New Buck Corporation 85 installation instructions Replacement Parts For The Model

Page 37

REPLACEMENT PARTS

FOR THE MODEL 85

1.

Air Control Bar

MF 882040

2.

Door Handle Assembly

PA 910096

3.

Door Latch

PC 910098

4. Door Handle Washer

PO 91WASH

5.

Front door bushing

PO 910102

6. Door Gold

PC 212400G

7.

Door Black

PC 212400

8.

Carlingl Fan Auto/Man Switch

PE RC211RB

9.

Thermostat 110 disc

PE 400132

10.

Power Cord

PE 400240

11.

Strain Relief

PE 400320

12.

Motor

PE 910714

13.

Rheostat

PE BC204

14.

Rheostat knob

PE BC204A

15. Glass

PG 2124GL

16.

No Parts

 

17. Glass clip

PH 103212HWSPS5

18.

Spring Handle

PO 100150

19.

“U” Drive Screw 5/16" x 1/2"

PO 516U

20.

Top Firebox Blanket

PO 810013

21.

Secondary Air Tube

PO 810050

22.

Bottom Firebox Blanket

PO 810054

23.

Primary Air Block

MF 852038

24.

Side Brass Overlay

PO 810104G

25.

Top Baffle Plate

PO 810116

26.

Hearth Brass

PO

27.

1" x 1" x 1/8" thick magnet

PO DM841

28.

Firebrick

PR 900050

35

Image 37
Contents Page Page TABLE OF CONTENTS Page MAINTENANCE INSTRUCTIONS MODEL INSTALLATION, OPERATION, ANDREAD THIS FIRST IMPORTANT INSTRUCTIONSINTRODUCTION SECTIONMODEL SECTION MASONRY INSERT INSTALLATIONK* FACTORS OF ALTERNATE MATERIALS MINIMUM CLEARANCESMaterial Required ThicknessINSTALLATION PREPARATION FIREPLACE POSSIBLE TOOLS NEEDED FOR INSTALLATIONMounting the Trim Panels Installation Procedure Positioning the HeaterFinal Check Final Check 5.Check for smoke leaks around the doors SECTION PRE-FABINSERT INSTALLATION PREPARING THE STOVE FOR INSTALLATION SECTION RESIDENTIAL FREE-STANDINGINSTALLATIONMINIMUM CLEARANCE TO COMBUSTIBLE MATERIAL K* FACTORS OF ALTERNATE MATERIALS ALTERNATE FLOOR PROTECTORS MATERIALMaterial Required ThicknessDETERMINING THE CHIMNEY LOCATION ChimneyB.Wall Exit Into Metal Tee-Box C. Wall Exit Into Masonry Using Single Wall Pipe D. Ceiling Exit-CloseClearance ALCOVE INSTALLATION CLEARANCES FINAL CHECK MINIMUM CLEARANCES TO COMBUSTIBLES FREE-STANDING CLEARANCES FOR MODELCLEARANCES FOR MODEL Optional MODEL 85 INSTALLATION OF CLOSE CLEARANCE SHIELDSFOR MINIMUM CLEARANCES SEE PAGE FLOOR PROTECTION FREE-STANDINGMOBILE HOME INSTALLATIONCHIMNEY SECTIONPREPARING THE HEATER FOR INSTALLATION TOOLS FOR INSTALLATIONWARNING DO NOT INSTALL IN A SLEEPING ROOM PREPARING THE ROOM HEATER LOCATION5.Next, remove the four 4 screws holding the heater to the stand. Position heater out of the way of the installation area Ceiling Exit Using Close Clearance Listed Chimney FINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRE ROOM AIR BLOWER OPERATION PROBLEM TROUBLESHOOTINGSOLUTION POSSIBLE CAUSEMODEL WOOD STOVE EPA COMPLIANCE STATUSREPLACEMENT PARTS FOR THE MODEL PROCEDURE WARRANTY TIME PERIODSPRODUCTS COVERED PRODUCTS NOT COVEREDOTHER RIGHTS CONDITIONS AND EXCLUSIONS