Vermont Casting DVRTSB manual Fireplace Dimensions Installed as Top Vent, Dvrtsb Top Vent

Page 4

DVRTSB Bay Window Fireplace

 

Fireplace Dimensions (Installed as Top Vent)

 

 

G

G

 

 

 

F

F

 

 

 

E

 

 

 

 

 

Gas

 

 

 

 

Line

 

EB1 Box Inlet

 

 

Inlet

 

 

 

 

 

 

 

 

2³⁄"

4¹⁄"

 

K - Rough Opening Depth

 

(60mm)

 

 

(105mm)

 

 

 

 

M - Rough Opening Width

 

 

 

 

 

 

5⁷⁄₁₆"

 

3⁷⁄"

 

Rough

(138mm)

 

(99mm)

 

 

H

 

 

Opening

 

I

 

Height

 

 

 

 

 

J

 

 

 

 

 

L

A

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

7/8" Dia.

 

 

 

 

1¹⁄" Dia.

 

 

C

 

 

 

 

D

 

3848

Fig. 2

Fireplace specifications and framing dimensions.

 

 

 

Ref.

DVRTSB (Top Vent)

A

35”

(888 mm)

B

34³⁄

(873 mm)

C

32³⁄

(831 mm)

D

34⁷⁄

(885 mm)

E

2¹⁄

(56 mm)

F

2”

(51 mm)

G

17¹⁄

(444 mm)

H

24”

(610 mm)

I

5¹⁄

(139 mm)

J

2³⁄

(61 mm)

 

Framing Dimensions

K

 

24” (610 mm) minus one finishing material

 

 

thickness to be even with face of unit

L

 

Not to be framed until unit is set in place due

 

 

to 3¹⁄” (79 mm) allowance for flue collar.

M

 

35” (888 mm) minus twice the finishing material

 

 

thickness to be even with face of unit.

 

 

 

4

10003848

Image 4
Contents Homeowner’s Installation Operating Manual Table of Contents Installation & Operating Instructions National Fuel Gas Code Ansi Z223.1/NFPAFraming Dimensions Fireplace Dimensions Installed as Top VentDvrtsb Top Vent Fireplace Dimensions Installed as Rear Vent Dvrtsb Rear VentLocating Your Fireplace Clearance to CombustiblesMantels HearthGas Line Installation Final FinishingGas Specifications Gas Inlet and Manifold PressuresAlternate Switch Location Remote ON/OFF Switch InstallationEB-1 Electrical Box Optional Top Vent Application Remove flue cover and flue pipeGeneral Venting Information Termination Location Location of Vent TerminationCanadian Installations1 US Installations2 Termination location requirementsGeneral Information for Connecting Vent Pipes Canadian InstallationsUSA Installations Twist Lock PipesHow to Use the Vent Graph Rear Wall Vent InstallationRear Wall Vent Applications Example aVertical Sidewall Applications Zero clearance sleeve is only required for combustible wallsVertical Sidewall Installation Maximum vent run with elbowsAlways install horizontal venting on a level plane Horizontal length requirementBelow Grade Installation Vertical Through-the-Roof ApplicationsVertical Through-The-Roof Installation Enlarged ends of the vent section always face downwardAttic Insulation Shield Upper Floor Twist Lock Venting Components Glass Information Louvre RemovalGlass/Frame Removal Side Glass FrameGlass Cleaning Ceramic Refractory InstallationInstallation of Logs Clean the glass after the first two weeks of operationFlame Characteristics Flame & Temperature Adjustment Lava Rock & Ember MaterialCeramic Ember Rocks Pt. # RN/RP ModelsLighting and Operating Instructions To Turn Off Gas To HeaterTroubleshooting the Gas Control System Honeywell Millivolt Valve Fuel Conversion Instructions SIT top Convertible PilotPSE Pilot SIT 820 Nova Gas Control Valve FigBurner and Burner Compartment Cleaning the Standing Pilot Control SystemBrass Trim Description OFFDvrtsb Dvrtsb Bay Window Fireplace Fan Kits Remote Controls ON/OFF and TemperatureModel Function/s Controlled Wall mounted thermostat controlDvrtsb Bay Window Fireplace Limited Lifetime Warranty Efficiency Ratings