Heat & Glo LifeStyle SLR-C (COSMO) Installing Vent Pipe SLP Pipe, A. Assemble Vent Sections

Page 40
10 Installing Vent Pipe (SLP Pipe)

10 Installing Vent Pipe (SLP Pipe)

A. Assemble Vent Sections

To attach the first vent component to the starting collars of the appliance:

Lock the vent components into place by sliding the pipe section onto the collar.

Align the seam of the pipe and seam of collar to allow engagement. Rotate the vent component to lock into place. Use this procedure for all vent components. See Figure 10.1.

Slide the gasket over the first vent section and place it flush to the appliance. This will prevent cold air infiltration. Caulk with a minimum of 300ºF continuous exposure rating may be used to hold the part in place.

Continue adding vent components, locking each succeeding component into place.

Ensure that each succeeding vent component is securely fitted and locked into the preceding component.

Commercial, Multi-family (Multi-level exceeding two sto- ries), or High-Rise Applications

For Installation into a commercial, multi-family (multi-level exceeding two stories) or high-rise applications: All outer pipe joints must be sealed with silicone with a minimum of 300ºF continuous exposure rating, including the slip section that connects directly to the horizontal termina- tion cap.

Apply a bead of silicone sealant inside the female outer pipe joint prior to joining sections. See Figure 10.2

Only outer pipes need to be sealed. All unit collar, pipe, slip section, elbow and cap outer flues shall be sealed in this manner, unless otherwise stated.

WARNING! Risk of Fire or Explosion! DO NOT break silicone seals on slip sections. Use care when removing termination cap from slip pipe. If slip section seals are broken during removal of the termination cap, vent may leak.

Note: Align seams to engage pipe, then rotate counterclockwise to lock

Figure 10.1 Adding Venting Components

Figure 10.2 High Temperature Silicone Sealant

40

Heat & Glo • SLR-C2292-900 Rev. D • 8/12

Image 40
Contents NOTICE Model SLR-CCOSMO•What to do if you smell gas Owner’s ManualA. Congratulations Homeowner Reference InformationTable of Contents Safety Alert KeyInstaller Guide User Guide14 Appliance Setup 15 Troubleshooting = Contains updated information 13 FinishingB. Limited Lifetime Warranty LIMITED LIFETIME WARRANTYWARRANTY COVERAGE WARRANTY PERIODB. Limited Lifetime Warranty continued WARRANTY CONDITIONSWARRANTY EXCLUSIONS This warranty is void ifD. High Altitude Installations 1 Listing and Code ApprovalsA. Appliance Certification B. Tempered Glass SpecificationsInstallation of Carbon Monoxide Detectors A. Gas Fireplace Safety 2 Operating Instructions User GuideB. Your Fireplace WARNING! Choking Hazard! Keep glass rock mediaE. Fixed Glass Assembly C. Clear SpaceD. Decorative Doors and Fronts G. Before Lighting FireplaceH. Lighting Instructions IPI Final inspection byFOR YOUR SAFETY READ BEFORE LIGHTING LIGHTING INSTRUCTIONS IPIJ. Frequently Asked Questions I. After Fireplace is LitInitial Break-inProcedure •Some people may be sensitive to smoke and odors3 Maintenance and Service A. Maintenance Tasks-HomeownerGlass Cleaning Remote ControlB.Maintenance Tasks-QualifiedService Technician Gasket Seal and Glass Assembly InspectionFirebox Control Compartment and Firebox TopGetting Started A. Typical Appliance SystemInstaller Guide WALL SWITCHC. Tools and Supplies Needed B. Design and Installation ConsiderationsD. Inspect Appliance and Components 5 Framing and Clearances A. Selecting Appliance LocationB. Constructing the Appliance Chase Heat & Glo • SLR-C• 2292-900Rev. D • 8/12C. Clearances MINIMUM FRAMING DIMENSIONSD. Mantel and Wall Projections Heat & Glo • SLR-C• 2292-900Rev. D • 8/12 Figure 5.8 Non-CombustibleZone3-1/2IN 6 Termination Locations A. Vent Termination Minimum ClearancesCovered Alcove Applications = AREA WHERE TERMINAL IS NOT PERMITTEDV= VENT TERMINAL X = AIR SUPPLY INLET 7 Vent Information and Diagrams E. Vent DiagramsA. Approved Pipe B. Vent Table KeyTop Vent - Horizontal Termination Venting with 1 elbow1. Top Vent - Horizontal Termination - continued Venting with 2 elbowsINSTALLED HORIZONTALLY Top Vent - Horizontal TerminationVenting with 3 elbows 1. Top Vent - Horizontal Termination - continuedTop Vent - Horizontal Termination SLR-CINSTALLED HORIZONTALLY INSTALLED HORIZONTALLYH2 H1 V1 1. Top Vent - Horizontal Termination - continuedTop Vent - Vertical Termination No Elbows V1 = 44 ft. Max. 13.4 mExhaust restrictor Instructions PILOT HOLESTop Vent - Vertical Termination Venting with 2 elbowsSLR-C V1 MinimumTop Vent - Vertical Termination Venting with 3 elbowsSLR-C V1 MinimumVenting with 4 elbows Top Vent - Vertical TerminationV3 H2 H1 V1 V1 MINCoaxial to Colinear Venting Prior to installing the gas applianceTable Clearances to Combustibles•Vent this appliance directly outside TOP VENT•Use separate vent system for this appliance 8 Vent Clearances and Framing A. Pipe Clearances to CombustiblesB. Wall Penetration Framing •Between ceiling firestopsC. Install the Ceiling Firestop Flat Ceiling Installation D. Install Attic Insulation ShieldVaulted Ceiling Installation 9 Appliance Preparation A. Top VentB. Securing and Leveling the Appliance WARNING! Risk of Fire! Prevent contact with•Sagging or loose insulation •Insulation backing or plastic10 Installing Vent Pipe SLP Pipe A. Assemble Vent SectionsC. Secure The Vent Sections B. Assemble Slip SectionsPilot hole E. Install Decorative Ceiling Components D. Disassemble Vent SectionsG. Assemble and Install Storm Collar F. Install Metal Roof FlashingCAULK H. Install Vertical Termination Cap I. Install Decorative Wall ComponentsFigure Figure 10.16 Wall ThimbleK. Install Horizontal Termination Cap Figure 10.17 Venting through the wallA. Fuel Conversion 11 Gas InformationB. Gas Pressure C. Gas Connection D. High Altitude InstallationsValve Pressure Taps Ensure adequate ventilationA. Wiring Requirements B. IntelliFire Ignition System WiringC. Optional Accessories Requirements 12 Electrical InformationD. Electrical Service and Repair E. Junction Box InstallationA. Framing and Finishing Instructions 13 FinishingDrywall gypsum board Plywood NON-COMBUSTIBLEBOARD Figure 13.3 Finishing DetailsFIREPLACE OPENING 15-7/8IN. TO 16-1/8INFinish and Sealing Joints Finishing Around Opening with Gypsum WallboardB. Mantel and Wall Projections Non-CombustibleFinish Materials C. Facing Material0 - 1 inch thickness-OverlapFit Method Non-CombustibleFinish Materials 0 Inches to 4 Inches Thick Inside Fit MethodNon-CombustibleFinish Material 0-4Inches Thick 3/4 IND. Decorative Fronts Table 1. Dimensions of Tonic Decorative FrontTable 1. Dimensions of Tonic Decorative Front Inside and Overlap Fit See Section 13.C14 Appliance Setup A. Remove Fixed Glass AssemblyC. Clean the Appliance D. AccessoriesNO GLASS ROCK MEDIA BETWEEN DASHED LINES PILOT SHIELD BURNER TRACKSFigure 14.4. Maintaining Media Tray Air Spaces F. Fixed Glass Assembly G. Install the MeshH. Air Shutter Setting Removing Fixed Glass Assembly15 Troubleshooting A. IntelliFire Ignition SystemIntelliFire Ignition System - continued A. Appliance Dimension Diagram 16 Reference MaterialsLocation InchesB. Vent Components Diagrams Effective Height Length6-1/2in 165 mmB. Vent Components Diagrams continued 6-11/16in3-15/16in 169 mmB. Vent Components Diagrams continued 15-1/2IN 394 mm7 IN 178 mm 12IN 305mmCOAXIAL to COLINEAR VENTING B. Vent Components Diagrams continuedOptional Wire Harness DESCRIPTIONB. Vent Components Diagrams 9 in12-1/2in 2-3/4inService Parts C. Service PartsSLR-CCOSMO StockedService Parts #11 Valve AssemblySLR-CCOSMO at DepotService Parts SLR-CCOSMOat Depot StockedNOTES D. Contact InformationNOTICE