1. Top Vent - Horizontal Termination - (continued)
Top Vent - Horizontal Termination
Venting with 3 elbows
V Minimum |
| H1 + H2 + H3 MAXIMUM | |||
| |||||
|
|
|
| ||
3 ft. |
| 914 mm |
| 15 ft. | 4.6 m |
|
|
|
|
|
|
| H1 | + H2 + H3 | MAX. = 15 ft. (4.6 m) |
| |
|
| V1 MAX. = 7 ft (2.1 m) |
|
Note: Use SLP Series components only.
Note: There MUST be a 25% reduction in total H when using flex vent except when using the simple up and out installation (see Figure 7.3).
CAUTION: The
INSTALLED
HORIZONTALLY
H2
H1
V1
H3
INSTALLED
HORIZONTALLY
Figure 7.7