New Buck Corporation 85 installation instructions Section Masonry Insert Installation, Model

Page 7
SECTION II

SECTION II

MASONRY INSERT INSTALLATION

The Model 81 may be installed using an all masonry fireplace built in accordance with the Uniform Building Code and National Fire Protection Association (NFPA). The first step in this type of installation is to determine the acceptability of the fireplace and chimney for use with a woodstove. Both the construction and condition of the fireplace are important consid- erations when installing a woodstove. It is not necessary to direct connect this unit unless installed in improper drawing fireplace or oversized flue. The chimney should extend at least 3' above the roof and at least 2' above any point of the roof within 10'.

E

F

 

D

C

B

 

A

Figure 1

MODEL 85

A. Unit to adjust to Side Wall

12"

B. Front Floor Protector

16"

C. Side Floor Protector

8"

D. Side Wood Trim

7"

E. Top Wood Trim

10"

F. Mantel or Brackets

21"

5

Image 7
Contents Page Page TABLE OF CONTENTS Page IMPORTANT INSTRUCTIONS INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL READ THIS FIRSTINTRODUCTION SECTIONMODEL SECTION MASONRY INSERT INSTALLATIONRequired Thickness MINIMUM CLEARANCESK* FACTORS OF ALTERNATE MATERIALS MaterialINSTALLATION PREPARATION FIREPLACE POSSIBLE TOOLS NEEDED FOR INSTALLATIONMounting the Trim Panels Installation Procedure Positioning the HeaterFinal Check Final Check 5.Check for smoke leaks around the doors SECTION PRE-FABINSERT INSTALLATION PREPARING THE STOVE FOR INSTALLATION SECTION RESIDENTIAL FREE-STANDINGINSTALLATIONMINIMUM CLEARANCE TO COMBUSTIBLE MATERIAL Required Thickness ALTERNATE FLOOR PROTECTORS MATERIALK* FACTORS OF ALTERNATE MATERIALS MaterialDETERMINING THE CHIMNEY LOCATION ChimneyB.Wall Exit Into Metal Tee-Box C. Wall Exit Into Masonry Using Single Wall Pipe D. Ceiling Exit-CloseClearance ALCOVE INSTALLATION CLEARANCES FINAL CHECK MINIMUM CLEARANCES TO COMBUSTIBLES FREE-STANDING CLEARANCES FOR MODELCLEARANCES FOR MODEL Optional MODEL 85 INSTALLATION OF CLOSE CLEARANCE SHIELDSSECTION FREE-STANDINGMOBILE HOME INSTALLATIONFOR MINIMUM CLEARANCES SEE PAGE FLOOR PROTECTION CHIMNEYPREPARING THE ROOM HEATER LOCATION TOOLS FOR INSTALLATIONPREPARING THE HEATER FOR INSTALLATION WARNING DO NOT INSTALL IN A SLEEPING ROOM5.Next, remove the four 4 screws holding the heater to the stand. Position heater out of the way of the installation area Ceiling Exit Using Close Clearance Listed Chimney FINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRE ROOM AIR BLOWER OPERATION POSSIBLE CAUSE TROUBLESHOOTINGPROBLEM SOLUTIONMODEL WOOD STOVE EPA COMPLIANCE STATUSREPLACEMENT PARTS FOR THE MODEL PRODUCTS NOT COVERED WARRANTY TIME PERIODSPROCEDURE PRODUCTS COVEREDOTHER RIGHTS CONDITIONS AND EXCLUSIONS