Heat & Glo LifeStyle XLR-N-AU, XLR-PB-AU manual MIN. Clearance in. mm

Page 23

 

 

 

 

 

 

a

 

 

j

 

T

 

 

 

 

 

h

 

c

 

 

 

 

 

 

 

 

j

j

e

e

d

 

 

openable

 

h

 

 

 

 

window

 

P

 

 

 

 

 

h

 

 

 

n

door

 

g

 

 

 

 

 

f

 

k

 

T

 

M

 

 

 

 

 

 

 

 

 

 

I

 

 

 

d

 

c

 

 

 

 

 

 

 

 

b

 

 

 

 

g

 

 

 

 

k

 

 

 

 

 

 

 

 

 

 

See note 2

See note 3

T

T = Flue terminal

M = Gas meter

Shading indicates prohibited

I = Mechanical air inlet

P = Electricity meter or fuse box

areas for flue terminals

a

- Below eaves, balconies or other projections:

MIN. CLEARANCE - in. (mm)

 

Appliances up to 50 MJ/h input

12

(300)

 

Appliances over 50 MJ/h input

20-1/2

(500)

b

- From the ground or above a balcony

12

(300)

c

- From a return wall or external corner

20-1/2

(500)

d

- From a gas meter (M)

39

(1000)

e

- From an electricity meter or fuse box (P)

20-1/2

(500)

f

- From a drain or soil pipe

6

(150)

g- Horizontally from any building structure (unless appliance approved

for closer installation) or obstruction facing a terminal

20-1/2

(500)

h - From any other flue terminal, cowl, or combustion air intake

20-1/2

(500)

j- Horizontally from an openable window, door, non-mechanical air

 

inlet, or any other opening into a building, with the exception of

 

 

 

sub-floor ventilation:

 

 

 

 

 

Appliances up to 150 MJ/h input

 

20-1/2

(500)

 

Appliances over 150 MJ/h input

 

60

(1500)

k

- From a mechanical air inlet, including a spa blower

60

(1500)

n

- Vertically below an openable window, non-mechanical air

 

 

 

inlet or any other opening into a building, with the exception of

See table

 

sub-floor ventilation

 

 

 

below

 

 

 

 

 

 

 

 

CLEARANCE

 

 

 

 

 

 

 

 

 

Space Heaters

 

All other appliances

 

 

 

Up to 50 MJ/h input

Up to 50 MJ/h input

Over 50 MJ/h input and

Over 50 MJ/h input

 

Up to 150 MJ/h input

 

 

 

 

 

 

6 in. (150 mm)

20 in. (500 mm)

39 in. (1000 mm)

59 in. (1500 mm)

NOTES: 1. All distances are measured vertically or horizontally along the wall to a point in line with the nearest part of the terminal.

2.Prohibited area below electricity meter or fuse box extends to ground level.

3.See clause 5.13.6.6 for restrictions on a flue terminal under a roofed area.

4.See Appendix J, Figure J1(a) and J2(a) for clearances required from a flue

terminal to a LP Gas cylinder. A flue terminal is considered to be a source of ignition.

MINIMUM CLEARANCES REQUIRED FOR BALANCED FLUE TERMINALS

OR THE FLUE TERMINALS OF OUTDOOR APPLIANCES

Figure 6.3 Minimum Clearances for Termination

Heat & Glo • XLR-N-AU, XLR-PB-AU2198-906 Rev. M • 5/12

23

Image 23
Contents What to do if you smell gas Ref No GSCS20139 AS4558SAI Global Models XLR-N-AU, XLR-PB-AU Homeowner Reference Information CongratulationsUser Guide Table of ContentsFinishing Appliance SetupTroubleshooting Component AccessLimited Lifetime Warranty Australian Warranty InformationOther Rights Perth This warranty is void ifListing and Code Approvals Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Decorative Doors and Fronts Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceControl Module Operation Nine Hour Safety Shutdown FeatureAGE 110/120 VAC or 220/240 Lighting Instructions IPIFinal inspection by After Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Decorative Doors Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningControl Compartment and Firebox Top Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxTypical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseFront Side Finishing Detail Mantel and Wall ProjectionsMantels Combustible/Non-Combustible Mantel Leg Combustible/Non-CombustibleVent Termination Minimum Clearances Termination LocationsMIN. Clearance in. mm Vent Information and Diagrams Minimum Maximum Top Vent Horizontal Termination Venting with 1 elbowVenting with 2 elbows Top Vent Horizontal TerminationExhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 Max= 44 ft .4 mV1 Minimum Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 2 elbowsV1 Minimum H1 + H2 Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 3 elbowsTop Vent Vertical Termination Venting with 4 elbows Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Top Vent Appliance PreparationSecuring and Leveling the Appliance Installing the Optional Heat-Zone-240V KitAssemble Vent Sections Installing Vent Pipe SLP PipeSecure The Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components 17 Venting through the Wall Install Horizontal Termination CapGas Connection Gas InformationValve Pressure Taps Access Through the Valve AssemblyOptional Remote Control Receiver Location Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Accessories RequirementsJunction Cord Information Electrical Service and Repair Junction Cord InformationFinishing Instructions Non-Combustible Materials SpecificationFinishing Framing and Finishing InstructionsFinishing Details Required Fireplace Opening Height Sealing JointsTOP View Unlimited 11 Overlap Fit Method Tonic or Martini Decorative Front Facing Material13 Inside Fit Method Tonic Decorative Front Only Decorative Fronts Dimensions of Tonic Decorative FrontAppliance Setup Verify Performance of Appliance Air Shutter SettingMedia Options IntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Symptom Possible Cause Corrective Action Frequently Asked Questions/TroubleshootingComponent Access Access Through the Valve Assembly Pilot Assembly Replacement Gas Valve ReplacementReference Materials Appliance Dimension DiagramInspect Maintenance Tasks Maintenance TasksVent Components Diagrams SLP90- 90 Elbow 165 mm152 mm SLP-45 45 Elbow 168 mm 10-1/415-1/2 394 mm Snorkel Support Box-BlackCeiling Firestop Wall Thimble-Black Adapter SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP XLR-N-AU, XLR-PB-AU Service Parts#14 Valve Assembly XLR-N-AU, XLR-PB-AU Service Parts ListContact Information