Vermont Casting DVRTSB manual EB-1 Electrical Box, Remote ON/OFF Switch Installation

Page 8

DVRTSB Bay Window Fireplace

EB-1 Electrical Box

The fireplace, when installed, must be elec- trically connected and grounded in accord- ance with local codes or, in the absence of local codes, with the current CSA C22.1 Canadian Electrical Code

For USA installations follow the local codes and the national electrical code ANSI/NFPA No. 70.

It is strongly suggested that the wiring of the EB-1 Electrical Junction Box be carried out by a licensed electrician.

Ensure that the power to the supply line has been disconnected before commenc- ing this procedure.

The EB-1 Electrical junction box has been supplied standard on this model to allow for the easy connection of an optional fan kit. (Fig. )

To connect the EB-1 box to the house electrical supply follow the steps below.

1.Remove the front cover of the EB-1 box.

2.Remove the plug socket assembly from the EB-1 box.

3.Feed the supply line in from the outside through the electrical knock-out.

4.Connect the ground wire of the supply line to the green screw of the socket assembly.

5.Connect the white wire of the power line to the chrome screw of the socket assembly.

6.Connect the black wire of the power supply line to the brass screw (polarized) of the socket assembly.

7.Refit the socket assembly back into the electrical box and replace the cover plate.

8.The EB-1 electrical junction box is now ready to supply power to the FK12 or FK24 fan kits, if fitted.

Electrical Box (EB-1)

1¹⁄₂” Gas Inlet Holes

 

FK24 Fan

Retaining

Kit

Mounting

Screw

Studs

 

FP1375

Fig. 6 EB-1 electrical box.

Remote ON/OFF Switch Installation

1.Thread the wiring through the holes on the end panels of the appliance. Take care not to cut the wire or insulation on metal edges. Route the wire to

a conveniently located receptacle box.

2.Attach the wire to the ON/OFF switch and install the switch into the receptacle box.

3.Connect the other ends of the wire to the gas control valve. (Fig. 7)

Remote ON/OFF Switch or Ther- mostat or Remote Control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TP

Gas

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TH

 

 

 

 

 

 

 

 

 

 

Control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TP

Valve

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TH

FP1376

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fig. 7 Remote switch wiring diagram.

 

Alternate Switch Location

The remote switch can be installed on the front/side of the access door. Simply mount the switch to the bracket provided and screw the bracket to either side of the frame, lining up the screws with the pre-punched holes. (Fig. 8)

FP1377

Fig. 8 Alternate switch location.

8

10003848

Image 8
Contents Homeowner’s Installation Operating Manual Table of Contents Installation & Operating Instructions National Fuel Gas Code Ansi Z223.1/NFPADvrtsb Top Vent Fireplace Dimensions Installed as Top VentFraming Dimensions Fireplace Dimensions Installed as Rear Vent Dvrtsb Rear VentLocating Your Fireplace Clearance to CombustiblesMantels HearthGas Line Installation Final FinishingGas Specifications Gas Inlet and Manifold PressuresEB-1 Electrical Box Remote ON/OFF Switch InstallationAlternate Switch Location Optional Top Vent Application Remove flue cover and flue pipeGeneral Venting Information Termination Location Location of Vent TerminationCanadian Installations1 US Installations2 Termination location requirementsGeneral Information for Connecting Vent Pipes Canadian InstallationsUSA Installations Twist Lock PipesHow to Use the Vent Graph Rear Wall Vent InstallationRear Wall Vent Applications Example aVertical Sidewall Applications Zero clearance sleeve is only required for combustible wallsVertical Sidewall Installation Maximum vent run with elbowsAlways install horizontal venting on a level plane Horizontal length requirementBelow Grade Installation Vertical Through-the-Roof ApplicationsVertical Through-The-Roof Installation Enlarged ends of the vent section always face downwardAttic Insulation Shield Upper Floor Twist Lock Venting Components Glass Information Louvre RemovalGlass/Frame Removal Side Glass FrameGlass Cleaning Ceramic Refractory InstallationInstallation of Logs Clean the glass after the first two weeks of operationFlame Characteristics Flame & Temperature Adjustment Lava Rock & Ember MaterialCeramic Ember Rocks Pt. # RN/RP ModelsLighting and Operating Instructions To Turn Off Gas To HeaterTroubleshooting the Gas Control System Honeywell Millivolt Valve Fuel Conversion Instructions SIT top Convertible PilotPSE Pilot SIT 820 Nova Gas Control Valve FigBrass Trim Cleaning the Standing Pilot Control SystemBurner and Burner Compartment Description OFFDvrtsb Dvrtsb Bay Window Fireplace Fan Kits Remote Controls ON/OFF and TemperatureModel Function/s Controlled Wall mounted thermostat controlDvrtsb Bay Window Fireplace Limited Lifetime Warranty Efficiency Ratings