G. Glass Assembly

WARNING

Handle glass doors with care.

• Inspect the gasket to ensure it is undamaged.

• Inspect the glass for cracks, chips or scratches.

Do NOT strike, slam or scratch glass.

Do NOT operate appliance with glass door removed, cracked, broken or scratched.

Replace glass door assembly as a complete appliance.

Removing Glass Assembly

Pull the four glass assembly latches out of the groove on the glass frame. Remove glass door from the appliance (see Figure 12.20).

Replacing Glass Assembly

Replace the glass door on the appliance. Pull out and latch the four glass assembly latches into the groove on the glass frame.

LATCHES

(BOTH BOTTOM

AND TOP)

GLASS

ASSEMBLY

Figure 12.20 Glass Assembly

H. Screen Mesh

The screen mesh is built into front.

I. Grilles and Trim

Install optional marble and brass trim surround kits as de- sired. Marble, brass, brick, tile, or other noncombustible materials can be used to cover up the gap between the sheet rock and the appliance.

Do not obstruct or modify the air inlet/outlet grilles. When overlapping on both sides, leave enough space so that the bottom grille can be lowered and the trim door removed.

J. Hood

Hood is included with the front and required in all installations.

K. Air Shutter Setting

This appliance has an adjustable air shutter (which con- trols the primary air) factory set for the minimum vertical vent run (see Figure 12.21). If your installation has more than the minimum required vertical vent length, adjust- ment of the air shutter may be necessary to obtain opti- mal flame appearance. This should be adjusted by a qualified installer at the time of installation.

By pushing the air shutter handle in, you will be closing the air shutter. To adjust loosen the wing nut. Care should be taken when adjusting the air shutter so as not to cause the appliance to soot. If sooting occurs the air shutter will need to be opened by pulling the handle out. When fin- ished tighten wing nut.

AIR SHUTTER

WING NUT

Figure 12.21

Shutter Settings

 

NG

LP

Burner

1/8 in.

Full Open

Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP2110-900 Rev. F • 6/08

39

Image 39
Contents Hot glass will cause burns Models 6000GCF-IPI6000GCF-IPILPHomeowner Reference Information CongratulationsTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsTools and Supplies Needed Getting StartedSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMantel Projections In. MINFt. MAX Termination Locations Vent Termination Minimum ClearancesSee .4 for specific clearances Alcove Applications Measuring Standards Vent Information and DiagramsVent Table Key Use of ElbowsMinimum Maximum Vent DiagramsTop Vent Horizontal Termination One Elbow Two ElbowsTop Vent Horizontal Termination Three Elbows H1 Maximum V1 + Minimum H1+ H2 V1+ V2 Minimum H1+ H2 Maximum Top Vent Vertical Termination Three ElbowsPipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationNon-Combustible Wall Penetration Installing the Ceiling Firestop Installing Attic ShieldVertical Penetration Framing Temporary Access Panel Appliance PreparationAttaching Sheetrock Ledges Securing and Leveling the Appliance Installing the Flue RestrictorVertical Top Vent Installing the Fiberglass GasketAssembling Pipe Sections Installing Vent PipeAssembly of Vent Sections Attaching Vent to the Firebox AssemblyAssembling DVP-12A Slip Sections Assembling Minimum Installations MI SectionsDisassembly of Vent Sections Securing the Vent Sections Vertical SectionsHorizontal Sections Installing Heat Shield and Horizontal Termination Cap Installing the Horizontal Termination CapHeat Shield Requirements for Horizontal Termination Roof Pitch Min. Ft Installing Roof Flashing and Vertical Termination Cap17 Assembling the Storm Collar Around the Pipe Assembling and Installing Storm CollarPressure Natural Gas Propane Gas InformationFuel Conversions Gas Connection Gas PressuresHigh Altitude Installations Electrical Information Recommendation for WireWall Switch Optional Accessories RequirementsIntellifire Pilot Ignition IPI Wiring Diagram Wall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingRemove Shipping Materials Appliance SetupClean the Appliance AccessoriesInstall the Refractory Ember PlacementPlacing the Ember Material Log #1 SRV2103-107 Positioning the Logs12 Front View Grilles and Trim Glass AssemblyAir Shutter Setting Screen MeshBefore Lighting Appliance Operating InstructionsFinal inspection by Turn off all electric power to the applianceOn position. The ON/OFF switch may Lighting Appliance IPI IgnitionFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Intellifire Ignition SystemSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksDoors, Surrounds Inspect Maintenance TasksAppliance Dimension Diagram Reference MaterialsLocation Inches Millimeters DVP vent components Vent Components DiagramsHorizontal Termination Cap Kit Horizontal Termination CapWall Shield Firestop Heat ShieldNot for use on these models Extended Heat ShieldDVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP Log Set Assembly Part number list on following Service PartsService Parts List StockedAt Depot 6000GCF-IPI IPI Valve AssemblyLimited Lifetime Warranty Heat & GLO GAS Appliance Products Limited Lifetime WarrantyDo not Discard this Manual Contact Information