Heat & Glo LifeStyle SLR-C (COSMO) owner manual A. Framing and Finishing Instructions

Page 50
13 Finishing

13 Finishing

A. Framing and Finishing Instructions

WARNING! Risk of Fire! Comply with all minimum clear- ances to combustibles as specified. Framing closer than the minimums listed must be constructed entirely of noncom- bustible materials (i.e., steel studs, concrete board, etc.)

Finishing Instructions

It is important to follow the framing and finishing instruc- tions to ensure proper placement of fireplace into the sur- rounding framing/finishing materials.

Wall sheathing materials 1/2 in. thick are specified in this installation manual to properly align with the factory- installed non combustible material.

WARNING! Risk of Fire! DO NOT remove the factory- installed non-combustible board or cover it with combus- tible material, such as:

Drywall (gypsum board)

Plywood

Materials that do not meet the ASTM E 136 Non-com- bustibility standard (below).

Removal of factory-installed, non-combustible board and/ or use of materials not meeting the ASTM E 136 standard may cause fire.

Non-Combustible Materials Specification

Material which will not ignite and burn. Such materials are those consisting entirely of steel, iron, brick, tile, concrete, slate, glass or plasters, or any combination thereof.

Materials that are reported as passing ASTM E 136,

Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 ºC and UL763 shall be considered non-combustible materials.

Setting the Fireplace into the Framing

Unlike many traditional, single-sided Heat & Glo fireplaces, this fireplace is recessed into surround framing. The left and right nailing tabs were designed for the SLR-C model as a means to ensure the fireplace is recessed to the correct location within the framing materials.

1.Bend two nailing tabs away from fireplace 180 degrees on both left and right nailing tabs. Do not adjust the column standoffs. See Figure 13.1.

2.Screw each nailing tab to the adjoining framing mate- rial. Ensure that the 1 inch air space clearance is main- tained on the sides of the fireplace. See Figure 13.2.

FACTORY-INSTALLED

NON-COMBUSTIBLE BOARD

NAILING

TABS

Figure 13.1 Nailing Tabs Installation Position

1 IN.

FRAMING

NAILING TAB

1/2 IN. FACTORY-SUPPLIED

NON-COMBUSTIBLE BOARD

Figure 13.2 Front Side Finishing Detail

50

Heat & Glo • SLR-C2292-900 Rev. D • 8/12

Image 50
Contents •What to do if you smell gas NOTICEModel SLR-CCOSMO Owner’s ManualA. Congratulations Homeowner Reference InformationInstaller Guide Table of ContentsSafety Alert Key User Guide = Contains updated information 14 Appliance Setup15 Troubleshooting 13 FinishingWARRANTY COVERAGE B. Limited Lifetime WarrantyLIMITED LIFETIME WARRANTY WARRANTY PERIODWARRANTY EXCLUSIONS B. Limited Lifetime Warranty continuedWARRANTY CONDITIONS This warranty is void ifA. Appliance Certification D. High Altitude Installations1 Listing and Code Approvals B. Tempered Glass SpecificationsInstallation of Carbon Monoxide Detectors B. Your Fireplace A. Gas Fireplace Safety2 Operating Instructions User Guide WARNING! Choking Hazard! Keep glass rock mediaD. Decorative Doors and Fronts E. Fixed Glass AssemblyC. Clear Space G. Before Lighting FireplaceFOR YOUR SAFETY READ BEFORE LIGHTING H. Lighting Instructions IPIFinal inspection by LIGHTING INSTRUCTIONS IPIInitial Break-inProcedure J. Frequently Asked QuestionsI. After Fireplace is Lit •Some people may be sensitive to smoke and odorsGlass Cleaning 3 Maintenance and ServiceA. Maintenance Tasks-Homeowner Remote ControlFirebox B.Maintenance Tasks-QualifiedService TechnicianGasket Seal and Glass Assembly Inspection Control Compartment and Firebox TopInstaller Guide Getting StartedA. Typical Appliance System WALL SWITCHD. Inspect Appliance and Components B. Design and Installation ConsiderationsC. Tools and Supplies Needed 5 Framing and Clearances A. Selecting Appliance LocationB. Constructing the Appliance Chase Heat & Glo • SLR-C• 2292-900Rev. D • 8/12C. Clearances MINIMUM FRAMING DIMENSIONSD. Mantel and Wall Projections 3-1/2IN Figure 5.8 Non-CombustibleZoneHeat & Glo • SLR-C• 2292-900Rev. D • 8/12 6 Termination Locations A. Vent Termination Minimum ClearancesV= VENT TERMINAL X = AIR SUPPLY INLET = AREA WHERE TERMINAL IS NOT PERMITTEDCovered Alcove Applications A. Approved Pipe 7 Vent Information and DiagramsE. Vent Diagrams B. Vent Table KeyTop Vent - Horizontal Termination Venting with 1 elbowINSTALLED HORIZONTALLY 1. Top Vent - Horizontal Termination - continuedVenting with 2 elbows Top Vent - Horizontal TerminationTop Vent - Horizontal Termination Venting with 3 elbows1. Top Vent - Horizontal Termination - continued SLR-CH2 H1 V1 INSTALLED HORIZONTALLYINSTALLED HORIZONTALLY 1. Top Vent - Horizontal Termination - continuedExhaust restrictor Instructions Top Vent - Vertical Termination No ElbowsV1 = 44 ft. Max. 13.4 m PILOT HOLESSLR-C Top Vent - Vertical TerminationVenting with 2 elbows V1 MinimumSLR-C Top Vent - Vertical TerminationVenting with 3 elbows V1 MinimumV3 H2 H1 V1 Venting with 4 elbowsTop Vent - Vertical Termination V1 MINTable Coaxial to Colinear VentingPrior to installing the gas appliance Clearances to Combustibles•Use separate vent system for this appliance TOP VENT•Vent this appliance directly outside B. Wall Penetration Framing 8 Vent Clearances and FramingA. Pipe Clearances to Combustibles •Between ceiling firestopsC. Install the Ceiling Firestop Vaulted Ceiling Installation D. Install Attic Insulation ShieldFlat Ceiling Installation 9 Appliance Preparation A. Top Vent•Sagging or loose insulation B. Securing and Leveling the ApplianceWARNING! Risk of Fire! Prevent contact with •Insulation backing or plastic10 Installing Vent Pipe SLP Pipe A. Assemble Vent SectionsPilot hole B. Assemble Slip SectionsC. Secure The Vent Sections E. Install Decorative Ceiling Components D. Disassemble Vent SectionsCAULK F. Install Metal Roof FlashingG. Assemble and Install Storm Collar Figure H. Install Vertical Termination CapI. Install Decorative Wall Components Figure 10.16 Wall ThimbleK. Install Horizontal Termination Cap Figure 10.17 Venting through the wallB. Gas Pressure 11 Gas InformationA. Fuel Conversion Valve Pressure Taps C. Gas ConnectionD. High Altitude Installations Ensure adequate ventilationC. Optional Accessories Requirements A. Wiring RequirementsB. IntelliFire Ignition System Wiring 12 Electrical InformationD. Electrical Service and Repair E. Junction Box InstallationDrywall gypsum board Plywood 13 FinishingA. Framing and Finishing Instructions NON-COMBUSTIBLEBOARD Figure 13.3 Finishing DetailsFinish and Sealing Joints FIREPLACE OPENING15-7/8IN. TO 16-1/8IN Finishing Around Opening with Gypsum WallboardB. Mantel and Wall Projections 0 - 1 inch thickness-OverlapFit Method C. Facing MaterialNon-CombustibleFinish Materials Non-CombustibleFinish Material 0-4Inches Thick Non-CombustibleFinish Materials0 Inches to 4 Inches Thick Inside Fit Method 3/4 INTable 1. Dimensions of Tonic Decorative Front D. Decorative FrontsTable 1. Dimensions of Tonic Decorative Front Inside and Overlap Fit See Section 13.CC. Clean the Appliance 14 Appliance SetupA. Remove Fixed Glass Assembly D. AccessoriesFigure 14.4. Maintaining Media Tray Air Spaces PILOT SHIELD BURNER TRACKSNO GLASS ROCK MEDIA BETWEEN DASHED LINES H. Air Shutter Setting F. Fixed Glass AssemblyG. Install the Mesh Removing Fixed Glass Assembly15 Troubleshooting A. IntelliFire Ignition SystemIntelliFire Ignition System - continued Location A. Appliance Dimension Diagram16 Reference Materials Inches6-1/2in B. Vent Components DiagramsEffective Height Length 165 mm3-15/16in B. Vent Components Diagrams continued6-11/16in 169 mm7 IN 178 mm B. Vent Components Diagrams continued15-1/2IN 394 mm 12IN 305mmOptional Wire Harness COAXIAL to COLINEAR VENTINGB. Vent Components Diagrams continued DESCRIPTION12-1/2in B. Vent Components Diagrams9 in 2-3/4inSLR-CCOSMO Service PartsC. Service Parts StockedSLR-CCOSMO Service Parts#11 Valve Assembly at Depotat Depot Service PartsSLR-CCOSMO StockedNOTICE D. Contact InformationNOTES