Heat & Glo LifeStyle 6000GCF-IPILP Installing Heat Shield and Horizontal Termination Cap

Page 26

C. Installing Heat Shield and Horizontal Termination Cap

WARNING

Fire Hazard

Impaired performance of appliance

Telescoping flue section of termination cap MUST be used when connecting pipe section to termination cap.

Maintain a 1-1/2 inch minimum overlap on telescoping flue section of termination cap.

Installing the Horizontal Termination Cap

Vent termination must not be recessed in the wall. Siding may be brought to the edge of the cap base.

Flash and seal as appropriate for siding material at outside edges of cap.

When installing a horizontal termination cap, follow the cap location guidelines as prescribed by current ANSI Z223.1 and CAN/CGA-B149installation codes.

WARNING

Fire Risk

Exhaust Fumes Risk

Impaired Performance of Appliance

Overlap pipe slip sections at least 1-1/2 inches.

Use pilot holes for screws.

Screws must not exceed 1 inch long.

Pipe may separate if not properly joined.

Heat Shield Requirements for Horizontal Termination

For all horizontally vented appliances, a heat shield MUST be placed one inch above the top of the vent between the wall shield firestop and the base of the termination cap.

There are two sections of the heat shield. One section is factory-attached to the wall shield firestop. The other section is factory-attached to the cap. See Figure 8.12.

If the wall thickness does not allow the required 1-1/2 inch (38 mm) heat shield overlap when installed, an extended

WARNING

Burn Risk

• Local codes may require installation of a cap shield to prevent anything or anyone from touching the hot cap.

Note: Where required, an exterior wall flashing is available. When penetrating a brick wall, a brick extension kit is available for framing the brick.

 

HEAT SHIELD OR

HEAT SHIELD

 

EXTENDED

 

1-1/2 IN. (38 MM) MIN.

 

HEAT SHIELD

WALL SHIELD

OVERLAP

 

 

 

FIRESTOP

 

 

SLIP SECTION

CAN BE EXTENDED

heat shield (DVP-HSM-B) must be used.

INNER VENT

OUTER VENT

SHEATHING

Important Notice: Heat shields may not be field constructed.

The extended heat shield (DVP-HSM-B) may need to be cut to length. You will attach the cut heat shield to the existing cap heat shield or wall shield firestop heat shield (refer to Figure 8.12) using the supplied screws. You MUST maintain a 1-1/2 in. (38 mm) overlap of the extended heat shield and the existing shields (both ends of the heat shield). The small leg on the extended heat shield should rest on the top of the vent (pipe section) to properly space it from the pipe section.

INTERIOR

EXTERIOR

VENT DEPTH FROM BACK OF APPLIANCE TO

OUTSIDE SURFACE OF EXTERIOR WALL

(SEE CHART BELOW)

Figure 8.12 Venting through the Wall

Termination Cap Specification Chart (depth without using additional pipe sections)

 

DVP-TRAPK1

DVP-TRAP1

DVP-TRAPK2

DVP-TRAP2

 

Top Vent

Rear Vent

Top Vent

Rear Vent

 

Depth

Depth

Depth

Depth

 

4-1/8 in. to

NA

6-5/8 in. to

NA

 

6 in.

10-5/8 in.

 

 

 

6000GCF

 

 

 

 

 

DVP-HPC1

DVP-HPC1

DVP-HPC2

DVP-HPC2

 

Top Vent

Rear Vent

Top Vent

Rear Vent

 

Depth

Depth

Depth

Depth

 

4-1/8 in. to

NA

6-1/8 in. to

NA

 

6-1/4 in.

10-1/4 in.

 

 

 

DVP-TRAP1 can adjust 1-7/8 in. (4-3/16 to 6-1/16)

DVP-TRAP2 can adjust 4 in. (6-9/16 to 10-9/16)

DVP-HPC1 can adjust 2-1/8 in. (4-1/4 to 6-3/8)

DVP-HPC2 can adjust 4-1/8 in. (6-3/8 to 10-1/2)

26

Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP2110-900 Rev. F • 6/08

Image 26
Contents Models 6000GCF-IPI6000GCF-IPILP Hot glass will cause burnsCongratulations Homeowner Reference InformationTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGetting Started Tools and Supplies NeededFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesFt. MAX Mantel ProjectionsIn. MIN See .4 for specific clearances Termination LocationsVent Termination Minimum Clearances Alcove Applications Use of Elbows Vent Information and DiagramsVent Table Key Measuring StandardsTwo Elbows Vent DiagramsTop Vent Horizontal Termination One Elbow Minimum MaximumTop Vent Horizontal Termination Three Elbows H1 Maximum V1 + Minimum Top Vent Vertical Termination Three Elbows H1+ H2 V1+ V2 Minimum H1+ H2 MaximumVent Clearances and Framing Pipe Clearances to CombustiblesNon-Combustible Wall Penetration Wall Penetration FramingCombustible Wall Penetration Vertical Penetration Framing Installing the Ceiling FirestopInstalling Attic Shield Attaching Sheetrock Ledges Temporary Access PanelAppliance Preparation Installing the Flue Restrictor Securing and Leveling the ApplianceInstalling the Fiberglass Gasket Vertical Top VentAttaching Vent to the Firebox Assembly Installing Vent PipeAssembly of Vent Sections Assembling Pipe SectionsAssembling Minimum Installations MI Sections Assembling DVP-12A Slip SectionsHorizontal Sections Disassembly of Vent SectionsSecuring the Vent Sections Vertical Sections Heat Shield Requirements for Horizontal Termination Installing Heat Shield and Horizontal Termination CapInstalling the Horizontal Termination Cap Installing Roof Flashing and Vertical Termination Cap Roof Pitch Min. FtAssembling and Installing Storm Collar 17 Assembling the Storm Collar Around the PipeGas Pressures Gas InformationFuel Conversions Gas Connection Pressure Natural Gas PropaneHigh Altitude Installations Optional Accessories Requirements Recommendation for WireWall Switch Electrical InformationIntellifire Pilot Ignition IPI Wiring Diagram Junction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialAccessories Appliance SetupClean the Appliance Remove Shipping MaterialsPlacing the Ember Material Install the RefractoryEmber Placement Positioning the Logs Log #1 SRV2103-10712 Front View Screen Mesh Glass AssemblyAir Shutter Setting Grilles and TrimOperating Instructions Before Lighting ApplianceLighting Appliance IPI Ignition Turn off all electric power to the applianceOn position. The ON/OFF switch may Final inspection byAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Sympton Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Doors, SurroundsLocation Inches Millimeters Appliance Dimension DiagramReference Materials Vent Components Diagrams DVP vent componentsHeat Shield Horizontal Termination CapWall Shield Firestop Horizontal Termination Cap KitExtended Heat Shield Not for use on these modelsDVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP Service Parts Log Set Assembly Part number list on followingAt Depot Service Parts ListStocked IPI Valve Assembly 6000GCF-IPILimited Lifetime Warranty Limited Lifetime Warranty Heat & GLO GAS Appliance ProductsContact Information Do not Discard this Manual