Heat & Glo LifeStyle 6000GCF-IPILP Vent Information and Diagrams, Vent Table Key, Use of Elbows

Page 12

5 Vent Information and Diagrams

A. Vent Table Key

The abbreviations listed in this vent table key are used in the vent diagrams.

Symbol

Description

V1

First section (closest to appliance) of vertical length

 

 

V2

Second section of vertical length

 

 

H1

First section (closest to appliance) of horizontal length

 

 

H2

Second section of horizontal length

 

 

WARNING

Fire Hazard. Explosion Risk. Asphyxiation Risk.

Do NOT connect this gas appliance to a chimney flue serving a separate solid-fuel or gas burning appliance.

• Vent this appliance directly outside.

• Use separate vent system for this appliance.

May impair safe operation of this appliance or other appliances connected to the flue.

B. Use of Elbows

CAUTION

ALL vent configuration specifications MUST be followed.

This product is tested and listed to these specifications.

Appliance performance will suffer if specifications are not followed.

Diagonal runs have both vertical and horizontal vent as- pects when calculating the effects. Use the rise for the vertical aspect and the run for the horizontal aspect (see Figure 5.1).

Two 45º elbows may be used in place of one 90º elbow. On 45º runs, one foot of diagonal is equal to 8.5 inches hori- zontal run and 8.5 inches vertical run. A length of straight pipe is allowed between two 45º elbows (see Figure 5.1).

Verticalin. 1/2-8

8-1/2 in.

Horizontal

Figure 5.1

C. Measuring Standards

Vertical and horizontal measurements listed in the vent diagrams were made using the following standards.

1.Pipe measurements are shown using the effective length of pipe (see Figure 5.2).

2.Measurements are made from the appliance outer wrap, not from the standoffs.

3.Horizontal terminations are measured to the outside mounting surface (flange of termination cap) (see Figure 4.1).

4.Vertical terminations are measured to bottom of termi- nation cap.

5.Horizontal pipe installed level with no rise.

 

Pipe

Effective Length

 

Inches

Millimeters

 

 

 

DVP4

4

102

 

DVP6

6

152

Effective

DVP12

12

305

Height/Length

DVP24

24

610

 

 

DVP36

36

914

 

DVP48

48

1219

 

DVP6A

3 to 6

76 to 152

 

DVP12A

3 to 12

76 to 305

 

DVP12MI

3 to 12

76 to 305

 

DVP24MI

3 to 24

76 to 610

Figure 5.2 DVP Pipe Effective Length

 

 

12

Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP2110-900 Rev. F • 6/08

Image 12
Contents Models 6000GCF-IPI6000GCF-IPILP Hot glass will cause burnsCongratulations Homeowner Reference InformationTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGetting Started Tools and Supplies NeededFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel Projections In. MINFt. MAX Termination Locations Vent Termination Minimum ClearancesSee .4 for specific clearances Alcove Applications Vent Information and Diagrams Vent Table KeyUse of Elbows Measuring StandardsVent Diagrams Top Vent Horizontal Termination One ElbowTwo Elbows Minimum MaximumTop Vent Horizontal Termination Three Elbows H1 Maximum V1 + Minimum Top Vent Vertical Termination Three Elbows H1+ H2 V1+ V2 Minimum H1+ H2 MaximumVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationNon-Combustible Wall Penetration Installing the Ceiling Firestop Installing Attic ShieldVertical Penetration Framing Temporary Access Panel Appliance PreparationAttaching Sheetrock Ledges Installing the Flue Restrictor Securing and Leveling the ApplianceInstalling the Fiberglass Gasket Vertical Top VentInstalling Vent Pipe Assembly of Vent SectionsAttaching Vent to the Firebox Assembly Assembling Pipe SectionsAssembling Minimum Installations MI Sections Assembling DVP-12A Slip SectionsDisassembly of Vent Sections Securing the Vent Sections Vertical SectionsHorizontal Sections Installing Heat Shield and Horizontal Termination Cap Installing the Horizontal Termination CapHeat Shield Requirements for Horizontal Termination Installing Roof Flashing and Vertical Termination Cap Roof Pitch Min. FtAssembling and Installing Storm Collar 17 Assembling the Storm Collar Around the PipeGas Information Fuel Conversions Gas ConnectionGas Pressures Pressure Natural Gas PropaneHigh Altitude Installations Recommendation for Wire Wall SwitchOptional Accessories Requirements Electrical InformationIntellifire Pilot Ignition IPI Wiring Diagram Junction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialAppliance Setup Clean the ApplianceAccessories Remove Shipping MaterialsInstall the Refractory Ember PlacementPlacing the Ember Material Positioning the Logs Log #1 SRV2103-10712 Front View Glass Assembly Air Shutter SettingScreen Mesh Grilles and TrimOperating Instructions Before Lighting ApplianceTurn off all electric power to the appliance On position. The ON/OFF switch mayLighting Appliance IPI Ignition Final inspection byFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Intellifire Ignition SystemSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Doors, SurroundsAppliance Dimension Diagram Reference MaterialsLocation Inches Millimeters Vent Components Diagrams DVP vent componentsHorizontal Termination Cap Wall Shield FirestopHeat Shield Horizontal Termination Cap KitExtended Heat Shield Not for use on these modelsDVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP Service Parts Log Set Assembly Part number list on followingService Parts List StockedAt Depot IPI Valve Assembly 6000GCF-IPILimited Lifetime Warranty Limited Lifetime Warranty Heat & GLO GAS Appliance ProductsContact Information Do not Discard this Manual