Vermont Casting DVRTSB Glass Cleaning, Ceramic Refractory Installation, Installation of Logs

Page 22

DVRTSB Bay Window Fireplace

Glass Cleaning

It is necessary to periodically clean glass. During start- up condensation, which is normal, forms on the inside of the glass. This condensation causes lint, dust and other airborne particles to cling to glass surface.

Also initial paint curing may deposit a slight film on the glass. It is therefore recommended glass be cleaned two or three times with a non-ammonia based house- hold cleaner and warm water (We recommend gas fireplace glass cleaner) within the first few weeks of operation.

After the initial cleaning process the glass should be cleaned two or three times during each operating season depending on the environment in the house.

Clean the glass after the first two weeks of operation.

Ceramic Refractory Installation

The rear wall refractory panels are installed in the unit prior to shipment.

1.Unpack the ceramic refractory panels from their carton.

Handle the refractory material carefully, the panels are fragile.

2.Place the front floor refractory panels on the base of the fireplace. (Fig. 38)

3.Place both side panels in place along the side of the base. (Fig. 38)

 

FP1393

Fig. 38

DVRTSB ceramic panels.

22

Installation of Logs

The logs can be identified by the number cast into their underside.

The logs must be correctly placed in the order described for the correct operation of the fireplace.

Refer to Figures 30 & 40 for log location and alignment.

1.Unpack the logs from the shipping carton. Handle the logs carefully as they are fragile.

Handle and dispose of the plastic bags in a safe manner. They are not toys and should be kept away from infants.

2.Remove front glass/frame assembly.

3.Place the left rear (B105) and right rear (B106) logs in place on the grate. The square hole in the underside of the logs locates over the corner legs of the grate. The inner ends of the log point to the center of the burner.

4.Place the left front (B107) and right front (B108) logs in place. Again the square holes fit over the corner legs of the grate. The inner ends of these logs have a recess in the underside which locates over knobs on the top of the B105 and B106 logs to lock the inner end in place.

5.Place the center front (B109) log in place. The notch on the outer end of this log locates around the third outer prong on the grate and the inner ends with a round recess rest on lug on top of the left front log (B107).

6.Place the center rear (B110) log in place. The square hole in the underside of this log, locates over the rear center bar of the grate. The inner end of the log having a rectangular recess rests on the rectangular knob on the end of the left front log, (B107).

B105

B110

 

 

 

B106

 

B107

B108

 

 

 

B109

 

 

 

LG298

Fig. 39

DVRTSB logs.

 

 

 

10003848

Image 22
Contents Homeowner’s Installation Operating Manual Table of Contents Installation & Operating Instructions National Fuel Gas Code Ansi Z223.1/NFPAFraming Dimensions Fireplace Dimensions Installed as Top VentDvrtsb Top Vent Fireplace Dimensions Installed as Rear Vent Dvrtsb Rear VentMantels Locating Your FireplaceClearance to Combustibles HearthGas Specifications Gas Line InstallationFinal Finishing Gas Inlet and Manifold PressuresAlternate Switch Location Remote ON/OFF Switch InstallationEB-1 Electrical Box Optional Top Vent Application Remove flue cover and flue pipeGeneral Venting Information Termination Location Location of Vent TerminationCanadian Installations1 US Installations2 Termination location requirementsUSA Installations General Information for Connecting Vent PipesCanadian Installations Twist Lock PipesRear Wall Vent Applications How to Use the Vent GraphRear Wall Vent Installation Example aVertical Sidewall Applications Zero clearance sleeve is only required for combustible wallsVertical Sidewall Installation Maximum vent run with elbowsAlways install horizontal venting on a level plane Horizontal length requirementBelow Grade Installation Vertical Through-the-Roof ApplicationsVertical Through-The-Roof Installation Enlarged ends of the vent section always face downwardAttic Insulation Shield Upper Floor Twist Lock Venting Components Glass/Frame Removal Glass InformationLouvre Removal Side Glass FrameInstallation of Logs Glass CleaningCeramic Refractory Installation Clean the glass after the first two weeks of operationCeramic Ember Rocks Pt. # Flame Characteristics Flame & Temperature AdjustmentLava Rock & Ember Material RN/RP ModelsLighting and Operating Instructions To Turn Off Gas To HeaterTroubleshooting the Gas Control System Honeywell Millivolt Valve PSE Pilot Fuel Conversion InstructionsSIT top Convertible Pilot SIT 820 Nova Gas Control Valve FigBurner and Burner Compartment Cleaning the Standing Pilot Control SystemBrass Trim Description OFFDvrtsb Dvrtsb Bay Window Fireplace Fan Kits Model Function/s Controlled Remote ControlsON/OFF and Temperature Wall mounted thermostat controlDvrtsb Bay Window Fireplace Limited Lifetime Warranty Efficiency Ratings