Heat & Glo LifeStyle SLR-C (COSMO) C. Facing Material, Non-CombustibleFinish Materials

Page 54
C. Facing Material

C. Facing Material

Facing and/or finishing materials must not interfere with air flow through louvers, operation of louvers or doors, or access for service.

Facing and/or finishing materials must never overhang into the glass opening.

Observe all clearances when applying combustible materials.

WARNING! Risk of Fire! DO NOT apply combustible materials beyond the minimum clearances. Comply with all minimum clearances to combustibles as specified in this manual. Overlapping materials could ignite and will interfere with proper operation of doors and louvers.

WARNING! Risk of Fire! DO NOT install drywall or other combustible materials over the factory-installednon-com- bustible board. Overlapping materials could ignite.

Decorative facing material thickness is measured from the face of the factory-installed non-combustible board. See Figure 13.9 and Figure 13.11.

Overlap Requirement: See Figure 13.9.

Inside Fit requirement: See Figure 13.10 and Figure 13.11.

1-1/2 IN. ABOVE STANDOFF

FACTORY-INSTALLED

 

NON-COMBUSTIBLE BOARD

NON-COMBUSTIBLE

FINISHING MATERIAL

0 - 1 IN. THICK

TONIC DECORATIVE

FRONT SHOWN

NON-COMBUSTIBLE

FINISHING MATERIAL

0 - 1 IN. THICK

DRYWALL OR

EQUIVALENT (1/2 IN.)

Figure 13.9 Overlap Fit Method (Tonic or Martini Decorative Front)

Non-Combustible Finish Materials

0 - 1 inch thickness-Overlap Fit Method

Both the Tonic and Martini decorative fronts are designed to overlap finish materials 0 inches to 1 inch thick. See Figure 13.9.

NOTICE: This one inch maximum not only includes the decorative finish materials (marble, tile, slate, etc) but also the mortar or adhesive used to attach the decorative finish material.

The non-combustible finish material can be installed up to the fireplace opening.

54

Heat & Glo • SLR-C2292-900 Rev. D • 8/12

Image 54
Contents •What to do if you smell gas NOTICEModel SLR-CCOSMO Owner’s ManualA. Congratulations Homeowner Reference InformationInstaller Guide Table of ContentsSafety Alert Key User Guide = Contains updated information 14 Appliance Setup15 Troubleshooting 13 FinishingWARRANTY COVERAGE B. Limited Lifetime WarrantyLIMITED LIFETIME WARRANTY WARRANTY PERIODWARRANTY EXCLUSIONS B. Limited Lifetime Warranty continuedWARRANTY CONDITIONS This warranty is void ifA. Appliance Certification D. High Altitude Installations1 Listing and Code Approvals B. Tempered Glass SpecificationsInstallation of Carbon Monoxide Detectors B. Your Fireplace A. Gas Fireplace Safety2 Operating Instructions User Guide WARNING! Choking Hazard! Keep glass rock mediaD. Decorative Doors and Fronts E. Fixed Glass AssemblyC. Clear Space G. Before Lighting FireplaceFOR YOUR SAFETY READ BEFORE LIGHTING H. Lighting Instructions IPIFinal inspection by LIGHTING INSTRUCTIONS IPIInitial Break-inProcedure J. Frequently Asked QuestionsI. After Fireplace is Lit •Some people may be sensitive to smoke and odorsGlass Cleaning 3 Maintenance and ServiceA. Maintenance Tasks-Homeowner Remote ControlFirebox B.Maintenance Tasks-QualifiedService TechnicianGasket Seal and Glass Assembly Inspection Control Compartment and Firebox TopInstaller Guide Getting StartedA. Typical Appliance System WALL SWITCHB. Design and Installation Considerations C. Tools and Supplies NeededD. Inspect Appliance and Components 5 Framing and Clearances A. Selecting Appliance LocationB. Constructing the Appliance Chase Heat & Glo • SLR-C• 2292-900Rev. D • 8/12C. Clearances MINIMUM FRAMING DIMENSIONSD. Mantel and Wall Projections Figure 5.8 Non-CombustibleZone Heat & Glo • SLR-C• 2292-900Rev. D • 8/123-1/2IN 6 Termination Locations A. Vent Termination Minimum Clearances= AREA WHERE TERMINAL IS NOT PERMITTED Covered Alcove ApplicationsV= VENT TERMINAL X = AIR SUPPLY INLET A. Approved Pipe 7 Vent Information and DiagramsE. Vent Diagrams B. Vent Table KeyTop Vent - Horizontal Termination Venting with 1 elbowINSTALLED HORIZONTALLY 1. Top Vent - Horizontal Termination - continuedVenting with 2 elbows Top Vent - Horizontal TerminationTop Vent - Horizontal Termination Venting with 3 elbows1. Top Vent - Horizontal Termination - continued SLR-CH2 H1 V1 INSTALLED HORIZONTALLYINSTALLED HORIZONTALLY 1. Top Vent - Horizontal Termination - continuedExhaust restrictor Instructions Top Vent - Vertical Termination No ElbowsV1 = 44 ft. Max. 13.4 m PILOT HOLESSLR-C Top Vent - Vertical TerminationVenting with 2 elbows V1 MinimumSLR-C Top Vent - Vertical TerminationVenting with 3 elbows V1 MinimumV3 H2 H1 V1 Venting with 4 elbowsTop Vent - Vertical Termination V1 MINTable Coaxial to Colinear VentingPrior to installing the gas appliance Clearances to CombustiblesTOP VENT •Vent this appliance directly outside•Use separate vent system for this appliance B. Wall Penetration Framing 8 Vent Clearances and FramingA. Pipe Clearances to Combustibles •Between ceiling firestopsC. Install the Ceiling Firestop D. Install Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation 9 Appliance Preparation A. Top Vent•Sagging or loose insulation B. Securing and Leveling the ApplianceWARNING! Risk of Fire! Prevent contact with •Insulation backing or plastic10 Installing Vent Pipe SLP Pipe A. Assemble Vent SectionsB. Assemble Slip Sections C. Secure The Vent SectionsPilot hole E. Install Decorative Ceiling Components D. Disassemble Vent SectionsF. Install Metal Roof Flashing G. Assemble and Install Storm CollarCAULK Figure H. Install Vertical Termination CapI. Install Decorative Wall Components Figure 10.16 Wall ThimbleK. Install Horizontal Termination Cap Figure 10.17 Venting through the wall11 Gas Information A. Fuel ConversionB. Gas Pressure Valve Pressure Taps C. Gas ConnectionD. High Altitude Installations Ensure adequate ventilationC. Optional Accessories Requirements A. Wiring RequirementsB. IntelliFire Ignition System Wiring 12 Electrical InformationD. Electrical Service and Repair E. Junction Box Installation13 Finishing A. Framing and Finishing InstructionsDrywall gypsum board Plywood NON-COMBUSTIBLEBOARD Figure 13.3 Finishing DetailsFinish and Sealing Joints FIREPLACE OPENING15-7/8IN. TO 16-1/8IN Finishing Around Opening with Gypsum WallboardB. Mantel and Wall Projections C. Facing Material Non-CombustibleFinish Materials0 - 1 inch thickness-OverlapFit Method Non-CombustibleFinish Material 0-4Inches Thick Non-CombustibleFinish Materials0 Inches to 4 Inches Thick Inside Fit Method 3/4 INTable 1. Dimensions of Tonic Decorative Front D. Decorative FrontsTable 1. Dimensions of Tonic Decorative Front Inside and Overlap Fit See Section 13.CC. Clean the Appliance 14 Appliance SetupA. Remove Fixed Glass Assembly D. AccessoriesPILOT SHIELD BURNER TRACKS NO GLASS ROCK MEDIA BETWEEN DASHED LINESFigure 14.4. Maintaining Media Tray Air Spaces H. Air Shutter Setting F. Fixed Glass AssemblyG. Install the Mesh Removing Fixed Glass Assembly15 Troubleshooting A. IntelliFire Ignition SystemIntelliFire Ignition System - continued Location A. Appliance Dimension Diagram16 Reference Materials Inches6-1/2in B. Vent Components DiagramsEffective Height Length 165 mm3-15/16in B. Vent Components Diagrams continued6-11/16in 169 mm7 IN 178 mm B. Vent Components Diagrams continued15-1/2IN 394 mm 12IN 305mmOptional Wire Harness COAXIAL to COLINEAR VENTINGB. Vent Components Diagrams continued DESCRIPTION12-1/2in B. Vent Components Diagrams9 in 2-3/4inSLR-CCOSMO Service PartsC. Service Parts StockedSLR-CCOSMO Service Parts#11 Valve Assembly at Depotat Depot Service PartsSLR-CCOSMO StockedD. Contact Information NOTESNOTICE