Vermont Casting DVRTSB manual Fuel Conversion Instructions, SIT top Convertible Pilot, PSE Pilot

Page 27

Fuel Conversion Instructions

The conversion of this appliance from one gas to another must be carried out by a qualified service technician.

1.

Disconnect power to unit and shut off the gas supply.

2.

Remove the glass (Refer to “Glass Removal” Sec-

DVRTSB Bay Window Fireplace

b. Unscrew the exposed conversion screw.

c. Insert the new color coded conversion screw. Do not over-tighten the screw, it must be fingertight.

d. Refit the regulator cap.

e. Mount conversion label supplied with conversion screw to valve in a visible position.

 

tion.)

3.

Carefully remove the logs & lava rock material.

4.

Remove the screws that are holding the burner

 

housing in place.

5.

Remove the burner housing. On this model you may

 

need to loosen the pilot bracket retaining screw/nut

 

and tilt pilot and bracket assembly to gain sufficient

 

clearance to remove the burner housing.

6.

Remove front and rear orifice and replace with ori-

 

fice supplied in the conversion kit.

7.

SIT top Convertible Pilot

 

Gently lift off pilot hood from the pilot. (Do not

 

remove the spring clip holding the hood in place).

 

Using a size 5/32” Allen key unscrew the exposed

 

orifice. Insert the new orifice supplied in the kit, do

 

not over tighten the orifice. Replace the pilot hood

 

ensuring the index tab aligns with the notch on the

A

B

C

 

OFF

 

P

 

I

O

TOL

FC107

E

 

OFF

 

P

 

 

I

O

TO

L

F

D

FC108

hood.

PSE Pilot

Using a suitable wrench on hexagonal body unscrew

the pilot hood assembly from the pilot, do not twist

the hood itself. Remove the orifice and replace it

with the new orifice supplied in the kit. Refit the pilot

hood assembly. Do not over-tighten the pilot hood.

The hood must return to its original alignment. Take

care not to damage the thermocouple, thermopile or

igniter.

8. SIT 820 NOVA Gas Control Valve (Fig. 11)

a) Using a Torx T20 or slotted screwdriver, remove

and save three pressure regulator mounting screws

(A), pressure regulator tower (B) and diaphram (C).

b) Ensure the rubber gasket (D) is properly posi-

tioned and install the new HI/LO pressure regulator

to valve using the new screws (E) supplied with the

kit. Tighten screws securely. (Reference torque - 25

in.LB)

c) Install the enclosed identification label (F) to the

valve body where it can be easily seen.

Honeywell Gas Control Valve (Fig. 12)

The Honeywell valve fitted to this unit is suitable for use with LP or Natural Gas. It is converted to re- quired gas application by the installation of a color coded “conversion screw”.

a. Using a suitable small screw-driver lift out the central regulator cap from the “HI/LO” knob on the valve.

Fig. 45 NOVA SIT820 gas valve.

9. Reassemble

 

 

fireplace in

Regulator Cap

Conversion

the reverse

 

 

Screw

order, except

 

 

 

for front

 

L

glass. Leave

I

HO

 

 

 

this off until

 

Pressure

 

Regulator

after unit

 

Housing

has been

 

 

checked for

 

 

leaks and

 

 

the gas sup-

 

 

ply has been

 

 

bled.

 

 

10. After bleed-

 

HV102

ing gas line

Fig. 46 Honeywell gas valve.

and check-

 

 

ing for leaks with a soap solution, replace the front glass. Fire up the unit, check for flame impingment on logs, adjusting them if necessary. Check manifold and supply pressures. Make sure screws are tight- ened after checking pressure.

The procedure for converting from one gas to another is the same regardless of the initial gas used. The only variation is in the orifice sizes and component part numbers. Your authorized service provider will en- sure correct parts are used.

10003848

27

Image 27
Contents Homeowner’s Installation Operating Manual Table of Contents National Fuel Gas Code Ansi Z223.1/NFPA Installation & Operating InstructionsFireplace Dimensions Installed as Top Vent Framing DimensionsDvrtsb Top Vent Dvrtsb Rear Vent Fireplace Dimensions Installed as Rear VentHearth Locating Your FireplaceClearance to Combustibles MantelsGas Inlet and Manifold Pressures Gas Line InstallationFinal Finishing Gas SpecificationsRemote ON/OFF Switch Installation Alternate Switch LocationEB-1 Electrical Box Remove flue cover and flue pipe Optional Top Vent ApplicationLocation of Vent Termination General Venting Information Termination LocationTermination location requirements Canadian Installations1 US Installations2Twist Lock Pipes General Information for Connecting Vent PipesCanadian Installations USA InstallationsExample a How to Use the Vent GraphRear Wall Vent Installation Rear Wall Vent ApplicationsZero clearance sleeve is only required for combustible walls Vertical Sidewall ApplicationsMaximum vent run with elbows Vertical Sidewall InstallationHorizontal length requirement Always install horizontal venting on a level planeVertical Through-the-Roof Applications Below Grade InstallationEnlarged ends of the vent section always face downward Vertical Through-The-Roof InstallationAttic Insulation Shield Upper Floor Twist Lock Venting Components Side Glass Frame Glass InformationLouvre Removal Glass/Frame RemovalClean the glass after the first two weeks of operation Glass CleaningCeramic Refractory Installation Installation of LogsRN/RP Models Flame Characteristics Flame & Temperature AdjustmentLava Rock & Ember Material Ceramic Ember Rocks Pt. #To Turn Off Gas To Heater Lighting and Operating InstructionsTroubleshooting the Gas Control System Honeywell Millivolt Valve SIT 820 Nova Gas Control Valve Fig Fuel Conversion InstructionsSIT top Convertible Pilot PSE PilotCleaning the Standing Pilot Control System Burner and Burner CompartmentBrass Trim OFF DescriptionDvrtsb Dvrtsb Bay Window Fireplace Fan Kits Wall mounted thermostat control Remote ControlsON/OFF and Temperature Model Function/s ControlledDvrtsb Bay Window Fireplace Limited Lifetime Warranty Efficiency Ratings