Heat & Glo LifeStyle 6000GCF-IPILP owner manual Top Vent Horizontal Termination Three Elbows

Page 14

1. Top Vent - Horizontal Termination

- (continued)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Three Elbows

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V1 Minimum

H1 Maximum

V2 Minimum

H2 Maximum

V1 + V2 Minimum

H1 + H2 Maximum

6 in.

152 mm

3 ft

914 mm

1 ft

 

305 mm

3 ft

914 mm

1-1/2 ft

457 mm

6 ft

1.8 m

1 ft

305 mm

3 ft

914 mm

1 ft

 

305 mm

3 ft

914 mm

2 ft

607 mm

6 ft

1.8 m

 

 

 

 

 

 

 

 

 

 

 

 

 

2 ft

610 mm

6 ft

1.8 m

2 ft

 

610 mm

6 ft

1.8 m

4 ft

1.4 m

12 ft

3.7 m

3 ft

914 mm

9 ft

2.7 m

3 ft

 

914 mm

9 ft

2.7 m

6 ft

1.8 m

18 ft

5.5 m

 

H1 + H2 = 20 ft (6.1 m) Max.

V1 + V2 + H1 + H2 = 50 ft (15.2 m) Max.

V1 = 6 inches (152 mm) Min.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

H2

V2

H1V1

Figure 5.5

14

Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP2110-900 Rev. F • 6/08

Image 14
Contents Models 6000GCF-IPI6000GCF-IPILP Hot glass will cause burnsCongratulations Homeowner Reference InformationTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGetting Started Tools and Supplies NeededFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesFt. MAX Mantel ProjectionsIn. MIN See .4 for specific clearances Termination LocationsVent Termination Minimum Clearances Alcove Applications Use of Elbows Vent Information and DiagramsVent Table Key Measuring StandardsTwo Elbows Vent DiagramsTop Vent Horizontal Termination One Elbow Minimum MaximumTop Vent Horizontal Termination Three Elbows H1 Maximum V1 + Minimum Top Vent Vertical Termination Three Elbows H1+ H2 V1+ V2 Minimum H1+ H2 MaximumVent Clearances and Framing Pipe Clearances to CombustiblesNon-Combustible Wall Penetration Wall Penetration FramingCombustible Wall Penetration Vertical Penetration Framing Installing the Ceiling FirestopInstalling Attic Shield Attaching Sheetrock Ledges Temporary Access PanelAppliance Preparation Installing the Flue Restrictor Securing and Leveling the ApplianceInstalling the Fiberglass Gasket Vertical Top VentAttaching Vent to the Firebox Assembly Installing Vent PipeAssembly of Vent Sections Assembling Pipe SectionsAssembling Minimum Installations MI Sections Assembling DVP-12A Slip SectionsHorizontal Sections Disassembly of Vent SectionsSecuring the Vent Sections Vertical Sections Heat Shield Requirements for Horizontal Termination Installing Heat Shield and Horizontal Termination CapInstalling the Horizontal Termination Cap Installing Roof Flashing and Vertical Termination Cap Roof Pitch Min. FtAssembling and Installing Storm Collar 17 Assembling the Storm Collar Around the PipeGas Pressures Gas InformationFuel Conversions Gas Connection Pressure Natural Gas PropaneHigh Altitude Installations Optional Accessories Requirements Recommendation for WireWall Switch Electrical InformationIntellifire Pilot Ignition IPI Wiring Diagram Junction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialAccessories Appliance SetupClean the Appliance Remove Shipping MaterialsPlacing the Ember Material Install the RefractoryEmber Placement Positioning the Logs Log #1 SRV2103-10712 Front View Screen Mesh Glass AssemblyAir Shutter Setting Grilles and TrimOperating Instructions Before Lighting ApplianceLighting Appliance IPI Ignition Turn off all electric power to the applianceOn position. The ON/OFF switch may Final inspection byAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Sympton Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Doors, SurroundsLocation Inches Millimeters Appliance Dimension DiagramReference Materials Vent Components Diagrams DVP vent componentsHeat Shield Horizontal Termination CapWall Shield Firestop Horizontal Termination Cap KitExtended Heat Shield Not for use on these modelsDVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP Service Parts Log Set Assembly Part number list on followingAt Depot Service Parts ListStocked IPI Valve Assembly 6000GCF-IPILimited Lifetime Warranty Limited Lifetime Warranty Heat & GLO GAS Appliance ProductsContact Information Do not Discard this Manual