New Buck Corporation 85 installation instructions C. Wall Exit Into Masonry Using Single Wall Pipe

Page 19
C. Wall Exit Into Masonry (Using Single Wall Pipe)

maintaining clearances to the ceiling as noted in Figure 6. This will give you the center of the hole for the chimney penetration.

4.After locating the center of the penetration, install the tee box and chimney as per the chimney manufacturer's specifications.

5.Connect the chimney collar to the tee-box using #24 ga. minimum blued or black steel connector pipe. (DO NOT USE GALVANIZED PIPE.) Connect each section so the crimped end faces downward, and secure each section to each other using three (3) sheet metal screws or rivets.

C. Wall Exit Into Masonry (Using Single Wall Pipe)

1.Before connecting these units to a masonry chimney, determine that the masonry fireplace wall pass-through connector thimble meets the NFPA-211Code and local building codes and is a minimum of 18" from the ceiling. If the connector thimble does not meet these codes, the pass-through connector must be modified. (See Figure 7.)

Figure 7

Connectors may pass through walls or partitions constructed of combustible material if the connector is:

(a)Either listed for wall pass-through or is routed through a device listed for wall pass- through and is installed in accordance with the conditions of the listing.

(b)Selected or fabricated in accordance with the conditions and clearances as stated in the NFPA-211Code. Any unexposed metal that is used as part of a wall pass-through system and is exposed to flue gases shall be constructed of stainless steel or other equivalent material that will resist corrosion, softening, or cracking from flue gases at temperatures up to 1800o F.

17

Image 19
Contents Page Page TABLE OF CONTENTS Page IMPORTANT INSTRUCTIONS INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL READ THIS FIRSTINTRODUCTION SECTIONMODEL SECTION MASONRY INSERT INSTALLATIONRequired Thickness MINIMUM CLEARANCESK* FACTORS OF ALTERNATE MATERIALS MaterialINSTALLATION PREPARATION FIREPLACE POSSIBLE TOOLS NEEDED FOR INSTALLATIONMounting the Trim Panels Installation Procedure Positioning the HeaterFinal Check Final Check 5.Check for smoke leaks around the doors SECTION PRE-FABINSERT INSTALLATION PREPARING THE STOVE FOR INSTALLATION SECTION RESIDENTIAL FREE-STANDINGINSTALLATIONMINIMUM CLEARANCE TO COMBUSTIBLE MATERIAL Required Thickness ALTERNATE FLOOR PROTECTORS MATERIALK* FACTORS OF ALTERNATE MATERIALS MaterialDETERMINING THE CHIMNEY LOCATION ChimneyB.Wall Exit Into Metal Tee-Box C. Wall Exit Into Masonry Using Single Wall Pipe D. Ceiling Exit-CloseClearance ALCOVE INSTALLATION CLEARANCES FINAL CHECK MINIMUM CLEARANCES TO COMBUSTIBLES FREE-STANDING CLEARANCES FOR MODELCLEARANCES FOR MODEL Optional MODEL 85 INSTALLATION OF CLOSE CLEARANCE SHIELDSSECTION FREE-STANDINGMOBILE HOME INSTALLATIONFOR MINIMUM CLEARANCES SEE PAGE FLOOR PROTECTION CHIMNEYPREPARING THE ROOM HEATER LOCATION TOOLS FOR INSTALLATIONPREPARING THE HEATER FOR INSTALLATION WARNING DO NOT INSTALL IN A SLEEPING ROOM5.Next, remove the four 4 screws holding the heater to the stand. Position heater out of the way of the installation area Ceiling Exit Using Close Clearance Listed Chimney FINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRE ROOM AIR BLOWER OPERATION POSSIBLE CAUSE TROUBLESHOOTINGPROBLEM SOLUTIONMODEL WOOD STOVE EPA COMPLIANCE STATUSREPLACEMENT PARTS FOR THE MODEL PRODUCTS NOT COVERED WARRANTY TIME PERIODSPROCEDURE PRODUCTS COVEREDOTHER RIGHTS CONDITIONS AND EXCLUSIONS