Heat & Glo LifeStyle XLR-PB-AU, XLR-N-AU manual #14 Valve Assembly

Page 68

Service Parts

XLR-N-AU, XLR-PB-AU

 

 

 

Beginning Manufacturing Date: Nov 2009

 

Ending Manufacturing Date: ______

#14 Valve Assembly

13.1

 

 

13.2

 

13.3

 

13.13

 

13.4

 

13.5

 

13.6

 

13.7

 

13.8

 

13.9

 

13.11

 

13.10

IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement parts for your appliance please provide model number and serial number. All parts listed in this manual may be ordered from an authorized dealer.

ITEM

DESCRIPTION

COMMENTS

PART NUMBER

13.1

Pilot Shield

 

2184-123

13.2

Pilot Assembly N

 

2090-012

Pilot Assembly P & B

 

2090-013

 

 

13.3

Pilot Bracket

 

2198-174

13.4

3-Hole Grommet

 

2118-420

13.5

Bulkhead W/Flex Tube

 

383-302A

13.6

Male Connector

Pkg of 5

303-315/5

13.7

Valve Bracket

 

2198-153

13.8

Valve N

 

2166-308

Valve P & B

 

2166-309

 

 

13.9

Module Wire Assembly

 

2166-304

13.10

Module, Gray

 

2166-306

13.11

Flex Ball Valve Assembly

 

2098-320A

13.12

Power Supply

 

2166-305

13.13

Bracket

 

2143-143

 

Orifice N (#42C)

 

582-842

 

Orifice B (#55C)

 

582-855

 

Orifice P (.057C)

 

582-057

Additional service part numbers appear on following page.

68

Heat & Glo • XLR-N-AU, XLR-PB-AU2198-906 Rev. M • 5/12

Image 68
Contents What to do if you smell gas Ref No GSCS20139 AS4558SAI Global Models XLR-N-AU, XLR-PB-AU Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingComponent Access FinishingAustralian Warranty Information Limited Lifetime WarrantyOther Rights This warranty is void if PerthListing and Code Approvals Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesClear Space Decorative Doors and FrontsNine Hour Safety Shutdown Feature Control Module OperationAGE 110/120 VAC or 220/240 Lighting Instructions IPIFinal inspection by After Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Decorative DoorsMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionFirebox Control Compartment and Firebox TopGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections Mantels Combustible/Non-CombustibleMantel Leg Combustible/Non-Combustible Front Side Finishing DetailTermination Locations Vent Termination Minimum ClearancesMIN. Clearance in. mm Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Minimum MaximumTop Vent Horizontal Termination Venting with 2 elbowsTop Vent Vertical Termination No Elbows V1 Max= 44 ft .4 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 4 elbows Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Top VentInstalling the Optional Heat-Zone-240V Kit Securing and Leveling the ApplianceInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components Install Horizontal Termination Cap 17 Venting through the WallGas Information Gas ConnectionAccess Through the Valve Assembly Valve Pressure TapsWiring Requirements IntelliFire Plus Ignition System WiringOptional Accessories Requirements Optional Remote Control Receiver LocationElectrical Service and Repair Junction Cord Information Junction Cord InformationNon-Combustible Materials Specification FinishingFraming and Finishing Instructions Finishing InstructionsFinishing Details Sealing Joints Required Fireplace Opening HeightTOP View Unlimited Facing Material 11 Overlap Fit Method Tonic or Martini Decorative Front13 Inside Fit Method Tonic Decorative Front Only Dimensions of Tonic Decorative Front Decorative FrontsAppliance Setup Verify Performance of Appliance Air Shutter SettingMedia Options IntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Frequently Asked Questions/Troubleshooting Symptom Possible Cause Corrective ActionComponent Access Access Through the Valve Assembly Gas Valve Replacement Pilot Assembly ReplacementAppliance Dimension Diagram Reference MaterialsMaintenance Tasks Inspect Maintenance TasksVent Components Diagrams 165 mm 152 mmSLP-45 45 Elbow 168 mm 10-1/4 SLP90- 90 Elbow15-1/2 394 mm Snorkel Support Box-BlackCeiling Firestop Wall Thimble-Black Adapter SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Service Parts XLR-N-AU, XLR-PB-AU#14 Valve Assembly Service Parts List XLR-N-AU, XLR-PB-AUContact Information