARANCE SHIELDSFOR MINIMUM CLEARANCES SEE PAGE FLOOR PROTECTION FREE-STANDINGMOBILE HOME INSTALLATIONCHIMNEY SECTIONPREPARING THE HEATER FOR INSTALLATION TOOLS FOR INSTALLATIONWARNING DO NOT INSTALL IN A SLEEPING ROOM PREPARING THE ROOM HEATER LOCATION5.Next, remove the four 4 screws holding the heater to the stand. Position heater out of the way of the installation area Ceiling Exit Using Close Clearance Listed Chimney FINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRE ROOM AIR BLOWER OPERATION PROBLEM TROUBLESHOOTINGSOLUTION POSSIBLE CAUSEMODEL WOOD STOVE EPA COMPLIANCE STATUSREPLACEMENT PARTS FOR THE MODEL PROCEDURE WARRANTY TIME PERIODSPRODUCTS COVERED PRODUCTS NOT COVEREDOTHER RIGHTS CONDITIONS AND EXCLUSIONS