Regency L676S-NG1 Disconnect 2 wires, DC Spark Box Electrode Wire, Valve Tray Out

Page 41

MAINTENANCE

11) Disconnect the inlet gas line from the

14) Disconnect the spark electrode wire from

16) Completely pull out the valve tray.

valve.

the DC spark box.

 

12)Unplug the green (TH) and white (TP/TH) wires from the valve.

Disconnect 2 wires

13)Disconnect the 2 DC Spark generator wires from the DC spark box located in front of the valve.

DC Spark Box Electrode Wire

15)Remove the 16 screws that hold the valve tray to the firebox and slightly pull out the valve tray.

Valve Tray Out

17)Replace the valve tray and reverse steps to re-install.

18)Turn on the gas supply and check for gas leaks.

19)Re-install the inner panels.

20) Re-install the burner.

21)Re-install the pilot shield.

22)Re-install the glass door.

23)Re-install the faceplate.

24)Check the inlet and outlet pressures.

25)Check operation of flame control.

26)Check for proper flame appearance.

MAINTENANCE

Location of Screws.

Disconnect 2 generator wires

Regency® L676S Direct Vent Gas Fireplace

41

Image 41
Contents L676 Sunrise Gas Fireplace Information for MOBILE/MANUFACTURED Homes After First Sale Manufactured Mobile Home RequirementsTable of Contents Copy of Safety Decal Safety LabelSerial No. / No de serie Factory Equipped For Altitude 0-4500ft -1372mFor the State of Massachusetts only RequirementsUnit Dimensions General Safety Information InstallationInstallation Checklist Important Message Save These InstructionsHeat Release KIT Manufactured Mobile Home Additional RequirementsFinished Floor Locating Your GAS FireplaceClearances Mantel LEG Clearances Mantel ClearancesFraming Installed. See Diagram 3 for detailsImportant Header must be metal stud. All other framing may FramingMaterial FinishingNon-combustible + 3/4 + 3/8Venting Introduction Unit Assembly Prior to InstallationFinishing Template Vent Restrictor Position No adjustment requiredVent Restrictor Plate Latch Latch Location HingeDoorCanada1 Exterior Vent Termination RequirementsMinimum Clearance Requirements Horizontal Termination Flex Venting ArrangementsBasic Horizontal & Vertical Terminations Rigid Pipe Venting Systems8 Rigid Pipe Cross Reference Chart Installation Vertical Vent Restrictor On Set Allowable Horizontal TerminationsVent Restrictor On Set Option + V1 H + H1 Option + H1+ H1 V + V1 With these options, max. total OptionAllowable Vertical Terminations Unit Installation with Horizontal Termination This allows for small adjustments Unit Installation With Vertical TerminationDiagram Minimum VentAstrocap XL Unit InstallationGAS Line Installation Pilot AdjustmentGAS Pipe Pressure Testing High ElevationWiring Diagram Aeration AdjustmentMinimum Air Shutter Opening OptionalLP Conversion Kit Contains Qty Description Conversion KIT #526-969 from NG to LPLeaks Stainless Steel Panels Black Enamel Panels Panel InstallationFirebox base Slots on fl oor of fi rebox baseUse this hole on panel clip Holes on bottom PanelLeft panel Spread the supplied Glass Crystals or optional Ceramic Spa Adjustment for fi nishing materials Faceplate & Door Frame InstallationLevel adjustment Location of mounting bracketsOperating Instructions Normal Operating Sounds GAS Appliances For Your Safety Read Before LightingCopy of Lighting Plate Instructions Lighting InstructionsMaintenance DC Spark BOX Replacement DC Spark BOX Battery ReplacementDC Spark Box Wires DC Spark Box LocationSlots for back panel Valve Tray ReplacementDoor Hinge with door removed DC Spark Box Electrode Wire Disconnect 2 wiresLocation of Screws Disconnect 2 generator wires Valve Tray OutMain Assembly Parts ListHeat Wave Kit Release Kit Burner Assembly Regency L676S Direct Vent Gas Fireplace Regency L676S Direct Vent Gas Fireplace Conditions WarrantyInstaller Please complete the following information