Heat & Glo LifeStyle XLR-N-AU manual Finishing, Appliance Setup, Troubleshooting, Component Access

Page 5

13 Finishing

A. Framing and Finishing Instructions . . . . . . . . . 46

B. Mantel and Wall Projections. . . . . . . . . . . . 49

C. Facing Material. . . . . . . . . . . . . . . . . 50

D. Decorative Fronts. . . . . . . . . . . . . . . . 52

14 Appliance Setup

A.

Remove Fixed Glass Assembly

. 53

B.

Remove the Shipping Materials

. 53

C.

Clean the Appliance

53

D.

Accessories

53

E.

Fixed Glass Assembly

53

F.

Install the Mesh

. 53

G. Air Shutter Setting

. 54

H. Media Options

54

I.

Verify Performance of Appliance

54

15 Troubleshooting

A. IntelliFire Plus™ Ignition System. . . . . . . . . . 55

16 Component Access

A.Decorative Front and Fixed Glass Assembly Removal . . 58

B.Valve Pressure Taps. . . . . . . . . . . . . . . 58

C.Control Module Access. . . . . . . . . . . . . . . . . . . . . . . . . . . 58

D.Media Tray Removal . . . . . . . . . . . . . . . 58

E.Burner and Base Pan Removal. . . . . . . . . . . 58

F.Access Through the Valve Assembly. . . . . . . . . 59

G.Gas Valve Replacement. . . . . . . . . . . . . . 60

H.Pilot Assembly Replacement. . . . . . . . . . . . 60

17 Reference Materials

A. Appliance Dimension Diagram. . . . . . . . . . . 61

B. Maintenance Tasks . . . . . . . . . . . . . . . 62

C. Vent Components Diagrams . . . . . . . . . . . . 63

D. Service Parts List . . . . . . . . . . . . . . . . 69 E. Contact Information . . . . . . . . . . . . . . . 70

= Contains updated information.

Heat & Glo • XLR-N-AU, XLR-PB-AU2198-906 Rev. M • 5/12

5

Image 5 Contents
What to do if you smell gas Ref No GSCS20139 AS4558 SAI Global Models XLR-N-AU, XLR-PB-AU Homeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupComponent Access FinishingLimited Lifetime Warranty Australian Warranty InformationOther Rights Perth This warranty is void ifListing and Code Approvals Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyClear Space Decorative Doors and FrontsControl Module Operation Nine Hour Safety Shutdown FeatureAGE 110/120 VAC or 220/240 Lighting Instructions IPIFinal inspection by After Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Maintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Decorative DoorsGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianFirebox Control Compartment and Firebox TopTypical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMantels Combustible/Non-Combustible Mantel and Wall ProjectionsMantel Leg Combustible/Non-Combustible Front Side Finishing DetailVent Termination Minimum Clearances Termination LocationsMIN. Clearance in. mm Vent Information and Diagrams Minimum Maximum Top Vent Horizontal Termination Venting with 1 elbowVenting with 2 elbows Top Vent Horizontal TerminationExhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 Max= 44 ft .4 mV1 Minimum Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 2 elbowsV1 Minimum H1 + H2 Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 3 elbowsTop Vent Vertical Termination Venting with 4 elbows Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Top Vent Appliance PreparationSecuring and Leveling the Appliance Installing the Optional Heat-Zone-240V KitAssemble Vent Sections Installing Vent Pipe SLP PipeSecure The Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components 17 Venting through the Wall Install Horizontal Termination CapGas Connection Gas InformationValve Pressure Taps Access Through the Valve AssemblyIntelliFire Plus Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Optional Remote Control Receiver LocationJunction Cord Information Electrical Service and Repair Junction Cord InformationFinishing Non-Combustible Materials SpecificationFraming and Finishing Instructions Finishing InstructionsFinishing Details Required Fireplace Opening Height Sealing JointsTOP View Unlimited 11 Overlap Fit Method Tonic or Martini Decorative Front Facing Material13 Inside Fit Method Tonic Decorative Front Only Decorative Fronts Dimensions of Tonic Decorative FrontAppliance Setup Verify Performance of Appliance Air Shutter SettingMedia Options IntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Symptom Possible Cause Corrective Action Frequently Asked Questions/TroubleshootingComponent Access Access Through the Valve Assembly Pilot Assembly Replacement Gas Valve ReplacementReference Materials Appliance Dimension DiagramInspect Maintenance Tasks Maintenance TasksVent Components Diagrams 152 mm 165 mmSLP-45 45 Elbow 168 mm 10-1/4 SLP90- 90 Elbow15-1/2 394 mm Snorkel Support Box-BlackCeiling Firestop Wall Thimble-Black Adapter SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP XLR-N-AU, XLR-PB-AU Service Parts#14 Valve Assembly XLR-N-AU, XLR-PB-AU Service Parts ListContact Information