Heat & Glo LifeStyle 6000GCF-IPI Horizontal Termination Cap, Wall Shield Firestop, Heat Shield

Page 49

B. Vent Components Diagrams (continued)

Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm). The heat shield is designed to be used on a wall 4 in. to 7-1/4 in. (102 mm to 184 mm) thick. If wall thickness is less than 4 in. (102 mm) the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mm) a DVP-HSM-B will be required.

8in.

(203 mm)

Heat

Shield

15-1/8 in.

(384 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Term Cap

 

Minimum

Maximum

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12 in.

 

 

 

 

 

Max

 

Effective Length

Effective Length

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(305 mm)

 

Effective

 

 

4-1/8 in.

5-5/8 in.

 

 

 

 

 

 

 

 

 

 

 

Length

Trap1

 

 

 

 

 

 

 

 

DVP-TRAP

 

 

105 mm

143 mm

 

 

 

 

 

 

 

 

 

 

 

 

 

Horizontal Termination Cap

 

 

 

 

Trap2

 

6-3/4 in.

10-5/8 in.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

171 mm

270 mm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Wall Shield Firestop

DVP-TRAP1

 

 

Wall Shield Firestop

HSM

DVP-TRAP2

 

 

 

 

 

 

Heat Shield

Heat Shield

DVP-TRAP1

DVP-TRAP2

Horizontal Termination Cap Kit

Horizontal Termination Cap Kit

 

(Shown with optional extended heat shield)

 

Wall Shield Firestop

DVP-TRAP1

Wall Shield Firestop

DVP-TRAP2

DVP90ST

Heat Shield

 

DVP90ST

HSM

 

 

Heat Shield

 

DVP-TRAPK1

DVP-TRAPK2

Horizontal Termination Cap Kit

Horizontal Termination Cap Kit

Figure 16.3 DVP vent components

Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP2110-900 Rev. F • 6/08

49

Image 49
Contents Hot glass will cause burns Models 6000GCF-IPI6000GCF-IPILPHomeowner Reference Information CongratulationsTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsTools and Supplies Needed Getting StartedSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseIn. MIN Mantel ProjectionsFt. MAX Vent Termination Minimum Clearances Termination LocationsSee .4 for specific clearances Alcove Applications Vent Table Key Vent Information and DiagramsUse of Elbows Measuring StandardsTop Vent Horizontal Termination One Elbow Vent DiagramsTwo Elbows Minimum MaximumTop Vent Horizontal Termination Three Elbows H1 Maximum V1 + Minimum H1+ H2 V1+ V2 Minimum H1+ H2 Maximum Top Vent Vertical Termination Three ElbowsPipe Clearances to Combustibles Vent Clearances and FramingCombustible Wall Penetration Wall Penetration FramingNon-Combustible Wall Penetration Installing Attic Shield Installing the Ceiling FirestopVertical Penetration Framing Appliance Preparation Temporary Access PanelAttaching Sheetrock Ledges Securing and Leveling the Appliance Installing the Flue RestrictorVertical Top Vent Installing the Fiberglass GasketAssembly of Vent Sections Installing Vent PipeAttaching Vent to the Firebox Assembly Assembling Pipe SectionsAssembling DVP-12A Slip Sections Assembling Minimum Installations MI SectionsSecuring the Vent Sections Vertical Sections Disassembly of Vent SectionsHorizontal Sections Installing the Horizontal Termination Cap Installing Heat Shield and Horizontal Termination CapHeat Shield Requirements for Horizontal Termination Roof Pitch Min. Ft Installing Roof Flashing and Vertical Termination Cap17 Assembling the Storm Collar Around the Pipe Assembling and Installing Storm CollarFuel Conversions Gas Connection Gas InformationGas Pressures Pressure Natural Gas PropaneHigh Altitude Installations Wall Switch Recommendation for WireOptional Accessories Requirements Electrical InformationIntellifire Pilot Ignition IPI Wiring Diagram Wall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingClean the Appliance Appliance SetupAccessories Remove Shipping MaterialsEmber Placement Install the RefractoryPlacing the Ember Material Log #1 SRV2103-107 Positioning the Logs12 Front View Air Shutter Setting Glass AssemblyScreen Mesh Grilles and TrimBefore Lighting Appliance Operating InstructionsOn position. The ON/OFF switch may Turn off all electric power to the applianceLighting Appliance IPI Ignition Final inspection byInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Intellifire Ignition System TroubleshootingSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksDoors, Surrounds Inspect Maintenance TasksReference Materials Appliance Dimension DiagramLocation Inches Millimeters DVP vent components Vent Components DiagramsWall Shield Firestop Horizontal Termination CapHeat Shield Horizontal Termination Cap KitNot for use on these models Extended Heat ShieldDVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP Log Set Assembly Part number list on following Service PartsStocked Service Parts ListAt Depot 6000GCF-IPI IPI Valve AssemblyLimited Lifetime Warranty Heat & GLO GAS Appliance Products Limited Lifetime WarrantyDo not Discard this Manual Contact Information