Heat & Glo LifeStyle SLR-C (COSMO) Vent Information and Diagrams, A. Approved Pipe, Effective

Page 24
7 Vent Information and Diagrams

7 Vent Information and Diagrams

A. Approved Pipe

This appliance is approved for use with Hearth & Home Technologies SLP venting systems. Refer to Section 16.B for vent component information.

DO NOT mix pipe, fittings or joining methods from differ- ent manufacturers.

The pipe is tested to be run inside an enclosed wall. There is no requirement for inspection openings at each joint within the wall.

WARNING! Risk of Fire or Asphyxiation. This appli- ance requires a separate vent. DO NOT vent to a pipe serving a separate solid fuel burning appliance.

NOTICE: The SLP-HRC-SS and SLP-HRC-ZC-SS termina- tion caps are NOT approved for use with propane fuel.

B. Vent Table Key

The abbreviations listed in this vent table key are used in the vent diagrams.

Symbol

Description

 

 

V1

First section (closest to appliance) of vertical length

 

 

V2

Second section of vertical length

 

 

H1

First section (closest to appliance) of horizontal length

 

 

H2

Subsequent sections of horizontal length

 

 

C. Use of Elbows

Diagonal runs have both vertical and horizontal vent as- pects when calculating the effects. Use the rise for the vertical aspect and the run for the horizontal aspect (see Figure 7.1).

Two 45º elbows may be used in place of one 90º elbow. On 45º runs, one foot of diagonal is equal to 8-1/2 in. (216

mm)horizontal run and 8-1/2 in. (216 mm) vertical run. A length of straight pipe is allowed between two 45º elbows (see Figure 7.1).

Vertical

in.1/2

-8

8-1/2 in.

A. Approved Pipe Horizontal B. Vent Table Key

Figure 7.1

D. Measuring Standards

Vertical and horizontal measurements listed in the vent diagrams were made using the following standards.

Pipe measurements are shown using the effective length of pipe (see Figure 7.2).

Measurements are made from the appliance outer wrap, not from the standoffs.

Horizontal terminations are measured to the outside mounting surface (flange of termination cap).

Vertical terminations are measured to bottom of termination cap.

Horizontal pipe installed level with no rise.

A C. Use of Elbows

B

1-1/4 in. (32 mm)

OVERLAP

Figure 7.2 Chimney Offset/Return

 

Effective Height/Length

 

Pipe

inches

mm

 

SLP4

4

102

Effective

SLP6

6

152

SLP12

12

305

Height/

SLP24

24

610

Length

SLP36

36

914

 

 

SLP48

48

1219

 

SLP6A

2 - 6

51 - 152

 

SLP12A

2 - 12

51 - 305

Figure 7.3 SLP Pipe Effective Length

E. Vent Diagrams

General Rules:

When penetrating a combustible wall, a wall shield firestop must be installed.

When penetrating a combustible ceiling, a ceiling firestop must be installed.

Horizontal runs of vent do not require vertical rise; horizontal runs may be level.

24

Heat & Glo • SLR-C2292-900 Rev. D • 8/12

Image 24
Contents NOTICE Model SLR-CCOSMO•What to do if you smell gas Owner’s ManualA. Congratulations Homeowner Reference InformationTable of Contents Safety Alert KeyInstaller Guide User Guide14 Appliance Setup 15 Troubleshooting = Contains updated information 13 FinishingB. Limited Lifetime Warranty LIMITED LIFETIME WARRANTYWARRANTY COVERAGE WARRANTY PERIODB. Limited Lifetime Warranty continued WARRANTY CONDITIONSWARRANTY EXCLUSIONS This warranty is void ifD. High Altitude Installations 1 Listing and Code ApprovalsA. Appliance Certification B. Tempered Glass SpecificationsInstallation of Carbon Monoxide Detectors A. Gas Fireplace Safety 2 Operating Instructions User GuideB. Your Fireplace WARNING! Choking Hazard! Keep glass rock mediaE. Fixed Glass Assembly C. Clear SpaceD. Decorative Doors and Fronts G. Before Lighting FireplaceH. Lighting Instructions IPI Final inspection byFOR YOUR SAFETY READ BEFORE LIGHTING LIGHTING INSTRUCTIONS IPIJ. Frequently Asked Questions I. After Fireplace is LitInitial Break-inProcedure •Some people may be sensitive to smoke and odors3 Maintenance and Service A. Maintenance Tasks-HomeownerGlass Cleaning Remote ControlB.Maintenance Tasks-QualifiedService Technician Gasket Seal and Glass Assembly InspectionFirebox Control Compartment and Firebox TopGetting Started A. Typical Appliance SystemInstaller Guide WALL SWITCHB. Design and Installation Considerations C. Tools and Supplies NeededD. Inspect Appliance and Components 5 Framing and Clearances A. Selecting Appliance LocationB. Constructing the Appliance Chase Heat & Glo • SLR-C• 2292-900Rev. D • 8/12C. Clearances MINIMUM FRAMING DIMENSIONSD. Mantel and Wall Projections Figure 5.8 Non-CombustibleZone Heat & Glo • SLR-C• 2292-900Rev. D • 8/123-1/2IN 6 Termination Locations A. Vent Termination Minimum Clearances= AREA WHERE TERMINAL IS NOT PERMITTED Covered Alcove ApplicationsV= VENT TERMINAL X = AIR SUPPLY INLET 7 Vent Information and Diagrams E. Vent DiagramsA. Approved Pipe B. Vent Table KeyTop Vent - Horizontal Termination Venting with 1 elbow1. Top Vent - Horizontal Termination - continued Venting with 2 elbowsINSTALLED HORIZONTALLY Top Vent - Horizontal TerminationVenting with 3 elbows 1. Top Vent - Horizontal Termination - continuedTop Vent - Horizontal Termination SLR-CINSTALLED HORIZONTALLY INSTALLED HORIZONTALLYH2 H1 V1 1. Top Vent - Horizontal Termination - continuedTop Vent - Vertical Termination No Elbows V1 = 44 ft. Max. 13.4 mExhaust restrictor Instructions PILOT HOLESTop Vent - Vertical Termination Venting with 2 elbowsSLR-C V1 MinimumTop Vent - Vertical Termination Venting with 3 elbowsSLR-C V1 MinimumVenting with 4 elbows Top Vent - Vertical TerminationV3 H2 H1 V1 V1 MINCoaxial to Colinear Venting Prior to installing the gas applianceTable Clearances to CombustiblesTOP VENT •Vent this appliance directly outside•Use separate vent system for this appliance 8 Vent Clearances and Framing A. Pipe Clearances to CombustiblesB. Wall Penetration Framing •Between ceiling firestopsC. Install the Ceiling Firestop D. Install Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation 9 Appliance Preparation A. Top VentB. Securing and Leveling the Appliance WARNING! Risk of Fire! Prevent contact with•Sagging or loose insulation •Insulation backing or plastic10 Installing Vent Pipe SLP Pipe A. Assemble Vent SectionsB. Assemble Slip Sections C. Secure The Vent SectionsPilot hole E. Install Decorative Ceiling Components D. Disassemble Vent SectionsF. Install Metal Roof Flashing G. Assemble and Install Storm CollarCAULK H. Install Vertical Termination Cap I. Install Decorative Wall ComponentsFigure Figure 10.16 Wall ThimbleK. Install Horizontal Termination Cap Figure 10.17 Venting through the wall11 Gas Information A. Fuel ConversionB. Gas Pressure C. Gas Connection D. High Altitude InstallationsValve Pressure Taps Ensure adequate ventilationA. Wiring Requirements B. IntelliFire Ignition System WiringC. Optional Accessories Requirements 12 Electrical InformationD. Electrical Service and Repair E. Junction Box Installation13 Finishing A. Framing and Finishing InstructionsDrywall gypsum board Plywood NON-COMBUSTIBLEBOARD Figure 13.3 Finishing DetailsFIREPLACE OPENING 15-7/8IN. TO 16-1/8INFinish and Sealing Joints Finishing Around Opening with Gypsum WallboardB. Mantel and Wall Projections C. Facing Material Non-CombustibleFinish Materials0 - 1 inch thickness-OverlapFit Method Non-CombustibleFinish Materials 0 Inches to 4 Inches Thick Inside Fit MethodNon-CombustibleFinish Material 0-4Inches Thick 3/4 IND. Decorative Fronts Table 1. Dimensions of Tonic Decorative FrontTable 1. Dimensions of Tonic Decorative Front Inside and Overlap Fit See Section 13.C14 Appliance Setup A. Remove Fixed Glass AssemblyC. Clean the Appliance D. AccessoriesPILOT SHIELD BURNER TRACKS NO GLASS ROCK MEDIA BETWEEN DASHED LINESFigure 14.4. Maintaining Media Tray Air Spaces F. Fixed Glass Assembly G. Install the MeshH. Air Shutter Setting Removing Fixed Glass Assembly15 Troubleshooting A. IntelliFire Ignition SystemIntelliFire Ignition System - continued A. Appliance Dimension Diagram 16 Reference MaterialsLocation InchesB. Vent Components Diagrams Effective Height Length6-1/2in 165 mmB. Vent Components Diagrams continued 6-11/16in3-15/16in 169 mmB. Vent Components Diagrams continued 15-1/2IN 394 mm7 IN 178 mm 12IN 305mmCOAXIAL to COLINEAR VENTING B. Vent Components Diagrams continuedOptional Wire Harness DESCRIPTIONB. Vent Components Diagrams 9 in12-1/2in 2-3/4inService Parts C. Service PartsSLR-CCOSMO StockedService Parts #11 Valve AssemblySLR-CCOSMO at DepotService Parts SLR-CCOSMOat Depot StockedD. Contact Information NOTESNOTICE