B. Constructing the Appliance Chase

A chase is a vertical box-like structure built to enclose the gas appliance and/or its vent system. In cooler climates the vent should enclosed inside the chase.

NOTICE: Treatment of ceiling firestops and wall shield firestops and construction of the chase may vary with the type of building. These instructions are not substitutes for the requirements of local building codes. Therefore, you MUST check local building codes to determine the requirements to these steps.

Chases should be constructed in the manner of all out- side walls of the home to prevent cold air drafting prob- lems. The chase should not break the outside building envelope in any manner.

C. Clearances

NOTICE: Install appliance on hard metal or wood surfaces extending full width and depth. DO NOT install directly on carpeting, vinyl, tile or any combustible material other than wood.

WARNING! Risk of Fire! Maintain specified air space clearances to appliance and vent pipe:

Insulation and other materials must be secured to prevent accidental contact.

The chase must be properly blocked to prevent blown insulation or other combustibles from entering and making contact with fireplace or chimney.

Failure to maintain airspace may cause overheating and a fire.

Note: Figure 5.2 shows the fireplace installed on the floor. However, this fireplace can be elevated off the floor provided that the fireplace is properly supported by framing materials and the ceiling clearances are maintained.

NOTE: Frame opening height is greater than plaster opening height.

A

F

B

C

D

MEASURE FROM TOP

OF FIREPLACE OPENING

E

H J

G

I

MINIMUM FRAMING DIMENSIONS*

 

A

B

C

D

E

F

G

H

I

J

 

Rough

Rough

Rough

Rough

Clearance

Combustible

Combustible

Behind

Sides of

Front of

 

Opening

Opening

Opening

Opening

 

to Ceiling

Floor

Flooring

Appliance

Appliance

Appliance

 

(Vent Pipe)

(Height)

(Depth)

(Width)

 

 

 

 

 

 

Inches

8-3/4

42

18

50

31

0

0

1

1

36

 

 

 

 

 

 

 

 

 

 

 

Millimeters

220

1070

460

1270

790

0

0

30

30

910

 

 

 

 

 

 

 

 

 

 

 

Figure 5.2. Clearances to Combustibles

20

Heat & Glo • XLR-N-AU, XLR-PB-AU2198-906 Rev. M • 5/12

Image 20
Contents What to do if you smell gas Ref No GSCS20139 AS4558SAI Global Models XLR-N-AU, XLR-PB-AU Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingComponent Access FinishingAustralian Warranty Information Limited Lifetime WarrantyOther Rights This warranty is void if PerthListing and Code Approvals Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesClear Space Decorative Doors and FrontsNine Hour Safety Shutdown Feature Control Module OperationAGE 110/120 VAC or 220/240 Lighting Instructions IPIFinal inspection by After Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Decorative DoorsMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionFirebox Control Compartment and Firebox TopGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections Mantels Combustible/Non-CombustibleMantel Leg Combustible/Non-Combustible Front Side Finishing DetailTermination Locations Vent Termination Minimum ClearancesMIN. Clearance in. mm Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Minimum MaximumTop Vent Horizontal Termination Venting with 2 elbowsTop Vent Vertical Termination No Elbows V1 Max= 44 ft .4 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 4 elbows Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Top VentInstalling the Optional Heat-Zone-240V Kit Securing and Leveling the ApplianceInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components Install Horizontal Termination Cap 17 Venting through the WallGas Information Gas ConnectionAccess Through the Valve Assembly Valve Pressure TapsWiring Requirements IntelliFire Plus Ignition System WiringOptional Accessories Requirements Optional Remote Control Receiver LocationElectrical Service and Repair Junction Cord Information Junction Cord InformationNon-Combustible Materials Specification FinishingFraming and Finishing Instructions Finishing InstructionsFinishing Details Sealing Joints Required Fireplace Opening HeightTOP View Unlimited Facing Material 11 Overlap Fit Method Tonic or Martini Decorative Front13 Inside Fit Method Tonic Decorative Front Only Dimensions of Tonic Decorative Front Decorative FrontsAppliance Setup Verify Performance of Appliance Air Shutter SettingMedia Options IntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Frequently Asked Questions/Troubleshooting Symptom Possible Cause Corrective ActionComponent Access Access Through the Valve Assembly Gas Valve Replacement Pilot Assembly ReplacementAppliance Dimension Diagram Reference MaterialsMaintenance Tasks Inspect Maintenance TasksVent Components Diagrams 165 mm 152 mmSLP-45 45 Elbow 168 mm 10-1/4 SLP90- 90 Elbow15-1/2 394 mm Snorkel Support Box-BlackCeiling Firestop Wall Thimble-Black Adapter SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Service Parts XLR-N-AU, XLR-PB-AU#14 Valve Assembly Service Parts List XLR-N-AU, XLR-PB-AUContact Information