B. Assemble Slip Sections

B. Assemble Slip Sections

Slide the inner flue of the slip section into the inner flue of the pipe section and the outer flue of the slip section over the outer flue of the pipe section. See Figure 10.3.

Slide together to the desired length.

Pilot hole

Figure 10.3 Slip Section Pilot Holes

Maintain a 1-1/2 in. (38 mm) overlap between the slip section and the pipe section.

Secure the pipe and slip section with two screws no longer than 1/2 in. (13 mm), using the pilot holes in the slip section. See Figure 10.4.

Figure 10.4 Screws into Slip Section

Continue adding pipe as necessary following instructions in “Assembling Pipe Sections.”

NOTICE: If slip section is too long, the inner and outer flues of the slip section can be cut to the desired length.

NOTICE: When installing a vent system with an HRC termination cap, all pipe system joints shall be sealed using a silicone sealant with a minimum of 300ºF continuous exposure rating.

Apply a bead of silicone sealant inside the female outer pipe joint prior to joining sections.

Only outer pipes are sealed, sealing the inner flue is not required.

All unit collar, pipe, slip section, elbow and cap outer flues shall be sealed.

C. Secure The Vent Sections

Vertical runs of pipe must be supported every 8 ft. (2.44 m).

Horizontal sections must be supported every 5 feet (1.52 m).

Vent supports or plumbers strap (spaced 120º apart) may be used to support. See figures 10.5 and 10.6.

Wall shield firestops may be used to provide horizontal support.

Ceiling firestops have tabs that may be used to provide vertical support.

WARNING! Risk of Fire, Explosion or Asphyxiation! Improper support may allow vent to sag and separate. Use vent run supports and connect vent sections per in- stallation instructions. DO NOT allow vent to sag below connection point to appliance.

Figure 10.5 Securing Vertical Pipe Sections

Figure 10.6 Securing Horizontal Pipe Sections

Heat & Glo • SLR-C2292-900 Rev. D • 8/12

41

Image 41
Contents Model SLR-CCOSMO NOTICE•What to do if you smell gas Owner’s ManualHomeowner Reference Information A. CongratulationsSafety Alert Key Table of ContentsInstaller Guide User Guide15 Troubleshooting 14 Appliance Setup = Contains updated information 13 FinishingLIMITED LIFETIME WARRANTY B. Limited Lifetime WarrantyWARRANTY COVERAGE WARRANTY PERIODWARRANTY CONDITIONS B. Limited Lifetime Warranty continuedWARRANTY EXCLUSIONS This warranty is void if1 Listing and Code Approvals D. High Altitude InstallationsA. Appliance Certification B. Tempered Glass SpecificationsInstallation of Carbon Monoxide Detectors 2 Operating Instructions User Guide A. Gas Fireplace SafetyB. Your Fireplace WARNING! Choking Hazard! Keep glass rock mediaC. Clear Space E. Fixed Glass AssemblyD. Decorative Doors and Fronts G. Before Lighting FireplaceFinal inspection by H. Lighting Instructions IPIFOR YOUR SAFETY READ BEFORE LIGHTING LIGHTING INSTRUCTIONS IPII. After Fireplace is Lit J. Frequently Asked QuestionsInitial Break-inProcedure •Some people may be sensitive to smoke and odorsA. Maintenance Tasks-Homeowner 3 Maintenance and ServiceGlass Cleaning Remote ControlGasket Seal and Glass Assembly Inspection B.Maintenance Tasks-QualifiedService TechnicianFirebox Control Compartment and Firebox TopA. Typical Appliance System Getting StartedInstaller Guide WALL SWITCHD. Inspect Appliance and Components B. Design and Installation ConsiderationsC. Tools and Supplies Needed A. Selecting Appliance Location 5 Framing and ClearancesHeat & Glo • SLR-C• 2292-900Rev. D • 8/12 B. Constructing the Appliance ChaseMINIMUM FRAMING DIMENSIONS C. ClearancesD. Mantel and Wall Projections 3-1/2IN Figure 5.8 Non-CombustibleZoneHeat & Glo • SLR-C• 2292-900Rev. D • 8/12 A. Vent Termination Minimum Clearances 6 Termination LocationsV= VENT TERMINAL X = AIR SUPPLY INLET = AREA WHERE TERMINAL IS NOT PERMITTEDCovered Alcove Applications E. Vent Diagrams 7 Vent Information and DiagramsA. Approved Pipe B. Vent Table KeyVenting with 1 elbow Top Vent - Horizontal TerminationVenting with 2 elbows 1. Top Vent - Horizontal Termination - continuedINSTALLED HORIZONTALLY Top Vent - Horizontal Termination1. Top Vent - Horizontal Termination - continued Venting with 3 elbowsTop Vent - Horizontal Termination SLR-CINSTALLED HORIZONTALLY INSTALLED HORIZONTALLYH2 H1 V1 1. Top Vent - Horizontal Termination - continuedV1 = 44 ft. Max. 13.4 m Top Vent - Vertical Termination No ElbowsExhaust restrictor Instructions PILOT HOLESVenting with 2 elbows Top Vent - Vertical TerminationSLR-C V1 MinimumVenting with 3 elbows Top Vent - Vertical TerminationSLR-C V1 MinimumTop Vent - Vertical Termination Venting with 4 elbowsV3 H2 H1 V1 V1 MINPrior to installing the gas appliance Coaxial to Colinear VentingTable Clearances to Combustibles•Use separate vent system for this appliance TOP VENT•Vent this appliance directly outside A. Pipe Clearances to Combustibles 8 Vent Clearances and FramingB. Wall Penetration Framing •Between ceiling firestopsC. Install the Ceiling Firestop Vaulted Ceiling Installation D. Install Attic Insulation ShieldFlat Ceiling Installation A. Top Vent 9 Appliance PreparationWARNING! Risk of Fire! Prevent contact with B. Securing and Leveling the Appliance•Sagging or loose insulation •Insulation backing or plasticA. Assemble Vent Sections 10 Installing Vent Pipe SLP PipePilot hole B. Assemble Slip SectionsC. Secure The Vent Sections D. Disassemble Vent Sections E. Install Decorative Ceiling ComponentsCAULK F. Install Metal Roof FlashingG. Assemble and Install Storm Collar I. Install Decorative Wall Components H. Install Vertical Termination CapFigure Figure 10.16 Wall ThimbleFigure 10.17 Venting through the wall K. Install Horizontal Termination CapB. Gas Pressure 11 Gas InformationA. Fuel Conversion D. High Altitude Installations C. Gas ConnectionValve Pressure Taps Ensure adequate ventilationB. IntelliFire Ignition System Wiring A. Wiring RequirementsC. Optional Accessories Requirements 12 Electrical InformationE. Junction Box Installation D. Electrical Service and RepairDrywall gypsum board Plywood 13 FinishingA. Framing and Finishing Instructions Figure 13.3 Finishing Details NON-COMBUSTIBLEBOARD15-7/8IN. TO 16-1/8IN FIREPLACE OPENINGFinish and Sealing Joints Finishing Around Opening with Gypsum WallboardB. Mantel and Wall Projections 0 - 1 inch thickness-OverlapFit Method C. Facing MaterialNon-CombustibleFinish Materials 0 Inches to 4 Inches Thick Inside Fit Method Non-CombustibleFinish MaterialsNon-CombustibleFinish Material 0-4Inches Thick 3/4 INTable 1. Dimensions of Tonic Decorative Front D. Decorative FrontsTable 1. Dimensions of Tonic Decorative Front Inside and Overlap Fit See Section 13.CA. Remove Fixed Glass Assembly 14 Appliance SetupC. Clean the Appliance D. AccessoriesFigure 14.4. Maintaining Media Tray Air Spaces PILOT SHIELD BURNER TRACKSNO GLASS ROCK MEDIA BETWEEN DASHED LINES G. Install the Mesh F. Fixed Glass AssemblyH. Air Shutter Setting Removing Fixed Glass AssemblyA. IntelliFire Ignition System 15 TroubleshootingIntelliFire Ignition System - continued 16 Reference Materials A. Appliance Dimension DiagramLocation InchesEffective Height Length B. Vent Components Diagrams6-1/2in 165 mm6-11/16in B. Vent Components Diagrams continued3-15/16in 169 mm15-1/2IN 394 mm B. Vent Components Diagrams continued7 IN 178 mm 12IN 305mmB. Vent Components Diagrams continued COAXIAL to COLINEAR VENTINGOptional Wire Harness DESCRIPTION9 in B. Vent Components Diagrams12-1/2in 2-3/4inC. Service Parts Service PartsSLR-CCOSMO Stocked#11 Valve Assembly Service PartsSLR-CCOSMO at DepotSLR-CCOSMO Service Partsat Depot StockedNOTICE D. Contact InformationNOTES