Non-Combustible Finish Materials

0 in. to 4 in. (0 mm to 102 mm) Thick Inside Fit Method

The Tonic decorative front is approved for inside fit ap- plications. Non-combustible finishing materials up to 4 in. (102 mm) thick can be installed around the front (left, right, top, and bottom).

For the Tonic decorative front inside fit applications, the decorative front must be installed tight to the finishing flanges and must not overlap any finish material.

Ensure that no non-combustible finish materials are in- stalled within 3/4 in. (19 mm) of the fireplace opening. The 3/4 in. (19 mm) spacing is required to provide clear- ance for removing and installing the Tonic decorative front. See Figure 13.14.

FACTORY-INSTALLED

NON-COMBUSTIBLE

BOARD

 

 

 

 

 

 

 

 

 

 

0-4 in.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(0-102 mm)

 

3/4 in.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(19 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

20-1/2 in. (520 mm)

APPLIANCE

OPENING (HEIGHT)

3 in. (76 mm)

0-4 in. (0-102 mm)

DRYWALL OR EQUIVALENT 3/8 in. (10 mm)

Figure 13.13 Inside Fit Method (Tonic Decorative Front Only)

Non-Combustible Finish Material 0 - 4 in. (0 - 102 mm) Thick

3/4 in (19 mm)

 

3/4 in (19 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3 in. (76 mm)

Bottom Joint

Figure 13.14 Noncombustible Surface Finishing Material 0 - 4 in. (0 - 102 mm) Thick-Inside Fit Method (Tonic Decorative Front Only)

Heat & Glo • XLR-N-AU, XLR-PB-AU2198-906 Rev. M • 5/12

51

Image 51
Contents Ref No GSCS20139 AS4558 SAI GlobalWhat to do if you smell gas Models XLR-N-AU, XLR-PB-AU Homeowner Reference Information CongratulationsUser Guide Table of ContentsFinishing Appliance SetupTroubleshooting Component AccessLimited Lifetime Warranty Australian Warranty InformationOther Rights Perth This warranty is void ifListing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Decorative Doors and Fronts Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceControl Module Operation Nine Hour Safety Shutdown FeatureLighting Instructions IPI Final inspection byAGE 110/120 VAC or 220/240 Frequently Asked Questions Initial Break-in ProcedureAfter Fireplace is Lit Decorative Doors Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningControl Compartment and Firebox Top Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxTypical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseFront Side Finishing Detail Mantel and Wall ProjectionsMantels Combustible/Non-Combustible Mantel Leg Combustible/Non-CombustibleVent Termination Minimum Clearances Termination LocationsMIN. Clearance in. mm Vent Information and Diagrams Minimum Maximum Top Vent Horizontal Termination Venting with 1 elbowVenting with 2 elbows Top Vent Horizontal TerminationExhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 Max= 44 ft .4 mV1 Minimum Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 2 elbowsV1 Minimum H1 + H2 Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 3 elbowsTop Vent Vertical Termination Venting with 4 elbows Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe SLP Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Top Vent Appliance PreparationSecuring and Leveling the Appliance Installing the Optional Heat-Zone-240V KitAssemble Vent Sections Installing Vent Pipe SLP PipeSecure The Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination 17 Venting through the Wall Install Horizontal Termination CapGas Connection Gas InformationValve Pressure Taps Access Through the Valve AssemblyOptional Remote Control Receiver Location Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Accessories RequirementsJunction Cord Information Electrical Service and Repair Junction Cord InformationFinishing Instructions Non-Combustible Materials SpecificationFinishing Framing and Finishing InstructionsFinishing Details Required Fireplace Opening Height Sealing JointsTOP View Unlimited 11 Overlap Fit Method Tonic or Martini Decorative Front Facing Material13 Inside Fit Method Tonic Decorative Front Only Decorative Fronts Dimensions of Tonic Decorative FrontAppliance Setup Air Shutter Setting Media OptionsVerify Performance of Appliance Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Ues to spark, and main Symptom Possible Cause Corrective Action Frequently Asked Questions/TroubleshootingComponent Access Access Through the Valve Assembly Pilot Assembly Replacement Gas Valve ReplacementReference Materials Appliance Dimension DiagramInspect Maintenance Tasks Maintenance TasksVent Components Diagrams SLP90- 90 Elbow 165 mm152 mm SLP-45 45 Elbow 168 mm 10-1/4Snorkel Support Box-Black Ceiling Firestop Wall Thimble-Black Adapter15-1/2 394 mm SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP XLR-N-AU, XLR-PB-AU Service Parts#14 Valve Assembly XLR-N-AU, XLR-PB-AU Service Parts ListContact Information