Vermont Casting DVRTSB manual General Information for Connecting Vent Pipes, Twist Lock Pipes

Page 12

DVRTSB Bay Window Fireplace

Termination Clearances

Termination clearances for buildings with combustible and noncombustible exteriors.

Inside Corner

Outside Corner

Alcove Applications*

 

 

 

F =

 

 

G =

 

Combustible

G

Combustible

 

6"

(152 mm)

 

6" (152 mm)

V

Noncombustible

 

 

2"

(51 mm)

 

Noncombustible

 

V

 

F

 

2" (51 mm)

 

 

Balcony -

Balcony -

with no side wall

with perpendicular side wall

M

M

 

V

V

 

P

M =

Combustible &

Noncombustible

Combustible &

M = 24" (610 mm)

Noncombustible

P = 20” (508 mm)

12" (305 mm)

D

C C

V

E

O

E = Min. 6” (152 mm) for non-vinyl sidewalls Min. 12” (305 mm) for vinyl sidewalls

O = 8’ (2.4 m) Min.

No.

 

 

of Caps

DMin.

CMax.

1

3’ (.9 mm)

2 x DActual

2

6’ (1.8 m)

1 x DActual

3

9’ (2.7 m)

2/3 x DActual

4

12’ (3.7 m)

1/2 x DActual

DMin. = # of Termination caps x 3

CMax. = (2 / # termination caps) x DActual

584-15

*NOTE: Termination in an alcove space (spaces open only on one side and with an overhang) is permitted with the dimensions specified for vinyl or non-vinyl siding and soffits. 1. There must be a 3’ (914 mm) minimum between termination caps. 2. All mechanical air intakes within 10’ (1 m) of a termination cap must be a minimum of 3’ (914 mm) below the termination cap. 3. All gravity air intakes within 3’ (914 mm) of a termination cap must be a minimum of 1’ (305 mm) below the termination cap.

Fig. 12a Termination clearances.

General Information for Connecting Vent Pipes

Canadian Installations:

Venting system must be installed in accordance with the current CSA-B149.1 installation code.

USA Installations:

The venting system must conform with local codes and/ or the current National Fuel Gas code ANSI Z223.1/ NFPA 54.

Only direct vent components manufactured by CFM Corporation can be used in Direct Vent systems.

Twist Lock Pipes

When using CFM Corporation twist-lock pipe it is not necessary to use sealant on the joints. The only areas of the venting system that need to be sealed with high temperature silicone sealant are the sliding joints of any telescopic vent section used in the system.

12

To join the twist lock pipes together, simply align the beads of the male end with the grooves of the female end, twisting the pipe until the flange on the female end contacts the external flange on the male end. It is recommended that you secure the joints with three (3) sheet metal screws, however this is not mandatory with twist lock pipe.

NOTE: For ease of assembly, use a lubricant (Vaseline or similar substance) on male end of twist lock pipe prior to assembly.

 

Male End

Female End

 

Screw Holes

TWL100

Fig. 14

Twist-lock pipe joints.

 

 

 

10003848

Image 12
Contents Homeowner’s Installation Operating Manual Table of Contents Installation & Operating Instructions National Fuel Gas Code Ansi Z223.1/NFPAFireplace Dimensions Installed as Top Vent Framing DimensionsDvrtsb Top Vent Fireplace Dimensions Installed as Rear Vent Dvrtsb Rear VentLocating Your Fireplace Clearance to CombustiblesMantels HearthGas Line Installation Final FinishingGas Specifications Gas Inlet and Manifold PressuresRemote ON/OFF Switch Installation Alternate Switch LocationEB-1 Electrical Box Optional Top Vent Application Remove flue cover and flue pipeGeneral Venting Information Termination Location Location of Vent TerminationCanadian Installations1 US Installations2 Termination location requirementsGeneral Information for Connecting Vent Pipes Canadian InstallationsUSA Installations Twist Lock PipesHow to Use the Vent Graph Rear Wall Vent InstallationRear Wall Vent Applications Example aVertical Sidewall Applications Zero clearance sleeve is only required for combustible wallsVertical Sidewall Installation Maximum vent run with elbowsAlways install horizontal venting on a level plane Horizontal length requirementBelow Grade Installation Vertical Through-the-Roof ApplicationsVertical Through-The-Roof Installation Enlarged ends of the vent section always face downwardAttic Insulation Shield Upper Floor Twist Lock Venting Components Glass Information Louvre RemovalGlass/Frame Removal Side Glass FrameGlass Cleaning Ceramic Refractory InstallationInstallation of Logs Clean the glass after the first two weeks of operationFlame Characteristics Flame & Temperature Adjustment Lava Rock & Ember MaterialCeramic Ember Rocks Pt. # RN/RP ModelsLighting and Operating Instructions To Turn Off Gas To HeaterTroubleshooting the Gas Control System Honeywell Millivolt Valve Fuel Conversion Instructions SIT top Convertible PilotPSE Pilot SIT 820 Nova Gas Control Valve FigCleaning the Standing Pilot Control System Burner and Burner CompartmentBrass Trim Description OFFDvrtsb Dvrtsb Bay Window Fireplace Fan Kits Remote Controls ON/OFF and TemperatureModel Function/s Controlled Wall mounted thermostat controlDvrtsb Bay Window Fireplace Limited Lifetime Warranty Efficiency Ratings