Heat & Glo LifeStyle XLR-PB-AU, XLR-N-AU manual Gas Information, Gas Connection

Page 42

11 Gas Information

A. Gas Pressure Requirements

Pressure requirements for XLR-AU fireplaces are shown in Table 11.1 below.

Two taps are provided on the right hand side of the gas control for a test gauge connection to measure the inlet and outlet pressures.

The fireplace and its individual shut-off valve must be dis- connected from the gas supply piping system during any pressure testing of the system at test pressures in excess of 6 kPa.

If the fireplace must be isolated from the gas supply pip- ing system by closing an individual shut-off valve, it must be of the handle-less type.

WARNING

Fire Risk

Explosion Risk

High pressure will damage valve.

Disconnect gas supply piping BEFORE pressure testing gas line at test pressures above 6 kPa.

Close the manual shutoff valve BEFORE pressure testing gas line at test pressures equal to or less than 6 kPa.

ON/OFF/REMOTE

SWITCH

GAS VALVE

CONTROL

 

MODULE

DC ADAPTER

Figure 11.1. Valve Components

B. Gas Connection

Note: Have the gas supply line installed in accordance with local building codes by a qualified installer approved and/or licensed as required by the locality.

Note: Before the first firing of the appliance, the gas supply line should be purged of any trapped air.

Note: Consult local building regulations to properly size the gas supply line leading to the (Rp 1/2 in.) hook-up at the unit.

Incoming gas line should be piped into the valve compart- ment and connected to the ISO 7-Rp 1/2 (BSP Rp 1/2) threaded gas inlet connection on the manual shutoff valve.

IMPORTANT NOTICE: (Items 1, 2 and 3 applies to

 

ALL Heat & Glo gas appliances)

 

1.1/2 in. GAS LINE: Run through cavity 70 mm above finished hearth level, NOT RIGID, NOT CLIPPED, with minimum 500 mm into cavity and 120 mm back from plaster face.

2.PVC (COMPOSITE) GASLINE must terminate minimum 500 mm short of gas heater. Copper pipe MUST be the final connection to the gas heater.

3.ISOLATING SWITCH: Location within 1 metre of fireplace, subject to mantelpiece etc. Check to ensure it remains clear of any mantelpiece instal- lation.

Leak test all gas line points and the gas control valve prior to and after starting the gas appliance.

 

Natural Gas

Propane

Butane

 

 

 

 

 

Gas Inlet Pressure

1.13

- 3.40 kPa

2.75 - 3.40 kPa

2.75 - 3.40kPa

Outlet (Manifold) Gas Pressure

.80

- .95 kPa

2.36 - 2.61 kPa

2.36 - 2.61 kPa

Gas Rate

.405 m3/

h

.134 m3/

h

.111 m3/

h

Maximum Gas Consumption

26 MJ/h

26.0 MJ/h

22 MJ/h

Burner Injector

DMS 42 (2.350 mm)

DMS .057 (1.450 mm)

DMS 55 (1.325)

Pilot Injector

 

51

 

30

 

30

 

Columns highlighted in gray = The gas control valve supplied with this product is approved for a maximum inlet pressure of 3.40 kPa. For pressures over 3.40 kPa, an in line pressure regulator must be installed upstream from the gas control valve.

Table 11.1

42

Heat & Glo • XLR-N-AU, XLR-PB-AU2198-906 Rev. M • 5/12

Image 42
Contents Ref No GSCS20139 AS4558 SAI GlobalWhat to do if you smell gas Models XLR-N-AU, XLR-PB-AU Congratulations Homeowner Reference InformationTable of Contents User GuideComponent Access Appliance SetupTroubleshooting FinishingAustralian Warranty Information Limited Lifetime WarrantyOther Rights This warranty is void if PerthListing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Decorative Doors and FrontsNine Hour Safety Shutdown Feature Control Module OperationLighting Instructions IPI Final inspection byAGE 110/120 VAC or 220/240 Frequently Asked Questions Initial Break-in ProcedureAfter Fireplace is Lit Glass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Decorative DoorsFirebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection Control Compartment and Firebox TopGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel Leg Combustible/Non-Combustible Mantel and Wall ProjectionsMantels Combustible/Non-Combustible Front Side Finishing DetailTermination Locations Vent Termination Minimum ClearancesMIN. Clearance in. mm Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Minimum MaximumTop Vent Horizontal Termination Venting with 2 elbowsTop Vent Vertical Termination No Elbows V1 Max= 44 ft .4 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 4 elbows Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentInstalling the Optional Heat-Zone-240V Kit Securing and Leveling the ApplianceInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 17 Venting through the WallGas Information Gas ConnectionAccess Through the Valve Assembly Valve Pressure TapsOptional Accessories Requirements Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Remote Control Receiver LocationElectrical Service and Repair Junction Cord Information Junction Cord InformationFraming and Finishing Instructions Non-Combustible Materials SpecificationFinishing Finishing InstructionsFinishing Details Sealing Joints Required Fireplace Opening HeightTOP View Unlimited Facing Material 11 Overlap Fit Method Tonic or Martini Decorative Front13 Inside Fit Method Tonic Decorative Front Only Dimensions of Tonic Decorative Front Decorative FrontsAppliance Setup Air Shutter Setting Media OptionsVerify Performance of Appliance Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Ues to spark, and main Frequently Asked Questions/Troubleshooting Symptom Possible Cause Corrective ActionComponent Access Access Through the Valve Assembly Gas Valve Replacement Pilot Assembly ReplacementAppliance Dimension Diagram Reference MaterialsMaintenance Tasks Inspect Maintenance TasksVent Components Diagrams SLP-45 45 Elbow 168 mm 10-1/4 165 mm152 mm SLP90- 90 ElbowSnorkel Support Box-Black Ceiling Firestop Wall Thimble-Black Adapter15-1/2 394 mm SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Service Parts XLR-N-AU, XLR-PB-AU#14 Valve Assembly Service Parts List XLR-N-AU, XLR-PB-AUContact Information