DVRTSB Bay Window Fireplace

STEP 2

Measure wall thickness and cut zero clearance sleeve parts to proper length (MAXIMUM 12”/305 mm). As- semble sleeve and attach to firestop with #8 sheet metal screws (supplied). Install firestop assembly. (Fig. 24)

Zero clearance sleeve is only required for combustible walls.

Adjustable Zero

Max. Length 12”

Clearance Sleeve

(305mm)

 

#8 Screws (2)

#8 Screws (2)

 

 

#8 Screws

 

(2)

Firestop

Adjustable Zero Clearance Sleeve

ZCS101

Fig. 24 Adjustable zero clearance sleeve.

 

STEP 3

Place fireplace into position. (Fig. 25) Measure the ver- tical height (X) required from the base of the flue collars to the center of the wall opening.

 

X

X

 

 

FP1384

Fig. 25

Vertical height requirements.

 

STEP 4

Apply a bead of silicone to the inner and outer flue collars of the fireplace and using appropriate length of pipe section(s) attach to fireplace with three (3) screws. Follow with the installation of the inner and outer elbow, again secure joints as described in “Connecting Vent Pipes”.

STEP 5

Measure the horizontal length requirement including a 2” (51 mm) overlap, i.e. from the elbow to the outside wall face plus 2” (51 mm) (or the distance required if installing a second 90° elbow. (Fig. 26)

Always install horizontal venting on a level plane.

STEP 6

Use appropriate length of pipe sections - telescopic or fixed and install. The section which goes through the wall is packaged with the starter kit, and can be cut to suit if necessary.

Sealing vent pipe and firestop gaps with high tem- perature sealant will restrict cold air being drawn in around fireplace.

X

X

FP1385

Fig. 26 Horizontal length requirement.

STEP 7

Apply high temperature sealant to 4” (100mm) and 7” (175mm) collars or the termination one inch away from crimped end. Guide the vent terminations 4” and 7” col- lars into their respective vent pipes. Double check that the vent pipes overlap the collars by 2” (50mm). Secure the termination to the wall with screws provided and caulk around the wall plate to weatherproof.

Support the horizontal pipes every 36” (914mm) with metal pipe straps.

Check the fireplace to make sure that it is levelled and properly positioned.

16

10003848

Image 16
Contents Homeowner’s Installation Operating Manual Table of Contents Installation & Operating Instructions National Fuel Gas Code Ansi Z223.1/NFPAFraming Dimensions Fireplace Dimensions Installed as Top VentDvrtsb Top Vent Fireplace Dimensions Installed as Rear Vent Dvrtsb Rear VentLocating Your Fireplace Clearance to CombustiblesMantels HearthGas Line Installation Final FinishingGas Specifications Gas Inlet and Manifold PressuresAlternate Switch Location Remote ON/OFF Switch InstallationEB-1 Electrical Box Optional Top Vent Application Remove flue cover and flue pipeGeneral Venting Information Termination Location Location of Vent TerminationCanadian Installations1 US Installations2 Termination location requirementsGeneral Information for Connecting Vent Pipes Canadian InstallationsUSA Installations Twist Lock PipesHow to Use the Vent Graph Rear Wall Vent InstallationRear Wall Vent Applications Example aVertical Sidewall Applications Zero clearance sleeve is only required for combustible wallsVertical Sidewall Installation Maximum vent run with elbowsAlways install horizontal venting on a level plane Horizontal length requirementBelow Grade Installation Vertical Through-the-Roof ApplicationsVertical Through-The-Roof Installation Enlarged ends of the vent section always face downwardAttic Insulation Shield Upper Floor Twist Lock Venting Components Glass Information Louvre RemovalGlass/Frame Removal Side Glass FrameGlass Cleaning Ceramic Refractory InstallationInstallation of Logs Clean the glass after the first two weeks of operationFlame Characteristics Flame & Temperature Adjustment Lava Rock & Ember MaterialCeramic Ember Rocks Pt. # RN/RP ModelsLighting and Operating Instructions To Turn Off Gas To HeaterTroubleshooting the Gas Control System Honeywell Millivolt Valve Fuel Conversion Instructions SIT top Convertible PilotPSE Pilot SIT 820 Nova Gas Control Valve FigBurner and Burner Compartment Cleaning the Standing Pilot Control SystemBrass Trim Description OFFDvrtsb Dvrtsb Bay Window Fireplace Fan Kits Remote Controls ON/OFF and TemperatureModel Function/s Controlled Wall mounted thermostat controlDvrtsb Bay Window Fireplace Limited Lifetime Warranty Efficiency Ratings