Heat & Glo LifeStyle XLR-N-AU Mantel and Wall Projections, Mantels Combustible/Non-Combustible

Page 21

D. Mantel and Wall Projections

WARNING! Risk of Fire! Comply with all minimum clear- ances to combustibles as specified. Framing or finishing material closer than the minimums listed must be construct- ed entirely of noncombustible materials (i.e., steel studs, concrete board, etc).

Mantels (Combustible/Non-Combustible)

3/8 in. (10 mm)

 

Thick Wall

 

Sheathing

11-3/4 in. (300 mm)

 

MAX.

MEASUREMENT

14 in. FROM TOP OF

(360 mm) FIREPLACE MIN. OPENING

Figure 5.3 Clearances To Combustible Mantels Or Other Combustibles Above Appliance

Note: For non-combustible fireplace finish material (marble, stone, etc) specifications refer to Section 13.C.

Mantel Leg (Combustible/Non-Combustible)

TOP VIEW

3 in.

(80 mm) UNLIMITED MIN.

7 in.

Figure 5.4 Non-Combustible Mantel Leg or Wall Projections (Acceptable on both sides of opening)

Front Side Finishing Detail

 

1-1/4 in. (30 mm)

 

FRAMING

 

1-1/2 in. (37 mm)

 

3/8 in. (10 mm) BUILDING MATERIAL

Figure 5.5

Front Side Finishing Detail

 

3-1/2 in. (89 mm)

3/8 in. (10 mm)

THICKWALL SHEATHING

NON-COMBUSTIBLE

BOARD SHIPPED

WITH APPLIANCE

1 in. (25 mm)

1 in. (25 mm)

AIR SPACE

Figure 5.6 Non-Combustible Zone

Note: AIR SPACE denoted in Figure 5.6 is defined by the nailing tabs and metal standoffs.

Heat & Glo • XLR-N-AU, XLR-PB-AU2198-906 Rev. M • 5/12

21

Image 21
Contents Ref No GSCS20139 AS4558 SAI GlobalWhat to do if you smell gas Models XLR-N-AU, XLR-PB-AU Homeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupComponent Access FinishingLimited Lifetime Warranty Australian Warranty InformationOther Rights Perth This warranty is void ifListing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyClear Space Decorative Doors and FrontsControl Module Operation Nine Hour Safety Shutdown FeatureLighting Instructions IPI Final inspection byAGE 110/120 VAC or 220/240 Frequently Asked Questions Initial Break-in ProcedureAfter Fireplace is Lit Maintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Decorative DoorsGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianFirebox Control Compartment and Firebox TopTypical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMantels Combustible/Non-Combustible Mantel and Wall ProjectionsMantel Leg Combustible/Non-Combustible Front Side Finishing DetailVent Termination Minimum Clearances Termination LocationsMIN. Clearance in. mm Vent Information and Diagrams Minimum Maximum Top Vent Horizontal Termination Venting with 1 elbowVenting with 2 elbows Top Vent Horizontal TerminationExhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 Max= 44 ft .4 mV1 Minimum Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 2 elbowsV1 Minimum H1 + H2 Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 3 elbowsTop Vent Vertical Termination Venting with 4 elbows Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe SLP Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Top Vent Appliance PreparationSecuring and Leveling the Appliance Installing the Optional Heat-Zone-240V KitAssemble Vent Sections Installing Vent Pipe SLP PipeSecure The Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination 17 Venting through the Wall Install Horizontal Termination CapGas Connection Gas InformationValve Pressure Taps Access Through the Valve AssemblyIntelliFire Plus Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Optional Remote Control Receiver LocationJunction Cord Information Electrical Service and Repair Junction Cord InformationFinishing Non-Combustible Materials SpecificationFraming and Finishing Instructions Finishing InstructionsFinishing Details Required Fireplace Opening Height Sealing JointsTOP View Unlimited 11 Overlap Fit Method Tonic or Martini Decorative Front Facing Material13 Inside Fit Method Tonic Decorative Front Only Decorative Fronts Dimensions of Tonic Decorative FrontAppliance Setup Air Shutter Setting Media OptionsVerify Performance of Appliance Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Ues to spark, and main Symptom Possible Cause Corrective Action Frequently Asked Questions/TroubleshootingComponent Access Access Through the Valve Assembly Pilot Assembly Replacement Gas Valve ReplacementReference Materials Appliance Dimension DiagramInspect Maintenance Tasks Maintenance TasksVent Components Diagrams 152 mm 165 mmSLP-45 45 Elbow 168 mm 10-1/4 SLP90- 90 ElbowSnorkel Support Box-Black Ceiling Firestop Wall Thimble-Black Adapter15-1/2 394 mm SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP XLR-N-AU, XLR-PB-AU Service Parts#14 Valve Assembly XLR-N-AU, XLR-PB-AU Service Parts ListContact Information