New Buck Corporation 85 installation instructions Building A Fire

Page 33

BUILDING A FIRE

1.Open the door.

2.Open the primary air controls located on the right and left sides of the stove under the hearth. To open, push all the way in. To close, pull all the way out. Adjustments to airflow may be made by positioning the handle anywhere in between.

3.Twist two pieces of non-colored newspaper into a roll and place them on the floor of the firebox.

4.These models are not designed for the use of grates, andirons or other methods of supporting the fuel.

5.Lay several pieces of dry kindling on top of the newspaper.

6.Place three or four small pieces of firewood, 2-3" in diameter, on top of the kindling.

7.Light the newspaper in the front, close and latch the door. Don't leave the fire unattended at this point. The draft system of the heater should start quickly. It may be necessary to preheat the chimney to get the draft started. To do this, open the door and add newspaper to the top rear of the wood. Light or let this paper ignite and allow to burn while holding the door slightly cracked. Once the draft has started, close and lock the door. You are over heating the unit if the chimney and/or connector glows red.

8.After embers and a coal bed have been established, load the heater with wood.

NOTE: THE FUELING AND ASH REMOVAL DOORS MUST REMAIN CLOSED DURING OPERATION.

Your unit does not have a damper. You must use the primary air levers for your control of the fire. To open, push the levers in, and to close, pull the levers out.

31

Image 33
Contents Page Page TABLE OF CONTENTS Page MAINTENANCE INSTRUCTIONS MODEL INSTALLATION, OPERATION, ANDREAD THIS FIRST IMPORTANT INSTRUCTIONSINTRODUCTION SECTIONMODEL SECTION MASONRY INSERT INSTALLATIONK* FACTORS OF ALTERNATE MATERIALS MINIMUM CLEARANCESMaterial Required ThicknessINSTALLATION PREPARATION FIREPLACE POSSIBLE TOOLS NEEDED FOR INSTALLATIONMounting the Trim Panels Installation Procedure Positioning the HeaterFinal Check Final Check 5.Check for smoke leaks around the doors SECTION PRE-FABINSERT INSTALLATION SECTION RESIDENTIAL FREE-STANDINGINSTALLATION PREPARING THE STOVE FOR INSTALLATIONMINIMUM CLEARANCE TO COMBUSTIBLE MATERIAL K* FACTORS OF ALTERNATE MATERIALS ALTERNATE FLOOR PROTECTORS MATERIALMaterial Required ThicknessDETERMINING THE CHIMNEY LOCATION ChimneyB.Wall Exit Into Metal Tee-Box C. Wall Exit Into Masonry Using Single Wall Pipe D. Ceiling Exit-CloseClearance ALCOVE INSTALLATION CLEARANCES FINAL CHECK MINIMUM CLEARANCES TO COMBUSTIBLES FREE-STANDING CLEARANCES FOR MODELCLEARANCES FOR MODEL Optional MODEL 85 INSTALLATION OF CLOSE CLEARANCE SHIELDSFOR MINIMUM CLEARANCES SEE PAGE FLOOR PROTECTION FREE-STANDINGMOBILE HOME INSTALLATIONCHIMNEY SECTIONPREPARING THE HEATER FOR INSTALLATION TOOLS FOR INSTALLATIONWARNING DO NOT INSTALL IN A SLEEPING ROOM PREPARING THE ROOM HEATER LOCATION5.Next, remove the four 4 screws holding the heater to the stand. Position heater out of the way of the installation area Ceiling Exit Using Close Clearance Listed Chimney FINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRE ROOM AIR BLOWER OPERATION PROBLEM TROUBLESHOOTINGSOLUTION POSSIBLE CAUSEMODEL WOOD STOVE EPA COMPLIANCE STATUSREPLACEMENT PARTS FOR THE MODEL PROCEDURE WARRANTY TIME PERIODSPRODUCTS COVERED PRODUCTS NOT COVEREDOTHER RIGHTS CONDITIONS AND EXCLUSIONS