Heat & Glo LifeStyle 6000GCF-IPILP owner manual Inspect Maintenance Tasks, Doors, Surrounds

Page 46

Inspect

 

Maintenance Tasks

 

 

 

Doors, Surrounds

1.

Assess condition of screen and replace as necessary. Recommend addition of screen if one is not present.

and Fronts

 

 

2.

Inspect for scratches, dents or other damage and repair as necessary.

 

 

 

 

 

3.

Verify no obstructions to airflow through the louvers.

 

 

 

 

4.

Verify maintenance of proper clearance to combustible household objects.

 

 

 

Gasket Seal, Glass

1.

Inspect gasket seal and its condition.

Assembly and Glass

 

 

2.

Inspect glass panels for scratches and nicks that can lead to breakage when exposed to heat.

 

 

 

 

 

3.

Confirm there is no damage to glass or glass frame. Replace as necessary.

 

 

 

 

4.

Verify that latches engage properly, clip studs are not stripped, and glass attachment components are

 

 

intact and operating properly. Replace as necessary.

 

5.

Clean glass. Replace glass assembly if severely coated with silicate deposits that cannot be removed.

 

 

 

Valve Compartment

1.

Vacuum and wipe out dust, cobwebs, debris or pet hair. Use caution when cleaning these areas. Screw

and Firebox Top

 

tips that have penetrated the sheet metal are sharp and should be avoided.

 

 

 

 

2.

Remove any foreign objects.

 

 

 

 

3.

Verify unobstructed air circulation.

 

 

 

Logs

1.

Inspect for broken, damaged, or missing logs. Replace as necessary.

 

 

 

 

2.

Verify correct log placement and no flame impingement causing sooting. Correct as necessary.

 

 

 

Firebox

1.

Inspect for paint condition, warpage, corrosion or perforation. Sand and repaint as necessary.

 

 

 

 

2.

Replace appliance if firebox has been perforated.

 

 

 

Burner Ignition and

1.

Verify burner is properly secured and aligned with pilot or igniter.

Operation

 

 

2.

Clean off burner top, inspect for plugged ports, corrosion or deterioration. Replace burner if necessary.

 

 

 

 

 

3.

Replace ember materials with new dime-size and shape pieces. Do not block ports or obstruct lighting paths.

 

 

 

 

4.

Check for smooth lighting and ignition carryover to all ports. Verify there is no ignition delay.

 

 

 

 

5.

Inspect for lifting or other flame problems.

 

 

 

 

6.

Verify air shutter is clear of dust and debris.

 

 

 

 

7.

Inspect orifice for soot, dirt or corrosion.

 

 

 

 

8.

Verify manifold and inlet pressures. Adjust regulator as required.

 

 

 

 

9.

Inspect pilot flame strength. Clean or replace orifice as necessary.

 

 

 

 

10.

Inspect thermocouple/thermopile or IPI sensor rod for soot, corrosion and deterioration. Clean with emery

 

 

cloth or replace as required.

 

 

 

11. Verify millivolt output. Replace as necessary.

 

 

 

Venting

1.

Inspect venting for blockage or obstruction such as bird nests, leaves, etc.

 

 

 

 

2.

Confirm that termination cap remains clear and unobstructed by plants, etc.

 

 

 

 

3.

Verify that termination cap clearance to subsequent construction (building additions, decks, fences or

 

 

sheds) has been maintained.

 

 

 

 

4.

Inspect for corrosion or separation.

 

 

 

 

5.

Verify weather stripping, sealing and flashing remains intact.

 

 

 

 

6.

Inspect draft shield to verify it is not bent, damaged or missing.

 

 

 

Remote controls

1.

Verify operation of remote.

 

 

 

 

2.

Replace batteries in remote transmitters and battery-powered receivers.

 

 

 

 

3.

Verify batteries have been removed from battery back-up IPI systems to prevent premature battery failure

 

 

or leaking.

46

Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP2110-900 Rev. F • 6/08

Image 46
Contents Models 6000GCF-IPI6000GCF-IPILP Hot glass will cause burnsCongratulations Homeowner Reference InformationTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGetting Started Tools and Supplies NeededFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesIn. MIN Mantel ProjectionsFt. MAX Vent Termination Minimum Clearances Termination LocationsSee .4 for specific clearances Alcove Applications Use of Elbows Vent Information and DiagramsVent Table Key Measuring StandardsTwo Elbows Vent DiagramsTop Vent Horizontal Termination One Elbow Minimum MaximumTop Vent Horizontal Termination Three Elbows H1 Maximum V1 + Minimum Top Vent Vertical Termination Three Elbows H1+ H2 V1+ V2 Minimum H1+ H2 MaximumVent Clearances and Framing Pipe Clearances to CombustiblesCombustible Wall Penetration Wall Penetration FramingNon-Combustible Wall Penetration Installing Attic Shield Installing the Ceiling FirestopVertical Penetration Framing Appliance Preparation Temporary Access PanelAttaching Sheetrock Ledges Installing the Flue Restrictor Securing and Leveling the ApplianceInstalling the Fiberglass Gasket Vertical Top VentAttaching Vent to the Firebox Assembly Installing Vent PipeAssembly of Vent Sections Assembling Pipe SectionsAssembling Minimum Installations MI Sections Assembling DVP-12A Slip SectionsSecuring the Vent Sections Vertical Sections Disassembly of Vent SectionsHorizontal Sections Installing the Horizontal Termination Cap Installing Heat Shield and Horizontal Termination CapHeat Shield Requirements for Horizontal Termination Installing Roof Flashing and Vertical Termination Cap Roof Pitch Min. FtAssembling and Installing Storm Collar 17 Assembling the Storm Collar Around the PipeGas Pressures Gas InformationFuel Conversions Gas Connection Pressure Natural Gas PropaneHigh Altitude Installations Optional Accessories Requirements Recommendation for WireWall Switch Electrical InformationIntellifire Pilot Ignition IPI Wiring Diagram Junction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialAccessories Appliance SetupClean the Appliance Remove Shipping MaterialsEmber Placement Install the RefractoryPlacing the Ember Material Positioning the Logs Log #1 SRV2103-10712 Front View Screen Mesh Glass AssemblyAir Shutter Setting Grilles and TrimOperating Instructions Before Lighting ApplianceLighting Appliance IPI Ignition Turn off all electric power to the applianceOn position. The ON/OFF switch may Final inspection byInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Intellifire Ignition System TroubleshootingSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Doors, SurroundsReference Materials Appliance Dimension DiagramLocation Inches Millimeters Vent Components Diagrams DVP vent componentsHeat Shield Horizontal Termination CapWall Shield Firestop Horizontal Termination Cap KitExtended Heat Shield Not for use on these modelsDVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP Service Parts Log Set Assembly Part number list on followingStocked Service Parts ListAt Depot IPI Valve Assembly 6000GCF-IPILimited Lifetime Warranty Limited Lifetime Warranty Heat & GLO GAS Appliance ProductsContact Information Do not Discard this Manual