Heat & Glo LifeStyle XLR-N-AU, XLR-PB-AU manual Service Parts List, Xlr-N-Au, Xlr-Pb-Au

Page 69

D. Service Parts List

XLR-N-AU, XLR-PB-AU

IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement parts for your appliance please provide model number and serial number. All parts listed in this manual may be ordered from an authorized dealer.

ITEM

DESCRIPTION

COMMENTS

PART NUMBER

 

Cover Plate , Heat-Zone

Qty 2 req

2198-104

 

Elbow Heat Shield

 

2143-168

 

Exhaust Restrictor

 

530-299

 

Gasket Assembly

 

2113-080

 

Contains burner neck, shutter bracket, vent, seal cap, valve plate, and air passage gaskets

 

 

 

 

 

 

 

Glass Latch Assembly

Pkg of 2

33858/2

 

Glass Latch, Bottom

Qty 2 req

2143-119

 

Heat Shield, Inner

 

2198-130

 

Nailing Tabs

 

2198-131

 

Shoulder Bolts

Pkg of 25

319-835-25

 

Touch Up Paint

 

TUP-GBK-12

 

Wall Switch Kit

 

WSK-21-W

Conversion Kit N

Conversion Kit B

Conversion Kit P

Pilot Orifice N

Pilot Orifice B

Pilot Orifice P

Regulator N

Regulator P & B

PB2N-XLR-AU

P2B-XLR-AU

N2PB-XLR-AU

593-528

593-529

593-527

NGK-DXF-NP

LPK-DXF-NP

Heat & Glo • XLR-N-AU, XLR-PB-AU2198-906 Rev. M • 5/12

69

Image 69
Contents Ref No GSCS20139 AS4558 SAI GlobalWhat to do if you smell gas Models XLR-N-AU, XLR-PB-AU Homeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupComponent Access FinishingLimited Lifetime Warranty Australian Warranty InformationOther Rights Perth This warranty is void ifListing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyClear Space Decorative Doors and FrontsControl Module Operation Nine Hour Safety Shutdown FeatureLighting Instructions IPI Final inspection byAGE 110/120 VAC or 220/240 Frequently Asked Questions Initial Break-in ProcedureAfter Fireplace is Lit Maintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Decorative DoorsGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianFirebox Control Compartment and Firebox TopTypical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMantels Combustible/Non-Combustible Mantel and Wall ProjectionsMantel Leg Combustible/Non-Combustible Front Side Finishing DetailVent Termination Minimum Clearances Termination LocationsMIN. Clearance in. mm Vent Information and Diagrams Minimum Maximum Top Vent Horizontal Termination Venting with 1 elbowVenting with 2 elbows Top Vent Horizontal TerminationExhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 Max= 44 ft .4 mV1 Minimum Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 2 elbowsV1 Minimum H1 + H2 Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 3 elbowsTop Vent Vertical Termination Venting with 4 elbows Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe SLP Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Top Vent Appliance PreparationSecuring and Leveling the Appliance Installing the Optional Heat-Zone-240V KitAssemble Vent Sections Installing Vent Pipe SLP PipeSecure The Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination 17 Venting through the Wall Install Horizontal Termination CapGas Connection Gas InformationValve Pressure Taps Access Through the Valve AssemblyIntelliFire Plus Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Optional Remote Control Receiver LocationJunction Cord Information Electrical Service and Repair Junction Cord InformationFinishing Non-Combustible Materials SpecificationFraming and Finishing Instructions Finishing InstructionsFinishing Details Required Fireplace Opening Height Sealing JointsTOP View Unlimited 11 Overlap Fit Method Tonic or Martini Decorative Front Facing Material13 Inside Fit Method Tonic Decorative Front Only Decorative Fronts Dimensions of Tonic Decorative FrontAppliance Setup Air Shutter Setting Media OptionsVerify Performance of Appliance Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Ues to spark, and main Symptom Possible Cause Corrective Action Frequently Asked Questions/TroubleshootingComponent Access Access Through the Valve Assembly Pilot Assembly Replacement Gas Valve ReplacementReference Materials Appliance Dimension DiagramInspect Maintenance Tasks Maintenance TasksVent Components Diagrams 152 mm 165 mmSLP-45 45 Elbow 168 mm 10-1/4 SLP90- 90 ElbowSnorkel Support Box-Black Ceiling Firestop Wall Thimble-Black Adapter15-1/2 394 mm SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP XLR-N-AU, XLR-PB-AU Service Parts#14 Valve Assembly XLR-N-AU, XLR-PB-AU Service Parts ListContact Information