Vermont Casting DVRTSB manual Locating Your Fireplace, Clearance to Combustibles, Mantels, Hearth

Page 6

DVRTSB Bay Window Fireplace

Locating Your Fireplace

 

X

 

 

 

X

X

 

 

B

 

 

A

Y

 

 

 

 

 

Y

Z

A

Y

 

 

 

 

 

 

FP1374

Fig. 1 Locating gas fireplace.

A.Wall Location (Fig. 1)

Y (Minimum distance between a glass panel and a parallel wall = 3’ (914 mm)

Z (Minimum distance between edge of a glass panel and an adjacent wall = 2-3/4” (70 mm)

B.Island Location (FIg. 1)

X (Maximum length of horizontal venting = 20’ (6.1 m). Refer to the venting section of this manual for specific dimensions.

Clearance to Combustibles

Top of Unit to Ceiling

36” (914 mm)

Front of Unit to Combustibles

36” (914 mm)

Appliance

 

Top

(0”) 0 mm to stand-off

Bottom

(0”) 0 mm

Back

(1/2”) 13 mm to rear panel

Side Wall

(0”) 0 mm.

(behind side glass panel)

 

Venting

 

Concentric sections of DV Vent

 

Top, bottom & sides

(1”) 25 mm

Non-concentric sections of DV Vent

Side and bottom

(1”) 25 mm

Top

(2”) 51 mm

Mantels

The height that a combustible mantel is fitted above the fireplace is dependent on the depth of the mantel. This also applies to the distance between the mantel leg (if fitted) and the fireplace.

For the correct mounting height and widths refer to Figure and the Mantel Chart below.

Noncombustible mantels and legs may be installed at any height and width around the appliance.

When using paint or lacquer to finish the mantel, such paint or lacquer must be heat resistant to prevent discoloration.

 

 

 

V

 

 

 

W

 

 

 

X

 

 

 

Y

 

 

 

Z

A B C

D

E

 

 

 

Fireplace

 

 

 

Top Louvre

 

 

 

Assembly

 

 

 

Top of

 

 

 

Combustion

 

 

 

Chamber

Bottom of Door

CFM146

Trim

 

 

Mantel Chart

 

Mantel Shelf

 

Mantel from Top

 

 

Ref.

or Breast Plate

Ref.

of Comb. Chamber

 

Depth

 

 

V

10” (254 mm)

A

19” (483 mm)

W

8” (203 mm)

B

17” (432 mm)

X

6” (152 mm)

C

15” (381 mm)

Y

4” (101 mm)

D

13” (330 mm)

Z

2” (51 mm)

E

11” (279 mm)

Fig. 4 Combustible mantel minimum installation.

NOTE: The above mantel shelf chart will be applied for the front and two sides of the fireplace.

Hearth

A hearth is not mandatory but is recommended for aesthetic purposes. We recommend a noncombustible hearth which projects out 12” (305mm) or more from the front of the fireplace.

Cold climate installation recommendation:

When installing this unit against a non- insulated exterior wall or chase, it is mandatory that the outer walls be insulated to conform to applicable insulation codes.

Framing and Finishing

1.Choose the unit location.

2.Place the unit into position and secure it to the floor with 1¹⁄₂” (38 mm) screws, or nails. The holes to secure the unit to the floor are located just behind the access door grille on the left and right side of the unit.

3.Frame in the fireplace with a header across the top. It is important to allow for the finished wall face when setting the depth of the frame.

4.Drywall (sheetrock) or wood material may be placed with a zero clearance to the top edges of the appli-

6

10003848

Image 6
Contents Homeowner’s Installation Operating Manual Table of Contents Installation & Operating Instructions National Fuel Gas Code Ansi Z223.1/NFPAFireplace Dimensions Installed as Top Vent Framing DimensionsDvrtsb Top Vent Fireplace Dimensions Installed as Rear Vent Dvrtsb Rear VentMantels Locating Your FireplaceClearance to Combustibles HearthGas Specifications Gas Line InstallationFinal Finishing Gas Inlet and Manifold PressuresRemote ON/OFF Switch Installation Alternate Switch LocationEB-1 Electrical Box Optional Top Vent Application Remove flue cover and flue pipeGeneral Venting Information Termination Location Location of Vent TerminationCanadian Installations1 US Installations2 Termination location requirementsUSA Installations General Information for Connecting Vent PipesCanadian Installations Twist Lock PipesRear Wall Vent Applications How to Use the Vent GraphRear Wall Vent Installation Example aVertical Sidewall Applications Zero clearance sleeve is only required for combustible wallsVertical Sidewall Installation Maximum vent run with elbowsAlways install horizontal venting on a level plane Horizontal length requirementBelow Grade Installation Vertical Through-the-Roof ApplicationsVertical Through-The-Roof Installation Enlarged ends of the vent section always face downwardAttic Insulation Shield Upper Floor Twist Lock Venting Components Glass/Frame Removal Glass InformationLouvre Removal Side Glass FrameInstallation of Logs Glass CleaningCeramic Refractory Installation Clean the glass after the first two weeks of operationCeramic Ember Rocks Pt. # Flame Characteristics Flame & Temperature AdjustmentLava Rock & Ember Material RN/RP ModelsLighting and Operating Instructions To Turn Off Gas To HeaterTroubleshooting the Gas Control System Honeywell Millivolt Valve PSE Pilot Fuel Conversion InstructionsSIT top Convertible Pilot SIT 820 Nova Gas Control Valve FigCleaning the Standing Pilot Control System Burner and Burner CompartmentBrass Trim Description OFFDvrtsb Dvrtsb Bay Window Fireplace Fan Kits Model Function/s Controlled Remote ControlsON/OFF and Temperature Wall mounted thermostat controlDvrtsb Bay Window Fireplace Limited Lifetime Warranty Efficiency Ratings