Heat & Glo LifeStyle XLR-PB-AU, XLR-N-AU manual Air Shutter Setting, Media Options

Page 54

G. Air Shutter Setting

Air shutter settings may be adjusted by a qualified install- er at the time of installation. The air shutter is set at the factory for minimum vertical vent run. Adjust air shutter for longer vertical runs. See Figure 14.2.

Loosen the 1/4 in. (6 mm) screw.

Twist shutter to adjust

Shutter may be open for longer horizontal vent runs.

Do not close the air shutter more than 5/8 in. (16 mm) for NG or 3-1/8 in. (80 mm) for LP. Note: the air shutter should be fully open when using butane.

Tighten the screw.

NOTICE: If the flames appear to be orange, open the air shutter to prevent residue buildup on the glass.

Figure 14.2 Air Shutter

Shutter Settings - Glass Media and Media-Stones-2

 

USA/Canada

Europe

AU

NZ

NG

1/16 in.

.2 cm

2 mm

2 mm

LP (Propane)

5/16 in.

.8 cm

8 mm

8 mm

 

 

 

 

 

Butane*

N/A

Full Open

Full Open

Full Open

 

 

 

 

 

*Butane gas is only approved for use in Europe, Australia, and New Zealand

Shutter Settings - XLR Logs

 

USA/Canada

Europe

AU

NZ

 

 

 

 

 

NG

3/16 in.

.5 cm

5 mm

7 mm

 

 

 

 

 

LP (Propane)

7/16 in.

1.1 cm

11 mm

11 mm

Butane*

N/A

Full Open

Full Open

Full Open

*Butane gas is only approved for use in Europe, Australia, and New Zealand

H. Media Options

Unit ships without a media option. Available approved media options are:

MEDIA-AMBER

MEDIA-BLACK

MEDIA-CLEAR

MEDIA-COBALT

MEDIA-BK2-GEMS

MEDIA-WH2-GEMS

MEDIA-GEMS

PORC-BASE

XLR-LOGS

MEDIA-STONES-2

I. Verify Performance of Appliance

1.Verify pilot sparks, pilot lights, pilot stops sparking, and the main burner turns “ON” by turning wall control “ON”.

2.Turn fireplace OFF. Verify that the both the pilot and burner turn “OFF”.

3.Repeat Step 1 above.

4.With the burner “ON” remove the green wire connected to the gas valve after the second audible “beep” from the control module is heard. The main burner should shut off. Turn appliance “OFF”.

5.Reattach the green wire to the valve and turn ON the fireplace. The main burner should light after the second audible “beep” from the control module is heard.

6.With the main burner ON, remove the green wire con- nected to the gas valve after the second audible “beep” from the control module is heard. The main burner should shut off.

7.Turn fireplace “OFF” and reattach orange wire to the valve.

54

Heat & Glo • XLR-N-AU, XLR-PB-AU2198-906 Rev. M • 5/12

Image 54
Contents Ref No GSCS20139 AS4558 SAI GlobalWhat to do if you smell gas Models XLR-N-AU, XLR-PB-AU Congratulations Homeowner Reference InformationTable of Contents User GuideComponent Access Appliance SetupTroubleshooting FinishingAustralian Warranty Information Limited Lifetime WarrantyOther Rights This warranty is void if PerthListing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Decorative Doors and FrontsNine Hour Safety Shutdown Feature Control Module OperationLighting Instructions IPI Final inspection byAGE 110/120 VAC or 220/240 Frequently Asked Questions Initial Break-in ProcedureAfter Fireplace is Lit Glass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Decorative DoorsFirebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection Control Compartment and Firebox TopGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel Leg Combustible/Non-Combustible Mantel and Wall ProjectionsMantels Combustible/Non-Combustible Front Side Finishing DetailTermination Locations Vent Termination Minimum ClearancesMIN. Clearance in. mm Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Minimum MaximumTop Vent Horizontal Termination Venting with 2 elbowsTop Vent Vertical Termination No Elbows V1 Max= 44 ft .4 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 4 elbows Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentInstalling the Optional Heat-Zone-240V Kit Securing and Leveling the ApplianceInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 17 Venting through the WallGas Information Gas ConnectionAccess Through the Valve Assembly Valve Pressure TapsOptional Accessories Requirements Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Remote Control Receiver LocationElectrical Service and Repair Junction Cord Information Junction Cord InformationFraming and Finishing Instructions Non-Combustible Materials SpecificationFinishing Finishing InstructionsFinishing Details Sealing Joints Required Fireplace Opening HeightTOP View Unlimited Facing Material 11 Overlap Fit Method Tonic or Martini Decorative Front13 Inside Fit Method Tonic Decorative Front Only Dimensions of Tonic Decorative Front Decorative FrontsAppliance Setup Air Shutter Setting Media OptionsVerify Performance of Appliance Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Ues to spark, and main Frequently Asked Questions/Troubleshooting Symptom Possible Cause Corrective ActionComponent Access Access Through the Valve Assembly Gas Valve Replacement Pilot Assembly ReplacementAppliance Dimension Diagram Reference MaterialsMaintenance Tasks Inspect Maintenance TasksVent Components Diagrams SLP-45 45 Elbow 168 mm 10-1/4 165 mm152 mm SLP90- 90 ElbowSnorkel Support Box-Black Ceiling Firestop Wall Thimble-Black Adapter15-1/2 394 mm SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Service Parts XLR-N-AU, XLR-PB-AU#14 Valve Assembly Service Parts List XLR-N-AU, XLR-PB-AUContact Information