Heat & Glo LifeStyle XLR-PB-AU, XLR-N-AU manual Vent Information and Diagrams

Page 24

7 Vent Information and Diagrams

A. Approved Pipe

This appliance is approved for use with Hearth & Home Technologies SLP venting systems. Refer to Section 17.B for vent component information.

DO NOT mix pipe, fittings or joining methods from differ- ent manufacturers.

The pipe is tested to be run inside an enclosed wall. There is no requirement for inspection openings at each joint within the wall.

WARNING! Risk of Fire or Asphyxiation. This appli- ance requires a separate vent. DO NOT vent to a pipe serving a separate solid fuel burning appliance.

NOTICE: The SLP-HRC-SS and SLP-HRC-ZC-SS ter- mination caps are NOT approved for use with propane or butane fuel.

B. Vent Table Key

The abbreviations listed in this vent table key are used in the vent diagrams.

Symbol

Description

 

 

V1

First section (closest to appliance) of vertical length

 

 

V2

Second section of vertical length

 

 

H1

First section (closest to appliance) of horizontal length

 

 

H2

Subsequent sections of horizontal length

 

 

C. Use of Elbows

Diagonal runs have both vertical and horizontal vent as- pects when calculating the effects. Use the rise for the vertical aspect and the run for the horizontal aspect (see Figure 7.1).

Two 45º elbows may be used in place of one 90º elbow. On 45º runs, 1 ft. (305 mm)one foot of diagonal is equal to 8-1/2 in. (216 mm) horizontal run and 8-1/2 in. (216 mm) vertical run. A length of straight pipe is allowed between two 45º elbows (see Figure 7.1).

D. Measuring Standards

Vertical and horizontal measurements listed in the vent diagrams were made using the following standards.

Pipe measurements are shown using the effective length of pipe (see Figure 7.2).

Measurements are made from the appliance outer wrap, not from the standoffs.

Horizontal terminations are measured to the outside mounting surface (flange of termination cap).

Vertical terminations are measured to bottom of termination cap.

Horizontal pipe installed level with no rise.

 

 

 

 

Effective Height/Length

 

 

 

 

Pipe

in.

mm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SLP4

4

102

 

 

 

 

SLP6

6

152

Effective

SLP12

12

305

Height/

SLP24

24

610

Length

SLP36

35

914

 

 

 

 

 

 

 

 

SLP48

48

1219

 

 

 

 

SLP6A

2 - 6

51 - 152

 

 

 

 

 

 

 

 

SLP12A

2 - 12

51 - 305

Figure 7.2 SLP Pipe Effective Length

E. Vent Diagrams

General Rules:

When penetrating a combustible wall, a wall shield firestop must be installed.

When penetrating a combustible ceiling, a ceiling firestop must be installed.

Horizontal runs of vent do not require vertical rise; horizontal runs may be level.

Vertical

 

mm)

mm)

12

 

in.(216

 

.

 

 

in

 

 

(305

 

1/2

8-1/2 in.

8-

 

(216 mm)

 

Horizontal

 

Figure 7.1

 

 

 

24

Heat & Glo • XLR-N-AU, XLR-PB-AU2198-906 Rev. M • 5/12

Image 24
Contents Ref No GSCS20139 AS4558 SAI GlobalWhat to do if you smell gas Models XLR-N-AU, XLR-PB-AU Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingComponent Access FinishingAustralian Warranty Information Limited Lifetime WarrantyOther Rights This warranty is void if PerthListing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesClear Space Decorative Doors and FrontsNine Hour Safety Shutdown Feature Control Module OperationLighting Instructions IPI Final inspection byAGE 110/120 VAC or 220/240 Frequently Asked Questions Initial Break-in ProcedureAfter Fireplace is Lit Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Decorative DoorsMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionFirebox Control Compartment and Firebox TopGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections Mantels Combustible/Non-CombustibleMantel Leg Combustible/Non-Combustible Front Side Finishing DetailTermination Locations Vent Termination Minimum ClearancesMIN. Clearance in. mm Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Minimum MaximumTop Vent Horizontal Termination Venting with 2 elbowsTop Vent Vertical Termination No Elbows V1 Max= 44 ft .4 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 4 elbows Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentInstalling the Optional Heat-Zone-240V Kit Securing and Leveling the ApplianceInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 17 Venting through the WallGas Information Gas ConnectionAccess Through the Valve Assembly Valve Pressure TapsWiring Requirements IntelliFire Plus Ignition System WiringOptional Accessories Requirements Optional Remote Control Receiver LocationElectrical Service and Repair Junction Cord Information Junction Cord InformationNon-Combustible Materials Specification FinishingFraming and Finishing Instructions Finishing InstructionsFinishing Details Sealing Joints Required Fireplace Opening HeightTOP View Unlimited Facing Material 11 Overlap Fit Method Tonic or Martini Decorative Front13 Inside Fit Method Tonic Decorative Front Only Dimensions of Tonic Decorative Front Decorative FrontsAppliance Setup Air Shutter Setting Media OptionsVerify Performance of Appliance Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Ues to spark, and main Frequently Asked Questions/Troubleshooting Symptom Possible Cause Corrective ActionComponent Access Access Through the Valve Assembly Gas Valve Replacement Pilot Assembly ReplacementAppliance Dimension Diagram Reference MaterialsMaintenance Tasks Inspect Maintenance TasksVent Components Diagrams 165 mm 152 mmSLP-45 45 Elbow 168 mm 10-1/4 SLP90- 90 ElbowSnorkel Support Box-Black Ceiling Firestop Wall Thimble-Black Adapter15-1/2 394 mm SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Service Parts XLR-N-AU, XLR-PB-AU#14 Valve Assembly Service Parts List XLR-N-AU, XLR-PB-AUContact Information