New Buck Corporation 85 Clearances For Model, Minimum Clearances To Combustibles Free-Standing

Page 23
CLEARANCES FOR MODEL 85

CLEARANCES FOR MODEL 85

MINIMUM CLEARANCES TO COMBUSTIBLES

FREE-STANDING

BACK WALL

 

 

 

8"

 

 

B

C

F

 

 

 

 

WALL

8"

 

 

 

SIDE

 

 

 

 

 

 

 

 

HEARTH PAD

16"

 

 

 

AB

 

 

 

DCD C

 

 

 

 

Figure 9

MODEL

A

B

C

D

MODEL 85

24"

24"

25"

16"

NOTE: All clearances are to combustibles without low clearance shields and using single wall pipe and minimum floor protector. Clearances above may be reduced. Follow NFPA-211codes if available or follow instructions on next page.

* Floor Protector at rear needed for thru-the-wall exit only.

21

Image 23
Contents Page Page TABLE OF CONTENTS Page IMPORTANT INSTRUCTIONS INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL READ THIS FIRSTINTRODUCTION SECTIONMODEL SECTION MASONRY INSERT INSTALLATIONRequired Thickness MINIMUM CLEARANCESK* FACTORS OF ALTERNATE MATERIALS MaterialINSTALLATION PREPARATION FIREPLACE POSSIBLE TOOLS NEEDED FOR INSTALLATIONMounting the Trim Panels Installation Procedure Positioning the HeaterFinal Check Final Check 5.Check for smoke leaks around the doors SECTION PRE-FABINSERT INSTALLATION MINIMUM CLEARANCE TO COMBUSTIBLE MATERIAL SECTION RESIDENTIAL FREE-STANDINGINSTALLATIONPREPARING THE STOVE FOR INSTALLATION Required Thickness ALTERNATE FLOOR PROTECTORS MATERIALK* FACTORS OF ALTERNATE MATERIALS MaterialDETERMINING THE CHIMNEY LOCATION ChimneyB.Wall Exit Into Metal Tee-Box C. Wall Exit Into Masonry Using Single Wall Pipe D. Ceiling Exit-CloseClearance ALCOVE INSTALLATION CLEARANCES FINAL CHECK MINIMUM CLEARANCES TO COMBUSTIBLES FREE-STANDING CLEARANCES FOR MODELCLEARANCES FOR MODEL Optional MODEL 85 INSTALLATION OF CLOSE CLEARANCE SHIELDSSECTION FREE-STANDINGMOBILE HOME INSTALLATIONFOR MINIMUM CLEARANCES SEE PAGE FLOOR PROTECTION CHIMNEYPREPARING THE ROOM HEATER LOCATION TOOLS FOR INSTALLATIONPREPARING THE HEATER FOR INSTALLATION WARNING DO NOT INSTALL IN A SLEEPING ROOM5.Next, remove the four 4 screws holding the heater to the stand. Position heater out of the way of the installation area Ceiling Exit Using Close Clearance Listed Chimney FINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRE ROOM AIR BLOWER OPERATION POSSIBLE CAUSE TROUBLESHOOTINGPROBLEM SOLUTIONMODEL WOOD STOVE EPA COMPLIANCE STATUSREPLACEMENT PARTS FOR THE MODEL PRODUCTS NOT COVERED WARRANTY TIME PERIODSPROCEDURE PRODUCTS COVEREDOTHER RIGHTS CONDITIONS AND EXCLUSIONS