Heat & Glo LifeStyle 6000GCF-IPILP Installing the Fiberglass Gasket, Vertical Top Vent

Page 22

2.Match the amount of vertical in the system with the chart to find the appropriate position to set the Flue Restrictor (see Figure 7.7).

- CHART -

Vertical

Top Vent

Top Vent

NG

LP

 

4’

1-1

No Restrictor

 

 

 

8’

2-2

1-2

 

 

 

15’

3-3

3-2

20’

3-4

3-3

25’

3-4

3-3

 

 

 

30’

4-4

3-4

35’

4-4

3-4

40’

5-4

4-4

 

 

 

45’

5-4

4-4

 

 

 

50’

5-4

4-4

Figure 7.7

3. Center the Flue Restrictor on vent and secure in place by using two self-tapping screws (see Figure 7.8).

1 2 3 4 5

SETTING

1 2 3 4 5

Figure 7.8

E. Installing the Fiberglass Gasket

The fiberglass gasket supplied in the manual bag seals between the first 8 inch (203 mm) vent component and the outer fireplace wrap. Using 2 self-tapping screws from the manual bag secure the gasket to the outer wrap (see Figure 7.9).

FIRST VENT

COMPONENT

FIBERGLASS

GASKET

OUTERWRAP

Figure 7.9 Fiberglass Gasket

22

Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP2110-900 Rev. F • 6/08

Image 22
Contents Models 6000GCF-IPI6000GCF-IPILP Hot glass will cause burnsCongratulations Homeowner Reference InformationTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGetting Started Tools and Supplies NeededFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesIn. MIN Mantel ProjectionsFt. MAX Vent Termination Minimum Clearances Termination LocationsSee .4 for specific clearances Alcove Applications Use of Elbows Vent Information and DiagramsVent Table Key Measuring StandardsTwo Elbows Vent DiagramsTop Vent Horizontal Termination One Elbow Minimum MaximumTop Vent Horizontal Termination Three Elbows H1 Maximum V1 + Minimum Top Vent Vertical Termination Three Elbows H1+ H2 V1+ V2 Minimum H1+ H2 MaximumVent Clearances and Framing Pipe Clearances to CombustiblesCombustible Wall Penetration Wall Penetration FramingNon-Combustible Wall Penetration Installing Attic Shield Installing the Ceiling FirestopVertical Penetration Framing Appliance Preparation Temporary Access PanelAttaching Sheetrock Ledges Installing the Flue Restrictor Securing and Leveling the ApplianceInstalling the Fiberglass Gasket Vertical Top VentAttaching Vent to the Firebox Assembly Installing Vent PipeAssembly of Vent Sections Assembling Pipe SectionsAssembling Minimum Installations MI Sections Assembling DVP-12A Slip SectionsSecuring the Vent Sections Vertical Sections Disassembly of Vent SectionsHorizontal Sections Installing the Horizontal Termination Cap Installing Heat Shield and Horizontal Termination CapHeat Shield Requirements for Horizontal Termination Installing Roof Flashing and Vertical Termination Cap Roof Pitch Min. FtAssembling and Installing Storm Collar 17 Assembling the Storm Collar Around the PipeGas Pressures Gas InformationFuel Conversions Gas Connection Pressure Natural Gas PropaneHigh Altitude Installations Optional Accessories Requirements Recommendation for WireWall Switch Electrical InformationIntellifire Pilot Ignition IPI Wiring Diagram Junction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialAccessories Appliance SetupClean the Appliance Remove Shipping MaterialsEmber Placement Install the RefractoryPlacing the Ember Material Positioning the Logs Log #1 SRV2103-10712 Front View Screen Mesh Glass AssemblyAir Shutter Setting Grilles and TrimOperating Instructions Before Lighting ApplianceLighting Appliance IPI Ignition Turn off all electric power to the applianceOn position. The ON/OFF switch may Final inspection byInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Intellifire Ignition System TroubleshootingSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Doors, SurroundsReference Materials Appliance Dimension DiagramLocation Inches Millimeters Vent Components Diagrams DVP vent componentsHeat Shield Horizontal Termination CapWall Shield Firestop Horizontal Termination Cap KitExtended Heat Shield Not for use on these modelsDVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP Service Parts Log Set Assembly Part number list on followingStocked Service Parts ListAt Depot IPI Valve Assembly 6000GCF-IPILimited Lifetime Warranty Limited Lifetime Warranty Heat & GLO GAS Appliance ProductsContact Information Do not Discard this Manual