Heat & Glo LifeStyle SLR-C (COSMO) Slr-Ccosmo, C. Service Parts, Stocked, at Depot

Page 68
Service Parts

Service Parts

SLR-C (COSMO)

C. Service Parts

 

 

 

Landscape Gas Fireplace - DV

Beginning Manufacturing Date: June 2012

 

Ending Manufacturing Date: Active

 

1

 

 

3

 

 

4

 

 

2

 

 

5

 

7

6

 

 

 

 

8

10

 

 

9

IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement

 

Stocked

parts for your appliance please provide model number and serial number. All parts listed

 

in this manual may be ordered from an authorized dealer.

 

 

at Depot

ITEM

DESCRIPTION

COMMENTS

PART NUMBER

 

1

Sheet Rock Ledge

 

2184-147

 

2

Lower Cover Panel

 

2184-103

 

3

Top Panel Finishing Edge

 

2184-102

 

4

Non Combustible Board

 

2198-405

 

5

Base Pan

 

2292-010

 

6

Burner Assembly

 

2292-007

Y

7

Glass Door Assembly

 

GLA-SLR

Y

8

Junction box

 

4021-013

Y

9

Bracket, Junction Box

 

2195-154

 

10

Nailing Tab

Qty 2 req

2198-200

 

Additional service part numbers appear on following page.

 

 

8/12

68

Heat & Glo • SLR-C2292-900 Rev. D • 8/12

Image 68
Contents NOTICE Model SLR-CCOSMO•What to do if you smell gas Owner’s ManualA. Congratulations Homeowner Reference InformationTable of Contents Safety Alert KeyInstaller Guide User Guide14 Appliance Setup 15 Troubleshooting = Contains updated information 13 FinishingB. Limited Lifetime Warranty LIMITED LIFETIME WARRANTYWARRANTY COVERAGE WARRANTY PERIODB. Limited Lifetime Warranty continued WARRANTY CONDITIONSWARRANTY EXCLUSIONS This warranty is void ifD. High Altitude Installations 1 Listing and Code ApprovalsA. Appliance Certification B. Tempered Glass SpecificationsInstallation of Carbon Monoxide Detectors A. Gas Fireplace Safety 2 Operating Instructions User GuideB. Your Fireplace WARNING! Choking Hazard! Keep glass rock mediaE. Fixed Glass Assembly C. Clear SpaceD. Decorative Doors and Fronts G. Before Lighting FireplaceH. Lighting Instructions IPI Final inspection byFOR YOUR SAFETY READ BEFORE LIGHTING LIGHTING INSTRUCTIONS IPIJ. Frequently Asked Questions I. After Fireplace is LitInitial Break-inProcedure •Some people may be sensitive to smoke and odors3 Maintenance and Service A. Maintenance Tasks-HomeownerGlass Cleaning Remote ControlB.Maintenance Tasks-QualifiedService Technician Gasket Seal and Glass Assembly InspectionFirebox Control Compartment and Firebox TopGetting Started A. Typical Appliance SystemInstaller Guide WALL SWITCHD. Inspect Appliance and Components B. Design and Installation ConsiderationsC. Tools and Supplies Needed 5 Framing and Clearances A. Selecting Appliance LocationB. Constructing the Appliance Chase Heat & Glo • SLR-C• 2292-900Rev. D • 8/12C. Clearances MINIMUM FRAMING DIMENSIONSD. Mantel and Wall Projections 3-1/2IN Figure 5.8 Non-CombustibleZoneHeat & Glo • SLR-C• 2292-900Rev. D • 8/12 6 Termination Locations A. Vent Termination Minimum ClearancesV= VENT TERMINAL X = AIR SUPPLY INLET = AREA WHERE TERMINAL IS NOT PERMITTEDCovered Alcove Applications 7 Vent Information and Diagrams E. Vent DiagramsA. Approved Pipe B. Vent Table KeyTop Vent - Horizontal Termination Venting with 1 elbow1. Top Vent - Horizontal Termination - continued Venting with 2 elbowsINSTALLED HORIZONTALLY Top Vent - Horizontal TerminationVenting with 3 elbows 1. Top Vent - Horizontal Termination - continuedTop Vent - Horizontal Termination SLR-CINSTALLED HORIZONTALLY INSTALLED HORIZONTALLYH2 H1 V1 1. Top Vent - Horizontal Termination - continuedTop Vent - Vertical Termination No Elbows V1 = 44 ft. Max. 13.4 mExhaust restrictor Instructions PILOT HOLESTop Vent - Vertical Termination Venting with 2 elbowsSLR-C V1 MinimumTop Vent - Vertical Termination Venting with 3 elbowsSLR-C V1 MinimumVenting with 4 elbows Top Vent - Vertical TerminationV3 H2 H1 V1 V1 MINCoaxial to Colinear Venting Prior to installing the gas applianceTable Clearances to Combustibles•Use separate vent system for this appliance TOP VENT•Vent this appliance directly outside 8 Vent Clearances and Framing A. Pipe Clearances to CombustiblesB. Wall Penetration Framing •Between ceiling firestopsC. Install the Ceiling Firestop Vaulted Ceiling Installation D. Install Attic Insulation ShieldFlat Ceiling Installation 9 Appliance Preparation A. Top VentB. Securing and Leveling the Appliance WARNING! Risk of Fire! Prevent contact with•Sagging or loose insulation •Insulation backing or plastic10 Installing Vent Pipe SLP Pipe A. Assemble Vent SectionsPilot hole B. Assemble Slip SectionsC. Secure The Vent Sections E. Install Decorative Ceiling Components D. Disassemble Vent SectionsCAULK F. Install Metal Roof FlashingG. Assemble and Install Storm Collar H. Install Vertical Termination Cap I. Install Decorative Wall ComponentsFigure Figure 10.16 Wall ThimbleK. Install Horizontal Termination Cap Figure 10.17 Venting through the wallB. Gas Pressure 11 Gas InformationA. Fuel Conversion C. Gas Connection D. High Altitude InstallationsValve Pressure Taps Ensure adequate ventilationA. Wiring Requirements B. IntelliFire Ignition System WiringC. Optional Accessories Requirements 12 Electrical InformationD. Electrical Service and Repair E. Junction Box InstallationDrywall gypsum board Plywood 13 FinishingA. Framing and Finishing Instructions NON-COMBUSTIBLEBOARD Figure 13.3 Finishing DetailsFIREPLACE OPENING 15-7/8IN. TO 16-1/8INFinish and Sealing Joints Finishing Around Opening with Gypsum WallboardB. Mantel and Wall Projections 0 - 1 inch thickness-OverlapFit Method C. Facing MaterialNon-CombustibleFinish Materials Non-CombustibleFinish Materials 0 Inches to 4 Inches Thick Inside Fit MethodNon-CombustibleFinish Material 0-4Inches Thick 3/4 IND. Decorative Fronts Table 1. Dimensions of Tonic Decorative FrontTable 1. Dimensions of Tonic Decorative Front Inside and Overlap Fit See Section 13.C14 Appliance Setup A. Remove Fixed Glass AssemblyC. Clean the Appliance D. AccessoriesFigure 14.4. Maintaining Media Tray Air Spaces PILOT SHIELD BURNER TRACKSNO GLASS ROCK MEDIA BETWEEN DASHED LINES F. Fixed Glass Assembly G. Install the MeshH. Air Shutter Setting Removing Fixed Glass Assembly15 Troubleshooting A. IntelliFire Ignition SystemIntelliFire Ignition System - continued A. Appliance Dimension Diagram 16 Reference MaterialsLocation InchesB. Vent Components Diagrams Effective Height Length6-1/2in 165 mmB. Vent Components Diagrams continued 6-11/16in3-15/16in 169 mmB. Vent Components Diagrams continued 15-1/2IN 394 mm7 IN 178 mm 12IN 305mmCOAXIAL to COLINEAR VENTING B. Vent Components Diagrams continuedOptional Wire Harness DESCRIPTIONB. Vent Components Diagrams 9 in12-1/2in 2-3/4inService Parts C. Service PartsSLR-CCOSMO StockedService Parts #11 Valve AssemblySLR-CCOSMO at DepotService Parts SLR-CCOSMOat Depot StockedNOTICE D. Contact InformationNOTES