Heat & Glo LifeStyle SLR-C (COSMO) owner manual Non-Combustibleboard, 3 Finishing Details

Page 51
NON-COMBUSTIBLE BOARD

WARNING! Risk of Fire! Maintain specified air space clearances to combustibles.

Failure to comply with these instructions may cause a fire or cause the appliance to overheat.

PILOT HOLES (11 LOCATIONS) TO ATTACH

NON-COMBUSTIBLE BOARD TO FRAMING

FACTORY-INSTALLED

NON-COMBUSTIBLE BOARD

LOWER COVER PANEL

=1 INCH. MAX. SELF-TAPPING SCREWS ALLOWED

=NO SCREWS ALLOWED

=5 INCH - 7 INCH SELF-TAPPING SCREWS ALLOWED

Note: It is acceptable to use a silicone sealant with a minimum of 300ºF continuous exposure rating to adhere drywall to lower cover panel.

Figure 13.3 Finishing Details

CAUTION! Risk of Glass Damage and Cuts! DO NOT drill or install any type of screw or fastener into the lower cover panel. Sharp screw or fastener tips may penetrate and break the glass or cause cuts.

Note: Refer to Section 13.C regarding installation details associated with the Inside and Overlap Fit methods.

The SLR-C must be finished using either the Tonic or Martini decorative fronts. See Figures 13.12 and 13.13. The final fireplace installation can be accomplished by either the Overlap Fit or Inside Fit method. Reference Section 13.C regarding installation details associated with the Inside Fit and Overlap Fit methods.

It is acceptable to pre-drill holes and use self-tapped screws in the factory-installed non-combustible board to attach non-combustible backer board for tile, marble, etc. Refer to Figure 13.3 for acceptable screw location and screw length requirements.

Self-tapping screws up to one inch long can be installed through the nailing tab and outer 3 inch edges of the factory-installed non-combustible board to secure the drywall adjacent to the factory-installed non-combustible board. See Figure 13.3.

Do not drill or install screws which may penetrate the lower cover panel as this will restrict required access to the glass, battery-back-up, and remote receiver. See Figure 13.3.

The appliance is designed to accept 1/2 in. wall sheathing materials such as drywall, plywood, wood composites, or non-combustible materials. The type of material used depends whether the installation is an Inside or Overlap Fit Method. Refer to Section 13.C regarding installation details associated with the Inside and Overlap Fit methods

The factory-supplied non-combustible board must be used in all installations. It must be directly attached to structural framing adjacent to the appliance. Screw fas- teners should be installed in the pilot holes provided in the outer perimeter of the non-combustible board. See Figure 13.3.

The factory-supplied board is designed such that its edg- es will be at the approximate center of the adjacent fram- ing, assuming it is 1-1/2 in. nominal thickness. This will allow the wallboard joints to occur on the center of the framing where the panels can be fastened properly. If the framing thickness is less than 1-1/2 in. nominal, such as with formed steel systems, then it may be necessary to adjust the adjacent framing dimensions so that the non- combustible board and wallboard joints are centered on the framing.

Heat & Glo • SLR-C2292-900 Rev. D • 8/12

51

Image 51
Contents Owner’s Manual NOTICEModel SLR-CCOSMO •What to do if you smell gasHomeowner Reference Information A. CongratulationsUser Guide Table of ContentsSafety Alert Key Installer Guide13 Finishing 14 Appliance Setup15 Troubleshooting  = Contains updated informationWARRANTY PERIOD B. Limited Lifetime WarrantyLIMITED LIFETIME WARRANTY WARRANTY COVERAGEThis warranty is void if B. Limited Lifetime Warranty continuedWARRANTY CONDITIONS WARRANTY EXCLUSIONSB. Tempered Glass Specifications D. High Altitude Installations1 Listing and Code Approvals A. Appliance CertificationInstallation of Carbon Monoxide Detectors WARNING! Choking Hazard! Keep glass rock media A. Gas Fireplace Safety2 Operating Instructions User Guide B. Your FireplaceG. Before Lighting Fireplace E. Fixed Glass AssemblyC. Clear Space D. Decorative Doors and FrontsLIGHTING INSTRUCTIONS IPI H. Lighting Instructions IPIFinal inspection by FOR YOUR SAFETY READ BEFORE LIGHTING•Some people may be sensitive to smoke and odors J. Frequently Asked QuestionsI. After Fireplace is Lit Initial Break-inProcedureRemote Control 3 Maintenance and ServiceA. Maintenance Tasks-Homeowner Glass CleaningControl Compartment and Firebox Top B.Maintenance Tasks-QualifiedService TechnicianGasket Seal and Glass Assembly Inspection FireboxWALL SWITCH Getting StartedA. Typical Appliance System Installer GuideB. Design and Installation Considerations C. Tools and Supplies NeededD. Inspect Appliance and Components A. Selecting Appliance Location 5 Framing and ClearancesHeat & Glo • SLR-C• 2292-900Rev. D • 8/12 B. Constructing the Appliance ChaseMINIMUM FRAMING DIMENSIONS C. ClearancesD. Mantel and Wall Projections Figure 5.8 Non-CombustibleZone Heat & Glo • SLR-C• 2292-900Rev. D • 8/123-1/2IN A. Vent Termination Minimum Clearances 6 Termination Locations= AREA WHERE TERMINAL IS NOT PERMITTED Covered Alcove ApplicationsV= VENT TERMINAL X = AIR SUPPLY INLET B. Vent Table Key 7 Vent Information and DiagramsE. Vent Diagrams A. Approved PipeVenting with 1 elbow Top Vent - Horizontal TerminationTop Vent - Horizontal Termination 1. Top Vent - Horizontal Termination - continuedVenting with 2 elbows INSTALLED HORIZONTALLYSLR-C Venting with 3 elbows1. Top Vent - Horizontal Termination - continued Top Vent - Horizontal Termination1. Top Vent - Horizontal Termination - continued INSTALLED HORIZONTALLYINSTALLED HORIZONTALLY H2 H1 V1PILOT HOLES Top Vent - Vertical Termination No ElbowsV1 = 44 ft. Max. 13.4 m Exhaust restrictor InstructionsV1 Minimum Top Vent - Vertical TerminationVenting with 2 elbows SLR-CV1 Minimum Top Vent - Vertical TerminationVenting with 3 elbows SLR-CV1 MIN Venting with 4 elbowsTop Vent - Vertical Termination V3 H2 H1 V1Clearances to Combustibles Coaxial to Colinear VentingPrior to installing the gas appliance TableTOP VENT •Vent this appliance directly outside•Use separate vent system for this appliance •Between ceiling firestops 8 Vent Clearances and FramingA. Pipe Clearances to Combustibles B. Wall Penetration FramingC. Install the Ceiling Firestop D. Install Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation A. Top Vent 9 Appliance Preparation•Insulation backing or plastic B. Securing and Leveling the ApplianceWARNING! Risk of Fire! Prevent contact with •Sagging or loose insulationA. Assemble Vent Sections 10 Installing Vent Pipe SLP PipeB. Assemble Slip Sections C. Secure The Vent SectionsPilot hole D. Disassemble Vent Sections E. Install Decorative Ceiling ComponentsF. Install Metal Roof Flashing G. Assemble and Install Storm CollarCAULK Figure 10.16 Wall Thimble H. Install Vertical Termination CapI. Install Decorative Wall Components FigureFigure 10.17 Venting through the wall K. Install Horizontal Termination Cap11 Gas Information A. Fuel ConversionB. Gas Pressure Ensure adequate ventilation C. Gas ConnectionD. High Altitude Installations Valve Pressure Taps12 Electrical Information A. Wiring RequirementsB. IntelliFire Ignition System Wiring C. Optional Accessories RequirementsE. Junction Box Installation D. Electrical Service and Repair13 Finishing A. Framing and Finishing InstructionsDrywall gypsum board Plywood Figure 13.3 Finishing Details NON-COMBUSTIBLEBOARDFinishing Around Opening with Gypsum Wallboard FIREPLACE OPENING15-7/8IN. TO 16-1/8IN Finish and Sealing JointsB. Mantel and Wall Projections C. Facing Material Non-CombustibleFinish Materials0 - 1 inch thickness-OverlapFit Method 3/4 IN Non-CombustibleFinish Materials0 Inches to 4 Inches Thick Inside Fit Method Non-CombustibleFinish Material 0-4Inches ThickInside and Overlap Fit See Section 13.C D. Decorative FrontsTable 1. Dimensions of Tonic Decorative Front Table 1. Dimensions of Tonic Decorative FrontD. Accessories 14 Appliance SetupA. Remove Fixed Glass Assembly C. Clean the AppliancePILOT SHIELD BURNER TRACKS NO GLASS ROCK MEDIA BETWEEN DASHED LINESFigure 14.4. Maintaining Media Tray Air Spaces Removing Fixed Glass Assembly F. Fixed Glass AssemblyG. Install the Mesh H. Air Shutter SettingA. IntelliFire Ignition System 15 TroubleshootingIntelliFire Ignition System - continued Inches A. Appliance Dimension Diagram16 Reference Materials Location165 mm B. Vent Components DiagramsEffective Height Length 6-1/2in169 mm B. Vent Components Diagrams continued6-11/16in 3-15/16in12IN 305mm B. Vent Components Diagrams continued15-1/2IN 394 mm 7 IN 178 mmDESCRIPTION COAXIAL to COLINEAR VENTINGB. Vent Components Diagrams continued Optional Wire Harness2-3/4in B. Vent Components Diagrams9 in 12-1/2inStocked Service PartsC. Service Parts SLR-CCOSMOat Depot Service Parts#11 Valve Assembly SLR-CCOSMOStocked Service PartsSLR-CCOSMO at DepotD. Contact Information NOTESNOTICE