Regency L676S-NG1 Rigid Pipe Venting Systems, Basic Horizontal & Vertical Terminations

Page 18

INSTALLATION

RIGID PIPE VENTING SYSTEMS

BASIC HORIZONTAL & VERTICAL TERMINATIONS

INSTALLATION

Rigid Pipe Vent Systems offer a complete line of component parts for installation of both horizontal and vertical installations. Many items are offered in decorative black, as well as galvanized finish.

The minimum components required for a basic horizontal termination are:

1

AstroCap XL

1

90o Elbow

1

Rigid Pipe Adaptor

1

Wall Thimble

Vertical Terminal

Storm Collar

Flashing

Ceiling Firestop

Vinyl Siding

Standoff (Optional)

Pipe

Vent Guard - if required*

(Part #946-506/P)

1 Length of pipe to suit wall thickness

The minimum components required for a basic vertical termination are:

LengthAstroCap XL Termination Cap (Part #946-623/P)

1

Vertical Termination Cap

1

Rigid Pipe Adaptor

1

Lengths of pipe to adequately

Pipe Length

Wall Thimble

(Mandatory in all

Horizontal Terminations)

Pipe Length

 

penetrate roof

1

Ceiling Firestop

1

Flashing

1

Storm Collar

Wall thickness is measured from the back standoffs to the inside mounting surface of termination cap.For siding other than vinyl furring strips may be used, instead of the vinyl siding standoff, to create a level surface to mount the vent terminal.TheTerminal must not be recessed into siding.Measure the wall thickness including furring strips.

If a Vinyl Siding Standoff is required (it must be used with vinyl siding), measure to outside surface of wall without siding and add 2 inches.

90o Elbow

Rigid Pipe

Adapter

(770-994)

Alternate

Horizontal Termination

Caps

Part # 5DT-ST14 (14")

Part # 5DT-ST36 (36")

WARNING:

Do not combine venting components from different venting systems.

Exception: However, use of the AstroCap XLTM is acceptable with all systems.

This product has been evaluated by Intertek for using a Rigid Pipe Adaptor in conjunction with Simpson DV Pro, Metal-Fab Sure-Seal and Selkirk Direct-Temp systems. Use of these systems with the Rigid Pipe adaptor is deemed acceptable and does not affect the Intertek WHI listing of components.

When using Rigid Vent other than

Simpson Dura-Vent, 3 screws must be used to secure rigid pipe to adaptor.

The FPI AstroCap XLTM is certified for installations using FPI venting systems as well as Simpson Dura-Vent®Direct Vent Pro and Selkirk Direct-Temp. AstroCap XLTM is a proprietary trademark of FPI Fireplace Products International Ltd. Dura-Vent® and Direct Vent are registered and/or proprietary trade- marks of Simpson Dura-Vent Co. Inc.

18

Regency® L676S Direct Vent Gas Fireplace

Image 18
Contents L676 Sunrise Gas Fireplace Manufactured Mobile Home Requirements Information for MOBILE/MANUFACTURED Homes After First SaleTable of Contents Serial No. / No de serie Safety LabelCopy of Safety Decal Factory Equipped For Altitude 0-4500ft -1372mRequirements For the State of Massachusetts onlyUnit Dimensions Installation Checklist InstallationGeneral Safety Information Important Message Save These InstructionsFinished Floor Manufactured Mobile Home Additional RequirementsHeat Release KIT Locating Your GAS FireplaceClearances Mantel Clearances Mantel LEG ClearancesImportant Header must be metal stud. All other framing may Installed. See Diagram 3 for detailsFraming FramingFinishing Non-combustibleMaterial + 3/8 + 3/4Unit Assembly Prior to Installation Finishing TemplateVenting Introduction Vent Restrictor Plate Latch No adjustment requiredVent Restrictor Position Latch Location HingeDoorExterior Vent Termination Requirements Minimum Clearance RequirementsCanada1 Venting Arrangements Horizontal Termination FlexRigid Pipe Venting Systems Basic Horizontal & Vertical Terminations8 Rigid Pipe Cross Reference Chart Installation Allowable Horizontal Terminations Vent Restrictor On SetVertical Vent Restrictor On Set Option + H1 Option + V1 H + H1Option + H1 V + V1 With these options, max. totalAllowable Vertical Terminations Unit Installation with Horizontal Termination Diagram Unit Installation With Vertical TerminationThis allows for small adjustments Minimum VentUnit Installation Astrocap XLGAS Pipe Pressure Testing Pilot AdjustmentGAS Line Installation High ElevationMinimum Air Shutter Opening Aeration AdjustmentWiring Diagram OptionalConversion KIT #526-969 from NG to LP LP Conversion Kit Contains Qty DescriptionLeaks Firebox base Panel InstallationStainless Steel Panels Black Enamel Panels Slots on fl oor of fi rebox baseHoles on bottom Panel Left panelUse this hole on panel clip Spread the supplied Glass Crystals or optional Ceramic Spa Level adjustment Faceplate & Door Frame InstallationAdjustment for fi nishing materials Location of mounting bracketsOperating Instructions Copy of Lighting Plate Instructions For Your Safety Read Before LightingNormal Operating Sounds GAS Appliances Lighting InstructionsMaintenance DC Spark Box Wires DC Spark BOX Battery ReplacementDC Spark BOX Replacement DC Spark Box LocationValve Tray Replacement Door Hinge with door removedSlots for back panel Location of Screws Disconnect 2 generator wires Disconnect 2 wiresDC Spark Box Electrode Wire Valve Tray OutParts List Main AssemblyHeat Wave Kit Release Kit Burner Assembly Regency L676S Direct Vent Gas Fireplace Regency L676S Direct Vent Gas Fireplace Warranty ConditionsInstaller Please complete the following information