3 Framing and Clearances

Note:

Illustrations reflect typical installations and are FOR DESIGN PURPOSES ONLY.

Illustrations/diagrams are not drawn to scale.

Actual installation may vary due to individual design preference.

A.Selecting Appliance Location

When selecting a location for your appliance it is important to consider the required clearances to walls (see figure 3.1).

WARNING

Fire Risk

Provide adequate clearance:

Around air openings

To combustibles

• For service access

Locate appliance away from traffic areas.

NOTE: For actual appliance dimensions refer to Sec- tion 16.

B

I

A

A

D

F

 

E

(MINIMUM)

C

In addition to these framing dimensions, also reference the following sections:

Clearances and Mantel Projections (Sections 3.C and 3.D)

Vent Clearances and Framing (Section 6).

G

H

 

A

B

C

D

E

F

G

H

I

Inches

51

1/2

72

42

1

See Section D

42

22

16

Millimeters

1295

13

1829

1067

25

Mantel Projections

1067

559

406

Figure 3.1 Appliance Locations

Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP2110-900 Rev. F • 6/08

7

Image 7
Contents Hot glass will cause burns Models 6000GCF-IPI6000GCF-IPILPHomeowner Reference Information CongratulationsTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsTools and Supplies Needed Getting StartedSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseIn. MIN Mantel ProjectionsFt. MAX Vent Termination Minimum Clearances Termination LocationsSee .4 for specific clearances Alcove Applications Measuring Standards Vent Information and DiagramsVent Table Key Use of ElbowsMinimum Maximum Vent DiagramsTop Vent Horizontal Termination One Elbow Two ElbowsTop Vent Horizontal Termination Three Elbows H1 Maximum V1 + Minimum H1+ H2 V1+ V2 Minimum H1+ H2 Maximum Top Vent Vertical Termination Three ElbowsPipe Clearances to Combustibles Vent Clearances and FramingCombustible Wall Penetration Wall Penetration FramingNon-Combustible Wall Penetration Installing Attic Shield Installing the Ceiling FirestopVertical Penetration Framing Appliance Preparation Temporary Access PanelAttaching Sheetrock Ledges Securing and Leveling the Appliance Installing the Flue RestrictorVertical Top Vent Installing the Fiberglass GasketAssembling Pipe Sections Installing Vent PipeAssembly of Vent Sections Attaching Vent to the Firebox AssemblyAssembling DVP-12A Slip Sections Assembling Minimum Installations MI SectionsSecuring the Vent Sections Vertical Sections Disassembly of Vent SectionsHorizontal Sections Installing the Horizontal Termination Cap Installing Heat Shield and Horizontal Termination CapHeat Shield Requirements for Horizontal Termination Roof Pitch Min. Ft Installing Roof Flashing and Vertical Termination Cap17 Assembling the Storm Collar Around the Pipe Assembling and Installing Storm CollarPressure Natural Gas Propane Gas InformationFuel Conversions Gas Connection Gas PressuresHigh Altitude Installations Electrical Information Recommendation for WireWall Switch Optional Accessories RequirementsIntellifire Pilot Ignition IPI Wiring Diagram Wall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingRemove Shipping Materials Appliance SetupClean the Appliance AccessoriesEmber Placement Install the RefractoryPlacing the Ember Material Log #1 SRV2103-107 Positioning the Logs12 Front View Grilles and Trim Glass AssemblyAir Shutter Setting Screen MeshBefore Lighting Appliance Operating InstructionsFinal inspection by Turn off all electric power to the applianceOn position. The ON/OFF switch may Lighting Appliance IPI IgnitionInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Intellifire Ignition System TroubleshootingSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksDoors, Surrounds Inspect Maintenance TasksReference Materials Appliance Dimension DiagramLocation Inches Millimeters DVP vent components Vent Components DiagramsHorizontal Termination Cap Kit Horizontal Termination CapWall Shield Firestop Heat ShieldNot for use on these models Extended Heat ShieldDVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP Log Set Assembly Part number list on following Service PartsStocked Service Parts ListAt Depot 6000GCF-IPI IPI Valve AssemblyLimited Lifetime Warranty Heat & GLO GAS Appliance Products Limited Lifetime WarrantyDo not Discard this Manual Contact Information