New Buck Corporation 85 Installation, Operation, And, Maintenance Instructions Model

Page 5
INSTALLATION, OPERATION, AND

INSTALLATION, OPERATION, AND

MAINTENANCE INSTRUCTIONS

MODEL 85

READ THIS FIRST

IMPORTANT INSTRUCTIONS

The New Buck Corporation non-catalytic system has been tested by Intertek Testing Services, Warnock Hersey to ANSI/UL Standards 1482.

Install and operate your units according to instructions provided in this manual. Local building codes may apply; therefore, contact your local building inspector or fire marshal for necessary installation requirements and permits which may go beyond these instruc- tions.

If appliance is installed in mobile homes: “DO NOT INSTALL IN SLEEPING ROOMS.”

Examine the masonry fireplace and chimney prior to installation of the fireplace accessory to determine that the construction meets the minimum fireplace construction requirements illustrated in the instructions, that it is free from cracks, loose mortar, creosote deposits and other blockage, or other signs of deterioration.

A factory-built pre-fabricated chimney may be used for your units when installed in compliance with the manufacturer's specification and uniform building code.

3

Image 5
Contents Page Page TABLE OF CONTENTS Page MAINTENANCE INSTRUCTIONS MODEL INSTALLATION, OPERATION, ANDREAD THIS FIRST IMPORTANT INSTRUCTIONSINTRODUCTION SECTIONMODEL SECTION MASONRY INSERT INSTALLATIONK* FACTORS OF ALTERNATE MATERIALS MINIMUM CLEARANCESMaterial Required ThicknessINSTALLATION PREPARATION FIREPLACE POSSIBLE TOOLS NEEDED FOR INSTALLATIONMounting the Trim Panels Installation Procedure Positioning the HeaterFinal Check Final Check 5.Check for smoke leaks around the doors SECTION PRE-FABINSERT INSTALLATION MINIMUM CLEARANCE TO COMBUSTIBLE MATERIAL SECTION RESIDENTIAL FREE-STANDINGINSTALLATIONPREPARING THE STOVE FOR INSTALLATION K* FACTORS OF ALTERNATE MATERIALS ALTERNATE FLOOR PROTECTORS MATERIALMaterial Required ThicknessDETERMINING THE CHIMNEY LOCATION ChimneyB.Wall Exit Into Metal Tee-Box C. Wall Exit Into Masonry Using Single Wall Pipe D. Ceiling Exit-CloseClearance ALCOVE INSTALLATION CLEARANCES FINAL CHECK MINIMUM CLEARANCES TO COMBUSTIBLES FREE-STANDING CLEARANCES FOR MODELCLEARANCES FOR MODEL Optional MODEL 85 INSTALLATION OF CLOSE CLEARANCE SHIELDSFOR MINIMUM CLEARANCES SEE PAGE FLOOR PROTECTION FREE-STANDINGMOBILE HOME INSTALLATIONCHIMNEY SECTIONPREPARING THE HEATER FOR INSTALLATION TOOLS FOR INSTALLATIONWARNING DO NOT INSTALL IN A SLEEPING ROOM PREPARING THE ROOM HEATER LOCATION5.Next, remove the four 4 screws holding the heater to the stand. Position heater out of the way of the installation area Ceiling Exit Using Close Clearance Listed Chimney FINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRE ROOM AIR BLOWER OPERATION PROBLEM TROUBLESHOOTINGSOLUTION POSSIBLE CAUSEMODEL WOOD STOVE EPA COMPLIANCE STATUSREPLACEMENT PARTS FOR THE MODEL PROCEDURE WARRANTY TIME PERIODSPRODUCTS COVERED PRODUCTS NOT COVEREDOTHER RIGHTS CONDITIONS AND EXCLUSIONS